B2 Reservoir Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Marina Coast Water District is undertaking the construction of a new 2.16-million-gallon potable water reservoir, designated B2, adjacent to the existing B1 reservoir in Seaside, California, to meet current and projected water demands outlined in the 2020 Master Plan. The project includes connecting B2 to B1 via a 270-foot, 20-inch transmission main, along with extensive site improvements such as a paved access road linking to Colonel Durham Street, a 90-foot retaining wall, a percolation basin, 8-foot perimeter fencing, and a 12-foot swing gate. Within the B1 reservoir yard, upgrades involve relocating the booster pump station, modernizing electrical panels, installing an emergency generator, replacing inlet and outlet valves, and removing fencing to integrate both facilities into a single operational area. Construction is scheduled to commence in June 2025 and extend for approximately 18 months, concluding in June 2026, with work conducted during standard weekday hours. All activities are centered on the former Fort Ord site within the CSUMB campus, with performance and inspection occurring on-site. The project is subject to a comprehensive environmental compliance framework under the California Environmental Quality Act, centered on a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program that mandates strict adherence to air quality, biological, and erosion control standards. Key requirements include a 50% reduction in PM₁₀ emissions via ultra-low sulfur fuels, soot traps, and advanced engine technology; daily biological monitoring during ground-disturbing work; and the presence of a qualified biologist and a contractor-trained biological monitor to oversee compliance. Work involving vegetation removal is restricted to September 16 through January 31 to avoid avian nesting seasons, and construction crews must immediately halt operations if special-status species are encountered, awaiting consultation with the California Department of Fish and Wildlife. Mitigation efforts also include protective fencing, weekly removal of food waste, equipment cleaning to prevent invasive species spread, and a rare plant restoration plan if Kellogg’s horkelia is impacted. No federal contract clauses, pricing data, or traditional acquisition structures such as CLINs, payment offices, or invoicing systems are present; instead, oversight is managed through MCWD’s Senior Project Manager, Jack Gao, with reporting obligations directed to state agencies including the State Water Board, CNDDB, and California Department of Fish and Wildlife. All environmental documentation, including the Mitigated Negative Declaration and Notice of Determination,

General Info

Construction of 2.16-million-gallon reservoir and site upgrades in Seaside, CA, with strict environmental compliance from June 2025 to June 2026.

Agency

California → Marina Coast Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Colonel Durham St and 6th Ave, Seaside, CA, 93933

Set-Aside

NONE

Documents

(9)

2025081340_CDFW_Comment on B2 Reservoir Project MND

PDFcomment-letter

2025081340_RWQCB Comment Letter on B2 Reservoir Project IS/MND

PDFcomment-letter

MCWD B2 Reservoir Project Final IS/MND October 2025

PDFenvironmental-document

Draft Initial Study/Mitigated Negative Declaration for B2 Reservoir Project

PDFenvironmental-assessment

MCWD B2 Reservoir Project Mitigation Monitoring and Reporting Program

PDFmmrp

B2 Reservoir Project Summary Form 08282025

PDFenvironmental-summary

Notice of Determination for B2 Reservoir Project MCWD

PDFnotice-of-determination

Notice of Completion for B2 Reservoir Project

PDFnotice-of-completion

B2 Reservoir Project Notice of Availability and Intent

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marina Coast Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marina Coast Water District
Office AddressN/A
Contacts
Jack GaoSenior Project Manager

Interested Companies (1)

Show more
Denise Duffy & Associates
Monterey, CA

Full Description

Show more
The proposed project involves construction of a new 2.16-million-gallon potable water reservoir (B2) adjacent to the existing B1 reservoir to meet current and future demands of the Ord Community as identified in MCWD’s 2020 Master Plan. The project also includes associated site and infrastructure improvements. The B2 reservoir would connect to the existing B1 transmission main through approximately 270 feet of 20-inch pipeline. Site improvements include a paved access road and driveway connection to Colonel Durham Street, a 90-foot retaining wall, a percolation basin, 8-foot perimeter fencing, and a 12-foot swing gate. At the B1 reservoir yard, improvements include relocating the booster pump station, upgrading electrical panels, adding an emergency generator, replacing inlet/outlet valves, and removing fencing between the yards to create one contiguous facility. Activities are expected to begin in 2025 and last 18 months, with weekday work hours.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Utah

POSTED

about 17 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation # Skytop Lodge, Inc., Monroe County
Skytop Lodge, Inc. is seeking bids for the Skytop Lodge Sewage Treatment Plant Improvements Project under Contract 2026-01, with a scheduled bid opening on Friday, September 18, 2026, at 10:00 AM local time via PennBid. The project involves significant upgrades to the existing sewage treatment facility, including the installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, and a UV Disinfection System, along with all associated work detailed in the Contract Documents. Bidding documents are exclusively available through the PennBid website, and all official updates, including addenda, will be posted there; bidders are solely responsible for obtaining current information from this source. A pre-bid conference is scheduled for August 25, 2026, at the site in Canadensis, PA, and while attendance is encouraged, it is not mandatory. All bids must include a bid security of at least 10% of the total bid amount in the form of a certified check or bid bond, and questions regarding the documents must be submitted exclusively through PennBid—telephone inquiries will not be accepted. Bidders are required to comply with state antibid-rigging laws and must submit a non-collusion affidavit with their bid. The project is subject to Act 141 of 2022, mandating the use of E-Verify for all employees performing work, and requires submission of a Public Works Employment Verification Form as a condition for award. The Pennsylvania Prevailing Wage Act applies due to the project’s estimated cost exceeding $25,000. Bids must remain irrevocable for 60 days after opening, extendable to 120 days if award is delayed by external approvals, bond sales, or grant awards. The project is partially funded by a grant from the Commonwealth Financing Authority, and bidders are assured equal opportunity without discrimination on the basis of gender, race, color, creed, sex, age, physical disability, or national origin, with the same protections extended to all workers involved in contract performance.
Monroe County

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details