Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Closed-Circuit Wind Tunnel Design & Fabrication

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333992
New
DIBBS
ROD, WELDING
Solicitation # SPE8E6-26-T-4590
Solicitation SPE8E6-26-T-4590 is a fixed-price request for quotations issued by the Defense Logistics Agency Troop Support, Construction and Equipment (Class IV) for the procurement of five welding rods, identified by NSN 3439016966247. The requirement is issued under the First Destination Transportation program with terms set as FOB Origin. The original required delivery date is September 4, 2026, with a delivery window of 20 days after the award. The supplies are to be delivered to the US Army A Co 501st DSB 1st Bde 1AD in Hohenfels, Germany. The contract incorporates the DLA Master Solicitation for Automated Simplified Acquisitions and mandates compliance with various technical and quality requirements, including RC001 for source approval and RP001 for palletization. Packaging must adhere to MIL-STD-129 for marking and labeling, with specific requirements for hazardous materials per FED-STD-313 and IP025, or commercial packaging per ASTM D3951 for non-hazardous items. Inspection and acceptance will occur at the destination. Key regulatory compliance includes the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Offerors are required to submit quotes via the DIBBS system, including necessary representations regarding domestic material and the prohibition of covered defense telecommunications equipment.
Defense Logistics Agency

POSTED

2 days ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract calls for the mechanical design, engineering analysis, and fabrication of a closed-circuit wind tunnel featuring a modular construction and a vibration-isolated fan system to ensure operational stability and measurement accuracy. The system must deliver CFD-validated low-turbulence airflow performance, meeting stringent aerodynamic testing requirements for advanced research and development applications. Emphasis is placed on precision engineering to maintain consistent flow quality, minimal noise, and structural integrity under sustained operational loads. The project is issued as a subcontract under the Department of Defense through the W6QK Acc-Rsa organization, with performance required at Redstone Arsenal, Alabama, 35898. The North American Industry Classification System code 333992 indicates classification under Other Commercial and Service Industry Machinery Manufacturing. Submissions are due by July 15, 2026, with the solicitation posted on June 29, 2026. The technical scope demands proven expertise in aerodynamic systems, vibration control, and validated simulation methods to ensure the final facility meets classified performance benchmarks for defense-related testing.

General Info

Design, fabricate, and test a vibration-isolated wind tunnel for defense aerodynamic research at Redstone Arsenal by July 15, 2026.

Agency

Department Of Defense → W6QK Acc-RsaView Agency

NAICS

333992 - Welding and Soldering Equipment ManufacturingView NAICS

Place of Performance

Redstone Arsenal, AL, 35898, USA

Set-Aside

NONE

Documents

This scope was carved out of PANRSA-26-P-0000-037658.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Closed-Circuit Wind Tunnel (24-inch test)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Rsa
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W6QK Acc-Rsa
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Mechanical design, engineering analysis, and fabrication of a closed-circuit wind tunnel with modular construction, vibration-isolated fan system, and CFD-validated low-turbulence airflow performance.

More opportunities from Department Of Defense → W6QK Acc-Rsa

Same awarding agency

NAICS: 336411
New
Federal
FIRE CONTROL RADAR (FCR)
Solicitation # W58RGZ-26-R-0004
Solicitation W58RGZ-26-R-0004 is a request for proposal issued by the Department of Defense, specifically the Army Contracting Command-Redstone, for Performance Based Goals Life Cycle Contractor Support for the Apache AH-64 Fire Control Radar. The contract structure consists of a one-year base period starting in January 2027, with four one-year options and a six-month extension option. It utilizes a combination of Firm Fixed Price and Cost-Plus Fixed Fee structures to manage supply support, manpower reporting, and various technical deliverables. The scope of work involves comprehensive logistics and maintenance support, including the management of contractor reparables, wholesale inventory, and the procurement of replenishment spares. Key requirements include the identification and management of Critical Safety Items such as the Mast Mounted Assembly and its associated components. The contractor is responsible for adhering to strict reporting standards, including Cost and Software Data Reporting, Material Release Order and Backorder reports with a target service availability goal of 85 percent, and the submission of obsolescence alert notices. Technical and security compliance is mandatory, requiring a Secret level Facility Security Clearance and adherence to the DD Form 254. Additionally, the contractor must follow specific procedures to gain access to the Logistics Modernization Program's Total Asset Visibility Contractor portal. The solicitation includes detailed pricing menus and reporting templates for depot repair costs, non-standard repairs, and actual cost and hours history to ensure transparent financial and performance tracking.
Aircraft Manufacturing

POSTED

2 days ago

DEADLINE

in 3 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS