Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Metal Fabrications, Gratings, and Access Doors

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and installation of stainless steel metal walkways, floor plates, and access hatches for City wastewater facility projects managed by the Transportation and Public Works Department of the City of Santa Rosa. The scope of work requires the erection of metal bar grating according to ANSI/NAAMM MBG 531, checkered floor plates, and ASTM C1802 access hatches. A critical requirement for this project is the provision of structural calculations that must be signed and sealed by a licensed Professional Engineer. The contract is categorized under NAICS code 332312 and was posted on September 29, 2026, with a response deadline of November 10, 2026. The selected subcontractor will be responsible for the full delivery and installation of all gratings, floor plates, and access doors as specified in the project requirements.

General Info

Fabrication and installation of stainless steel walkways and hatches for Santa Rosa wastewater projects.

Documents

This scope was carved out of C01979.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Secondary Clarifier No 1 Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Transportation and Public Works Department of City of Santa Rosa
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs metal walkways, floor plates, and access hatches for prime contractors on City wastewater facility projects. Erects metal bar grating per ANSI/NAAMM MBG 531, checkered floor plates, and ASTM C1802 access hatches using stainless steel materials. Requires structural calculations signed and sealed by a Professional Engineer. Delivers installed gratings, floor plates, and access doors.

Similar Contracts

Same NAICS industry code

More opportunities from California → Transportation and Public Works Department of City of Santa Rosa

Same awarding agency

SLED
Bennett Valley Golf Course Irrigation System Improvements
Solicitation # C02471
The City of Santa Rosa, through its Transportation and Public Works Department, is soliciting bids for the Bennett Valley Golf Course Irrigation System Improvements project, contract number C02471. The scope of work involves providing all labor, materials, and equipment to install and test piping, valves, and hydraulic control components, as well as the removal of existing pumping equipment and the installation of two identical submersible well pumping systems. The project also includes specific concrete work with a minimum 28-day compressive strength of 4,000 psi and the application of shale surfacing meeting strict durability and compaction standards. All materials and equipment must adhere to AWWA, ASTM, IEEE, NEMA, and NEC standards, as well as California Electrical and Well Standards. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide a bid bond of 10% of the maximum bid amount, and the successful contractor will be required to provide performance and payment bonds for 100% of the contract price. The period of performance is 130 working days from the Notice to Proceed. Payment terms specify that the City will pay undisputed amounts within 30 days of receiving a complete monthly application for payment. The contractor must ensure compliance with California Labor Code prevailing wage requirements and the Americans with Disabilities Act. Bids must be submitted in a sealed envelope to Jose Mederos by the deadline of November 5, 2026, and bidders must be registered on the PlanetBids portal.

POSTED

23 days ago

DEADLINE

in 8 days
View Details
SLED
Secondary Clarifier No 1 Rehabilitation Project
Solicitation # C01979
The Secondary Clarifier No 1 Rehabilitation Project, solicitation C01979, is issued by the City of Santa Rosa Transportation and Public Works Department. The scope of work involves the rehabilitation of Secondary Clarifier No 1 at the Laguna Treatment Plant, specifically focusing on the demolition, replacement, and resurfacing of the influent feedwell, center column, center cage, and rake arm truss system. Additionally, the contractor must install new vacuum tube straps and a scum spray system. The project must be fully completed within 90 working days from the start date, with a critical operational window required between November 1, 2027, and April 30, 2028. Bidders must be responsive and responsible, possessing the necessary California contractor licenses and the capacity to perform the work. Requirements include a 10 percent bid bond, and the successful awardee must provide performance and payment bonds for 100 percent of the contract price. Evaluation is based on compliance with the Iran Contracting Act for contracts exceeding 1 million dollars and the acquisition of a City business tax certificate within ten days of the award. Technical acceptance requires the solids collection mechanism to function properly with plant effluent for three consecutive days and biological treatment influent for five consecutive days, while scum removal equipment must operate without mechanical issues for 30 days. Payment is structured through monthly itemized applications for labor, materials, and equipment. The contract mandates adherence to prevailing wage requirements, ASCE 7 Chapter 13 seismic design standards, and strict water quality discharge regulations. All equipment exceeding 100 pounds must include lifting lugs, and specific piping identification standards for labeling and color-coding must be followed. Bids must be submitted in sealed envelopes to the Transportation and Public Works Department by the specified deadline.

POSTED

30 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS