Clear Well Construction with Aeration and Pumping Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract requires the construction of a 100,000-gallon underground clear well equipped with a fully integrated aeration system, high-service pumps, electrical infrastructure, and comprehensive control systems to ensure efficient water treatment and distribution. The project involves civil, mechanical, and electrical work to be executed in compliance with applicable engineering and safety standards, with all components designed for long-term reliability and operational efficiency. The scope includes site preparation, excavation, structural installation, system integration, and commissioning of all mechanical and electrical elements to meet performance specifications. The solicitation is categorized as a subcontract under NAICS code 237110 for Water and Sewer Line and Related Structures Construction, issued by the City of Reynolds in Georgia. Responses must be submitted by August 14, 2026, at 6:30 PM, with the opportunity to bid accessible through the state’s procurement portal. The contract does not specify a set-aside designation, and the place of performance and point of contact details are not provided, suggesting that bidders should coordinate directly with the agency for site-specific requirements and logistical details.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → City of Reynolds
Same awarding agency
