Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Veterans Affairs was posted on October 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commissioning Plan Development and Execution

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
As-Needed Non-Design Engineering Services
Solicitation # RFQ 3982
The Eastern Municipal Water District (EMWD) is soliciting proposals under RFQ 3982 to establish a shortlist of qualified engineering firms for as-needed non-design engineering services. The scope of work is divided into four primary functional areas, including geotechnical services, condition assessment, and construction management support. Specialized personnel requirements include NACE/AMPP certified corrosion specialists, nondestructive testing inspectors, and CCTV inspection crews. The resulting agreement will be for a two-year period commencing April 1, 2027, and ending March 31, 2029, with an optional one-year extension at the District's sole discretion. Services will be performed on a time and expense basis using hourly rate schedules, with individual task orders capped at $150,000.00. Proposers must provide all-inclusive pricing and a minimum of five business references with at least five years of experience, with a preference for public agency references. Required submittals include a statement of qualifications limited to five pages per category, an insurance affidavit, and CAL/OSHA compliance history. The contract requires adherence to equal opportunity employment standards and certification under the Iran Contracting Act for proposals exceeding $1,000,000. There is no specific set-aside status for this solicitation.
Eastern Municipal Water District

POSTED

about 7 hours ago

DEADLINE

in 30 days
NAICS: 541330
New
SLED
As Needed Construction Cost Estimating Services
Solicitation # 2026-RFB-Cost Estimating Services - AHA-HD-011
The Housing Authority of the City of Alameda (AHA) is soliciting bids to establish a pool of qualified firms for as-needed construction cost estimating services over a three-year period from 2026 through 2028. The scope of work focuses on early-stage project planning and budget development for capital improvement projects across a portfolio of over 900 rental units and 15 properties. Key deliverables include the preparation of Independent Cost Estimates (ICE), material takeoffs, cost and value analysis, risk assessments, and support for budget preparation and contractor change order reviews. All associated construction projects will be performed within the City of Alameda, with a general response time expectation of 10 business days. Proposals will be evaluated using a 100-point scoring system, with the highest weights assigned to qualifications and experience (30 points), proposed approach (20 points), and cost analysis and budget (20 points), followed by references (15 points) and lowest overall price (15 points). There is no set-aside status for this solicitation. Awarded consultants must comply with a variety of regulatory requirements, including HUD General Conditions, the Build America, Buy America Act, the Davis-Bacon Act, and state prevailing wage laws. Payments are processed within 30 working days of receipt, and all contracts exceeding $5,000 require payment via Electronic Funds Transfer or ACH. Proposals must be submitted via the Bonfire portal by December 22, 2026.
Housing Authority Of Alameda

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Routine Engineering Services for Streets Projects
Solicitation # 407
The Parish of Jefferson is soliciting Statements of Qualifications from professional firms to provide routine engineering services for streets projects. This solicitation applies to assignments where the total engineering fee, excluding resident inspection services, does not exceed $500,000.00 per assignment. Qualified firms will be eligible for awards for a two-year period beginning August 26, 2026. The contract is parish-wide, and compensation will be negotiated on an hourly rate basis, a fixed fee basis, or a combination of both. To be eligible, at least one principal and the professional in charge of the project must be a registered professional engineer in Louisiana. The selection process is qualification-based, requiring a minimum cumulative score of 70% to be deemed qualified. Evaluation criteria include professional training and experience (35 points), capacity for timely completion (20 points), location of the principal office (6 to 15 points), past performance on Parish contracts (10 points), and prior successful completion of similar projects (5 points). The highest and lowest scores for each firm will be dropped from the final calculation. Applicants must submit a Statement of Qualifications Professional Services Questionnaire, including separate questionnaires for all expected sub-consultants. Prime consultants must perform at least 40% of the basic design services. While affidavits and proof of insurance are not required during the initial submission, they must be provided prior to contract approval and must conform to Jefferson Parish Resolution No. 136353 or No. 141125. There is no specified set-aside status for this solicitation.
Jefferson Parish Government

POSTED

about 9 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Department of Veterans Affairs, through the Network Contract Office 15, is seeking a subcontractor for the development and execution of commissioning plans. The primary objective of this project is to ensure that HVAC, electrical, and plumbing systems are properly implemented, perform as intended, and remain in full compliance with established standards. The work will be performed in Kansas City, zip code 64128-2226. This opportunity is designated as a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 541330. Interested parties must submit their responses by October 28, 2025, at 7:00 PM. The solicitation was officially posted on October 22, 2025.

General Info

VA seeks SDVOSB subcontractor for HVAC, electrical, and plumbing commissioning in Kansas City.

NAICS

541330 - Engineering Services

Place of Performance

Kansas City, KS, 64128-2226

Set-Aside

SDVOSBC

Documents

This scope was carved out of 36C25526Q0039.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z2DA--589-26-472, Upgrade Pharmacy & Pharmacy Compounding Suite HVAC MC - (VA-26-00011104)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Construction Management and Field InspectionOpen now, due in 30 days
  • Corrosion Analysis and Nondestructive Testing (NDT)Open now, due in 30 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and implement commissioning plans for HVAC, electrical, and plumbing systems to ensure performance and compliance.

More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

NAICS: 811210
New
Federal
36C25527Q0048 - CT Contrast Injector Maintenance Services
Solicitation # 36C25527Q0048
Solicitation 36C25527Q0048 is a Firm-Fixed-Price contract set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 811210. The Department of Veterans Affairs Network Contracting Office 15 is seeking a contractor to provide full Original Equipment Manufacturer (OEM) maintenance services for Bayer Medrad Stellant FLEX CT contrast injector systems and Certegra workstation platform components. The services will support three devices located at the Marion VAMC and Evansville VA Health Care Center. The scope of work includes annual preventive maintenance, corrective repairs, software updates, system recertification, and cybersecurity hardening consistent with VA directives. The contractor must provide OEM-trained and certified personnel, approved tools, and loaner equipment when clinically necessary. The contract structure consists of a base period from December 7, 2026, to December 6, 2027, with four subsequent one-year option periods extending through December 6, 2031. Performance requirements include a 30-minute window for telephone triage and a four-hour on-site arrival time for urgent clinical outages. Award will be based on the most advantageous offer, considering price, technical capability, and past performance. Technical evaluation focuses on the contractor's experience with the specific Bayer systems, certification of personnel, and a detailed execution plan. Quotes must be submitted as three separate PDF documents covering solicitation and amendments, technical capability, and pricing by the deadline of November 20, 2026.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 541330
New
Federal
C1DA--589A5-25-150 REPLACE BOILERS FLS| MC FY27 NRM VISN Base DE
Solicitation # 36C25527R0017
The Department of Veterans Affairs, Network Contracting Office 15, is seeking engineering services for a fire protection and life safety (FLS) code review for the Replace Boilers project (Project 589A5-25-150) at the Colmery-O' Niel VA Medical Center in Topeka, Kansas. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms and is being conducted as a Firm Fixed Price contract under the Brooks Act and FAR Subpart 36. The scope involves an independent third-party review of design documents at the 90% submission stage to ensure compliance with VHA Directive 7712 and NFPA codes and standards. The anticipated period of performance for the design completion is approximately 180 calendar days. Qualified firms must submit a completed Standard Form 330 (SF330) by December 4, 2026. Selection is based on demonstrated competence and qualifications, specifically requiring a Fire Protection Engineer (FPE) with an ABET-accredited degree, a professional engineering license in fire protection engineering, and at least five years of experience in NFPA code interpretation, fire suppression and alarm system design, and healthcare facility design. Key deliverables include a detailed FLS Review Report in editable Excel and PDF formats, meeting minutes, and follow-up technical support. Contractors must be registered in SAM.gov, certified in the SBA database, and compliant with E-Verify and the Excluded Parties List System.
Engineering Services

POSTED

about 19 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541350
New
Federal
H112--Annual/Sem-i annual fire smoke inspections and auto door services l EKH
Solicitation # 36C25526Q0617
Solicitation 36C25526Q0617 is a Request for Quotation issued by the Department of Veterans Affairs, Network Contracting Office 15, for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) firm-fixed-price contract. The project requires comprehensive inspection, preventive maintenance, and repair services for approximately 124 manual fire and smoke door assemblies and 57 automatic door systems at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The scope of work includes semiannual or annual inspections, functional testing, and on-call repair services in compliance with NFPA 80, NFPA 101, and NFPA 105 standards. The contract is structured with five ordering periods, with an initial period estimated from November 1, 2026, through October 31, 2027, and a final performance deadline of April 30, 2032. This procurement is a total small business set-aside under NAICS 541350. Award will be based on the most advantageous offer, evaluating technical capability, past performance, veterans involvement, and price. Key technical requirements include the use of AAADM-certified personnel for automatic doors and strict adherence to emergency response times, requiring a technician on-site within four hours for life-safety emergencies. Amendment 0004 has extended the quote submission deadline to November 20, 2026, at 3:00 PM CST. Offerors must submit their quotes via email to the contracting officer and acknowledge all amendments using the SF30 form.
Building Inspection Services

POSTED

about 19 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238210
New
Federal
657A5-26-111, Triennial Electrical Testing
Solicitation # 36C25526R0186
The Department of Veterans Affairs, Network Contracting Office 15, is soliciting proposals for project 657A5-26-111 to perform triennial electrical testing at the Marion VA Medical Center in Marion, Illinois. The scope of work involves the maintenance, inspection, adjustment, and testing of the facility's electrical power distribution system, including approximately 325 electrical panels, 15 medium voltage transformers, 120 low voltage dry-type transformers, 220 fused/non-fused switches, 6 generators, and 25 automatic transfer switches. All testing must adhere to the latest National Electrical Code and the 2019 NETA Maintenance and Testing Specifications, specifically Chapter 7. The estimated contract value is between $500,000 and $1,000,000, with a performance period of 150 calendar days. This is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, evaluating five key factors: prime contractor past performance, prime contractor technical experience, electrical subcontractor experience, technical qualifications of key personnel, and the prime contractor's safety plan. Technical acceptability requires a satisfactory or better rating for past performance. The contractor must provide a certified Supervising Field Service Engineer accredited by NICET or NETA with at least five years of experience. Proposals must be submitted in three separate volumes covering technical requirements, pricing, and a bid bond.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in about 14 hours
View Details
NAICS: 562910
New
Federal
J091--Aboveground Fuel Tank Inspection Services - Kansas City VAMC
Solicitation # 36C25527Q0047
The Department of Veterans Affairs is soliciting a five-year Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for aboveground fuel tank inspection and maintenance services at the Kansas City VA Medical Center. This total SDVOSB set-aside procurement, under NAICS 562910, requires a qualified contractor to provide annual inspection, repair, certification, and fuel oil filtering for sixteen aboveground storage tanks with capacities of 55 gallons or greater. The period of performance runs from January 19, 2027, to January 18, 2032, with the requirement that annual inspections be completed every February. The scope of work includes STI SP001 certification for all tanks, fuel oil filtration to a specification of 4–10 ppm, and the annual application of stabilizer and biocide to maintain a minimum diesel cetane rating of 40. The contractor is responsible for all labor, materials, and the legal disposal of fuel, water, and filtration waste, including the provision of manifests and chain of custody documentation. All work must comply with API 653, EPA 40 CFR Part 112, NFPA 110 Chapter 8, and OSHA 29 CFR 1910 standards. Award will be based on a best-value comparative analysis of price, technical capability, and past performance, with a firm-fixed-price structure. Eligible offerors must provide a certified inspector with STI SP001 or API 653 certification and maintain general liability and pollution liability insurance. Proposals must be submitted by December 11, 2026, and must include a detailed price response and a non-price response covering technical eligibility, waste handling procedures, and socio-economic status.
Remediation Services

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
Federal
C222--589-27-108, Correct Electrical Deficiencies in Building 26 KCVA (ME) FY27 NRM VISN Base - AE (VA-27-00021035)
Solicitation # 36C25527Q0057_1
The Department of Veterans Affairs Network Contracting Office 15 is conducting a market survey for a Service-Disabled Veteran Owned Small Business (SDVOSB) to provide professional design services to correct electrical deficiencies in Building 26 at the Kansas City VA Medical Center. The scope of work involves addressing deficiencies in electrical closets, secondary distribution, uninterruptible power, and emergency power. The selected Architect/Engineer will be responsible for site visits, field investigations, and the preparation of narratives, studies, and design documents. Deliverables include design drawings, specifications, and Independent Government Cost Estimates (IGCE) submitted at 35 percent Schematic Design, 65 percent Design Development, 95 percent Construction Documents, and Final Bid Documents. All work must comply with Infection Control and Interim Life Safety Measures, and the period of performance for design work is 150 calendar days. This opportunity is a Sources Sought notice for market research purposes under NAICS code 541330, Engineering Services, with a size standard of 25.5 million dollars. Interested SDVOSB firms must be registered in SAM.gov and the SBA registry. To be considered, firms must submit a capability statement of no more than 10 pages by December 1, 2026, at 2:00 PM Central Time. This statement must include company contact information, Unique Entity ID, CVE certification, and evidence of comparable work performed within the last five years. In accordance with VAAR 852.219-75, the prime contractor must certify that no more than 50 percent of the government payment will be paid to firms that are not certified SDVOSBs.
Engineering Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS