North Glendora Reservoir Replacement Project

Forecast
forecast_8b267069-a7b2-4999-a87c-62db53f174daState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Glendora Reservoir Replacement Project, managed by the City of Glendora, involves the construction of two new 0.3 MG welded steel reservoirs on a 2.0-acre site in Glendora, California. The project scope includes the demolition and removal of an existing bolted steel reservoir, the installation of inlet, outlet, overflow, and bottom drain pipelines, and the widening of the existing reservoir access road to improve water storage reliability for the service area. The construction schedule is phased from January 1, 2024, through March 7, 2025, encompassing site preparation, grading, tank construction, and piping connections. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Mitigated Negative Declaration. Technical assessments have addressed biological resources, paleontological and cultural resource impacts, noise and vibration levels for nearby residents, and air quality and greenhouse gas emissions. Geotechnical evaluations were conducted using ASTM and California standards to inform design and construction, including seismic and slope stability analyses. Compliance requirements include adherence to South Coast Air Quality Management District rules for dust and VOC emissions, as well as the implementation of a Storm Water Pollution Prevention Plan. Paul Zampiello, Assistant Public Works Director, serves as the primary project contact.

General Info

City of Glendora constructing two new steel reservoirs from January 2024 to March 2025.

Place of Performance

North Glendora Avenue and North Easley Canyon Road, CA, 91741

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendora
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Glendora
Office AddressN/A
Contacts
Paul ZampielloAssistant Public Works Director
Konnie DobrevaVice President of Environmental Services

Interested Companies (1)

EPD SolutionsIrvine, California

Full Description

Show more
The project (“North Glendora Reservoir Replacement”) involves the following components on the 2.0-acre Project site: 1) site preparation and grading of a new pad to the west of the existing reservoir pad, 2) construction of new 0.3 MG reservoir (NGR-A), 3) demolition of the existing bolted steel reservoir (North Glendora B [previously known as Reservoir 19B]), and 4) construction of second 0.3 MG reservoir (NGR-B) at approximately the same location as reservoir B. Additional improvements would include construction of inlet/outlet pipelines, overflow and bottom drain pipelines, and widening of the existing reservoir access road.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
W072 Endist Pittsburgh

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → City of Glendora

Same awarding agency

NAICS: 237990
SLED
South Hills Bike Park
Solicitation # 2025120441
The City of Glendora is developing a formalized bike park and an improved system of connecting trails within the 318-acre South Hills Wilderness area. The project features a one-acre core area containing a bicycle pump track, jump trails, staging and seating areas, a shade pavilion, and a vault-style ADA-compliant restroom facility. The trail system includes a six-mile cross-country multi-use trail ringing the site, as well as dedicated downhill trails for beginners and intermediate to advanced riders. Supporting infrastructure includes a regraded access road off Glendora Avenue and a parking area with 17 main spots and 7 parallel spots. All trails must be constructed by professional builders according to National Forest Service Trail Class 3 specifications, and all core amenities must be connected by ADA-compliant concrete walkways. The project has undergone extensive environmental review, resulting in a Mitigated Negative Declaration. Key assessments include biological resource evaluations, jurisdictional wetland delineations, and geotechnical investigations to guide construction. Traffic analyses determined that the project is a community-serving facility with minimal impact, generating approximately 60 daily trips, which negated the need for detailed vehicle miles traveled or level of service analyses. Environmental compliance requires a qualified biologist to conduct weekly monitoring during construction near aquatic features and within 24 hours of rainfall, with the authority to halt work for non-compliance. The project also adheres to the Glendora Zoning Ordinance and federal and state historic preservation requirements, including consultation with Native American tribes.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS