Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Civil Site Work & Erosion Control Contractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with the Transportation and Public Works Department of the City of Santa Rosa involves providing comprehensive civil site work and erosion control services for local government projects. The selected contractor will be responsible for site preparation, selective demolition, and excavation and trenching activities performed in accordance with Caltrans Standard Specifications. Key deliverables include the implementation of water pollution control measures, the installation of silt fences and erosion control blankets, and the final restoration of surfaces. Interested parties must be registered with the Department of Industrial Relations to be eligible for this engagement. The solicitation was posted on October 6, 2026, and requires a response by November 5, 2026. This project falls under NAICS code 238910 and focuses on delivering fully prepared sites and excavated trenches to support prime contractors.

General Info

Civil site work and erosion control subcontract for City of Santa Rosa projects.

Documents

This scope was carved out of C02471.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bennett Valley Golf Course Irrigation System Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Transportation and Public Works Department of City of Santa Rosa
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site preparation, excavation, and erosion control for prime contractors on City local government projects. Implements water pollution control, performs selective site demolition, and executes trenching and excavation per Caltrans Standard Specifications. Installs erosion control blankets and silt fences. Requires DIR registration. Delivers prepared site, excavated trenches, and restored surfaces.

Similar Contracts

Same NAICS industry code

More opportunities from California → Transportation and Public Works Department of City of Santa Rosa

Same awarding agency

SLED
Bennett Valley Golf Course Irrigation System Improvements
Solicitation # C02471
The City of Santa Rosa, through its Transportation and Public Works Department, is soliciting bids for the Bennett Valley Golf Course Irrigation System Improvements project, contract number C02471. The scope of work involves providing all labor, materials, and equipment to install and test piping, valves, and hydraulic control components, as well as the removal of existing pumping equipment and the installation of two identical submersible well pumping systems. The project also includes specific concrete work with a minimum 28-day compressive strength of 4,000 psi and the application of shale surfacing meeting strict durability and compaction standards. All materials and equipment must adhere to AWWA, ASTM, IEEE, NEMA, and NEC standards, as well as California Electrical and Well Standards. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide a bid bond of 10% of the maximum bid amount, and the successful contractor will be required to provide performance and payment bonds for 100% of the contract price. The period of performance is 130 working days from the Notice to Proceed. Payment terms specify that the City will pay undisputed amounts within 30 days of receiving a complete monthly application for payment. The contractor must ensure compliance with California Labor Code prevailing wage requirements and the Americans with Disabilities Act. Bids must be submitted in a sealed envelope to Jose Mederos by the deadline of November 5, 2026, and bidders must be registered on the PlanetBids portal.

POSTED

23 days ago

DEADLINE

in 8 days
View Details
SLED
Secondary Clarifier No 1 Rehabilitation Project
Solicitation # C01979
The Secondary Clarifier No 1 Rehabilitation Project, solicitation C01979, is issued by the City of Santa Rosa Transportation and Public Works Department. The scope of work involves the rehabilitation of Secondary Clarifier No 1 at the Laguna Treatment Plant, specifically focusing on the demolition, replacement, and resurfacing of the influent feedwell, center column, center cage, and rake arm truss system. Additionally, the contractor must install new vacuum tube straps and a scum spray system. The project must be fully completed within 90 working days from the start date, with a critical operational window required between November 1, 2027, and April 30, 2028. Bidders must be responsive and responsible, possessing the necessary California contractor licenses and the capacity to perform the work. Requirements include a 10 percent bid bond, and the successful awardee must provide performance and payment bonds for 100 percent of the contract price. Evaluation is based on compliance with the Iran Contracting Act for contracts exceeding 1 million dollars and the acquisition of a City business tax certificate within ten days of the award. Technical acceptance requires the solids collection mechanism to function properly with plant effluent for three consecutive days and biological treatment influent for five consecutive days, while scum removal equipment must operate without mechanical issues for 30 days. Payment is structured through monthly itemized applications for labor, materials, and equipment. The contract mandates adherence to prevailing wage requirements, ASCE 7 Chapter 13 seismic design standards, and strict water quality discharge regulations. All equipment exceeding 100 pounds must include lifting lugs, and specific piping identification standards for labeling and color-coding must be followed. Bids must be submitted in sealed envelopes to the Transportation and Public Works Department by the specified deadline.

POSTED

about 1 month ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS