Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Transportation was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CO NP BLCA 10(1) South Rim Drive

Closed
6982AF26SS0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 15 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The National Park Service is seeking to determine interest from qualified small business prime contractors—specifically those certified as HUBZone, women-owned, 8(a), or service-disabled veteran-owned—for a upcoming solicitation to restore roadside safety along South Rim Drive in Colorado following wildfire damage. The project requires selective boulder removal and dispersal, site grading and base preparation, procurement and installation of specialized weathered-look steel guardrail systems with Natina stain coatings, and comprehensive traffic control including one-lane closures and flagging operations across twelve distinct locations. Bidders must demonstrate experience performing identical tasks on projects of equal or greater scope and value, provide a statement of intent to bid, confirm their socioeconomic certifications, and submit a letter from a bonding agent verifying capability to bond for a $2 million single project along with aggregate bonding capacity. The estimated contract value ranges from $700,000 to $2 million, with construction scheduled to begin in early April 2027 and conclude by late May 2027, following a mid-October 2026 award and notice to proceed that allows time to account for the eight-week lead time and curing period for specialized guardrail materials. The solicitation will be advertised in mid-September 2026, and responses to this sources-sought notice are due by 2 p.m. Mountain Time on August 7, 2026, submitted exclusively via email to CFLAcquisitions@dot.gov. All interested firms must be registered in SAM.gov and must comply with SBA size and affiliation rules under 13 CFR 121.103 and 121.108, with penalties for misrepresentation. The place of performance is Montrose, Colorado, and the North American Industry Classification System code is 237310 for heavy and civil engineering construction.

General Info

Small businesses invited to bid on Colorado guardrail project with $700K–$2M value, tight deadlines, and specialized requirements.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Montrose, CO, 81401, USA

Set-Aside

NONE

Documents

(1)

Prelim+Vicinity+Map+-++CO+NP+BLCA+10%281%29+South+Rim+26.07.08.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts

Full Description

Show more

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.


THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.  Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Denise Martinez) for receipt by close of business (2 p.m. local Denver time) on August 7, 2026: 


(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;


(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;


(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $2 million, and your firm’s aggregate bonding capacity; and


(4) Provide a list of road construction projects of equal or greater value and scope to the CO NP BLCA 10(1) South Rim Drive project in which you performed selective boulder removal and dispersal, site grading and base preparation, specialized guardrail procurement and installation, traffic control and sequencing. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.


The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/


PROJECT NUMBER:  CO NP BLCA 10(1)


PROJECT NAME:  South Rim Drive


PROJECT DESCRIPTION: 


The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.


SCOPE OF THE WORK: 


The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive.


Principal work elements include, but are not limited to, the following:


  • Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.

  • Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.

  • Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).

  • Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors.

Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.


To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.


PRINCIPAL WORK ITEMS:


Pay Item  /  Description  /  Quantity


20301-0200  /  REMOVAL OF BOULDER  /  115 Each


20302-1200  /  REMOVAL OF GUARDRAIL  /  475 LF


30202-2000  /  ROADWAY AGGREGATE, METHOD 2  /  170 Ton


61701-4500  /  GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A, STEEL POSTS  /  4,100 LF


61702-0000  /  TERMINAL SYSTEM  /  8 Each


61702-1500  /  TERMINAL SYSTEM, TYPE MGS TANGENT  /  14 Each


ANTICIPATED SCHEDULE: 


  • Advertisement: Mid-September 2026
  • Award: Mid-October 2026
  • Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter)
  • Construction: Early April 2027 – Late May 2027

ESTIMATED COST RANGE: 


The estimated bid range for Schedule A is between $700,000 and $2,000,000.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS