Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commercial Warranty and Post-Delivery Support for LED Signals

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract obligates the vendor to provide warranty-backed repair or replacement of LED signal assemblies that fail to meet specified standards as identified during destination inspection, ensuring compliance with contractual quality requirements. The services must be performed in a timely manner to minimize disruption to operations, and the warranty coverage extends to all non-conforming units discovered after delivery but before final acceptance. The work falls under NAICS code 811212 and is structured as a subcontract under the oversight of Dallas Area Rapid Transit in Texas, with a submission deadline of July 2, 2026. Performance is expected to align with industry best practices for transit signal maintenance, and the vendor must be prepared to respond to defects discovered at the point of delivery or during initial system integration.

General Info

Vendor must repair or replace defective LED signal assemblies under warranty before final acceptance, per DART oversight in Texas.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

811212 - Computer and Office Machine Repair and MaintenanceView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2099815.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LED ASSY, RED LIGHT, SIGNAL 8" 10VDC, WAYSIDE SIGNALS | 2099815

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide warranty-backed repair or replacement of non-conforming LED signal assemblies identified during destination inspection.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Tile and Terrazzo Contractors

POSTED

19 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS