Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Washougal Request for Qualifications for a Progressive Design-Builder 32nd Street Rail Crossing

Closed
2024-RFQ-056State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 441110
New
International
Supply and Delivery of Fleet Vehicles
Solicitation # RFP26-11
The City of Port Moody is soliciting proposals under RFP26-11 to establish one or more preferred dealers for the supply and delivery of Class 1 through Class 6 light-duty and medium-duty fleet vehicles. The scope of work focuses on 2027 vehicle offerings across five categories, including compact and full-size sedans, SUVs, cargo vans, and light-duty and medium-duty trucks, with flexibility for new models and fuel types from 2028 onward. Beyond vehicle procurement, the contract encompasses customized vehicle outfitting, the supply of replacement parts, and on-call warranty, non-warranty, and recall service repairs. While the City primarily intends to purchase vehicles, leasing options, including lease-only or lease-with-option-to-purchase arrangements, may be considered on a case-by-case basis. Proposals must be submitted electronically via the designated Bidding System by November 26, 2026. Requirements for proponents include a 10 percent digital bid bond, a valid City of Port Moody business license, and evidence of being in good standing with WorkSafeBC. All vehicles must be delivered freight prepaid, FOB to the City of Port Moody Works Yard, and must meet specific minimum standards, including a full power package. The City will not pay deposits on vehicle orders, and payments will be issued following the receipt and inspection of the vehicles. Award decisions will be based on a standard single-stage evaluation of the highest-ranked proponents.
City of Port Moody

POSTED

1 day ago

DEADLINE

in 28 days
NAICS: 441110
New
SLED
FY27 CO 60s045 Full Size 4-Door SUV 4x4 Rebid
Solicitation # 27-494DOT-FINAD-B-54569
Solicitation 27-494DOT-FINAD-B-54569 is a rebid for the procurement of full-size 4-door 4x4 sport utility vehicles for the Illinois Department of Transportation. These vehicles are intended for transporting public officials and sensitive testing equipment, as well as towing message boards and flood pumps during emergency repair projects. The response deadline is November 4, 2026. To be considered responsive, bidders must provide vehicles meeting strict technical specifications, including a minimum 8-passenger seating capacity in a 2-3-3 configuration, a wheelbase of at least 120 inches, and an overall length of at least 210 inches. Powertrain requirements specify a V8 naturally aspirated or V6 turbocharged engine delivering at least 350 HP and 350 lb-ft of torque, with a requirement for Flexible Fuel or Hybrid Electric compatibility. Additionally, vehicles must have a minimum towing capacity of 8,000 lbs with a factory-installed Class IV hitch receiver and 4WD or AWD capabilities. The contract is governed by the State of Illinois Standard Terms and Conditions, requiring a minimum 12-month warranty on supplies. Vendors must submit descriptive manufacturer literature and completed specifications with their bids to avoid rejection. Payment is managed under the State Prompt Payment Act, and the contract may be funded partially or totally by federal funds. Awardees must comply with various state certifications, including the Illinois Department Human Rights Act, the Illinois Procurement Code's revolving door provisions, and cybersecurity directives from the U.S. Department of Homeland Security. The State reserves the right to inspect all units prior to acceptance to ensure they are fully operational and defect-free. Legal claims arising from the contract must be filed exclusively with the Illinois Court of Claims.
FINADMIN494 - Finance & Administration

POSTED

1 day ago

DEADLINE

in 6 days

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

5

32nd St Rail Crossing Project - DBIA 530 Agreement

PDF, High priority: read this firstcontract-document
High

City of Washougal RFQ 2024-RFQ-056 Progressive Design-Builder 32nd Street Rail Crossing

PDF, High priority: read this firstrfq
High

OMWBE Design-Build Contract Award Reporting Form

XLSX, High priority: read this firstreporting-form
High

RFQ Washougal 32nd St Rail Crossing Project

PDF, High priority: read this firstrfq
High

Identification of Project Table Form

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Washougal
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kelly BrownPoint of Contact

Full Description

Show more
The City seeks to design and permit 32nd Street Corridor enhancements, including the separation of the at-grade rail crossing between Main Street/B Street and Evergreen Way. The City has obtained permission from the Washington State Capital Projects Advisory Review Board Project Review Committee (PRC) on September 26, 2024 to perform the project using the progressive design-build delivery method. The City is anticipating approximately 2 years for full design, right of way, and environmental completion, with construction completion estimated to take 32 months. 32nd Street is a critical north-south economic corridor for the Washougal community, providing important connections among State Route 14 (SR-14), the Port of Camas-Washougal Industrial Park, Washougal Town Center, and prime undeveloped land. Approximately 1.8 miles in length, the 32nd Street Corridor includes a mix of residential, public space, commercial, and industrial uses.  The existing at-grade crossing along 32nd Street is one of the busiest crossings along the BNSF Railway (BNSF) line in the State of Washington with an average of 45 trains operating in the corridor daily and a capacity of 60 trains per day. This configuration has created road-rail conflicts as trains frequently block the crossing, resulting in traffic backing up onto SR14 as far as a quarter of a mile to the south. As a result, access to Washougal Town Center, is indirect and limited, presenting an obstacle to downtown and waterfront revitalization around the Columbia River and the Port of Camas-Washougal jobs center.The City seeks to design and permit 32nd Street Corridor enhancements, including the separation of the at-grade rail crossing between Main Street/B Street and Evergreen Way. The City’s original plan included a below-grade rail crossing.  Although the below-grade crossing is the City’s preferred option, the City is looking for a Design-Builder that can assist with determining whether a below-grade rail crossing, or an overpass will best suit the project and the available funding.  The Project will not only remove an at grade crossing, the City anticipates that the Project will but is also expected to serve the growth needs of the community, reduce congestion hotspots, increase safety, enhance connectivity, and provide multi-modal improvements and opportunities for economically struggling and minority neighborhoods. In addition to the new grade-separated railroad crossing, roadway improvements are anticipated to include a roundabout at 32nd and Main Street/B Street south of the rail crossing, a roundabout at 32nd Street and Evergreen Way north of the crossing, intersection improvements at F Place, E Street, and A Street, and a sidewalk and multi-use path. The 32nd Street rail crossing also will provide the opportunity for a third BNSF track – requested by BNSF – which will boost freight and economic opportunity along the rail corridor.  The City has obtained permission from the Washington State Capital Projects Advisory Review Board Project Review Committee (PRC) on September 26, 2024, to perform the project using the progressive design-build delivery method.  The City is anticipating approximately 2 years for full design, right of way, and environmental completion, with construction completion estimated to take 32 months.  There are numerous challenges with meeting these deadlines for which the City would like assistance from the Design-Build Team:The City has received a Railroad Crossing Elimination (RCE) Grant in the amount of $40,480,000 from Federal Rail Association. (FRA).  In addition, the City also received approximately $8,096,000 in Move Ahead Washington funds from Washington Department of Transportation (WSDOT) and $1,900,000 in the 2023-2025 Transportation Budget through WSDOT.  The total available funding for the project to date is $50,476,000.  However, recent estimates indicate that the City will have to raise additional funding to accomplish the project, and the original design of the project may need to be modified to fit within the available and reasonable future funding.  The Design-Build Team’s first task will be to evaluate the project to determine its feasibility within the City’s budget.The Design-Build Team will assist the City in navigating the rail authority (BNSF) approval process withing a timely manner.The City wants to minimize the impacts of the project and reduce the amount of right of way that needs to be taken.The Design-Build Team will be responsible for developing reliable schedules and construction means and methods that will minimize road closures.  In addition, the Design-Build Team will assist the City with public outreach to make sure the community has up to date and reliable information regarding any disruption.  Being one of the first and largest RCE Grants awarded, the City wants to ensure successful and swift completion of the project.  Further project documentation can be found on the City’s website.  Throughout the RFQ advertisement, documents may be added and will be up to the bidder to check the website regularly for any additional information.  A link to the website is provided below: https://www.cityofwashougal.us/710/Documents-Reports-PresentationsThe City, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all Proposers that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

More opportunities from Washington → City of Washougal

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS