Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Conchas Equipment Storage Structure

Awarded
W912PP26QA0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Contract for the Conchas Equipment Storage Structure, awarded as an 8(a) Sole Source Set-Aside under the Small Business Act, is assigned to a qualified small business to design and construct a 30 ft. x 60 ft. metal equipment building at Conchas Dam, New Mexico. The contractor is responsible for providing all labor, materials, equipment, and supervision, including a pre-engineered metal building package supported by Professional Engineer stamped drawings that verify structural integrity, fit, form, and function. The site preparation requires scarifying, compacting, and grading the subgrade to achieve a minimum of 95% of maximum dry density, with soil compaction testing mandated to be performed by an independent, qualified laboratory and documented in a certified report submitted to the Government Representative before any concrete placement. The contractor must also design and construct a reinforced concrete footer and pier foundation system capable of fully supporting the steel structure, ensuring compliance with the building manufacturer’s specifications and further requiring Professional Engineer certification of the foundation design. Structural columns must be securely anchored to the concrete piers in accordance with engineered standards. The contract is managed by the U.S. Army Corps of Engineers, Albuquerque District, with performance taking place at Conchas Dam, New Mexico, and all correspondence directed to Glenda D. Kohlieber. The solicitation was issued under number W912PP26QA0020 and was posted on July 10, 2026.

General Info

8(a) sole source contract for 30x60 ft metal building and engineered concrete foundation at Conchas Dam, NM.

Agency

Department Of Defense → W075 Endist AlbuquerqueView Agency

Contract Value

$243,181

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Conchas Dam, NM, 88416, USA

Set-Aside

8A

Awardee

COLT BUILDERS INCView Profile

Award Issued Date

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
Contacts1 person available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Organization / Agency
Department Of Defense → W075 Endist Albuquerque
View Agency Profile
Office AddressALBUQUERQUE, NM, 87109-3435, USA
Contacts
Glenda D. Kohlieber

Full Description

Show more

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.


  1. Contractor shall furnish all labor, materials, equipment, and supervision required for the purchase and construction of a 30 ft. x 60 ft. metal equipment structure located at Conchas Dam, New Mexico. The Pre-engineered Metal Building package shall have Professional Engineer stamped drawings certifying the building fit, form, and function. Subgrade and Compaction: The Contractor shall scarify, compact, and grade the subgrade in preparation for the concrete footer. Soil must be compacted to a minimum of 95% of its maximum dry density as determined by standard testing methods. As a condition precedent to the placement of any concrete, the Contractor shall conduct soil compaction testing through an independent, qualified testing laboratory. A certified report detailing all test locations, methods, and results shall be formally submitted to the Government Representative.Perimeter Footings with Piers: The Contractor shall be responsible for the complete design and construction of a reinforced concrete footer system adequate to support the steel equipment structure.Foundation and Anchoring: Structural columns shall be anchored to pier foundations on the concrete footer. The foundation design must meet the building manufacturer’s recommendations and be stamped by a Professional Engineer

Similar Contracts

NAICS: 236210
New
SLED
Biffy Facility ImprovementsThe contract entails the construction of a new non-combustible, explosion-proof structure designed to house critical equipment with full compliance to NFPA 820 and FDA sanitation standards. The structure will include interior and exterior lighting, ventilation, space heating for freeze protection, fire extinguishers, secure doors for equipment access, and integrated camera surveillance. A redundant pump system with a duplicate backup pump and biffy tank will be installed to ensure operational continuity during failures, alongside backflow prevention measures. Emergency safety equipment such as an eyewash station and emergency shower with tempered water will be provided to meet occupational safety requirements. The project also includes comprehensive upgrades to the facility’s electrical and mechanical infrastructure, channel drains, and wet well cleaning systems to enhance reliability and maintainability. All work must adhere to strict safety and sanitization protocols to support the facility’s operational integrity and regulatory compliance. The contract is managed by the Aviation Project Management Group under the Port of Seattle, with Jay Kim as the primary point of contact and Rishiraj Savita serving as the project manager. The NAICS code 236210 indicates this is a commercial building construction project, and it was posted on July 13, 2026, as a forecasted solicitation with no set-aside designation. The place of performance is not specified in the data, but the facility is located within the Port of Seattle’s jurisdiction. Contractors are expected to deliver full-system integration and infrastructure upgrade compliance without reliance on existing non-compliant components, ensuring fail-safe operation in high-risk environments. All systems must be designed for long-term durability, ease of cleaning, and immediate response during emergencies.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 236210
New
SLED
FY27 SL St. Charles Maintenance, Mechanics, & Truck Wash Building ProjectMoDOT is soliciting bids for the construction of a 170-foot wide by 55-foot deep by 18-foot 5-inch eave height pre-engineered metal building with insulation at 2360 Old Hwy 94 South, St. Charles, Missouri, under solicitation number MODOT 0000000337SL. The project, titled FY27 SL St. Charles Maintenance, Mechanics, & Truck Wash Building Project, falls under NAICS code 236210 and requires the contractor to furnish all labor, materials, equipment, and superintendence necessary for complete construction in accordance with the International Building Code and American Concrete Institute standards, with foundation design based on a 2,000 PSF load capacity. All bidders must attend a mandatory pre-bid meeting on June 24, 2026, at 10:00 AM, and those submitting hard copy bids must notify Logan Wilbers at logan.wilbers@modot.mo.gov five business days prior to the bid close date of July 14, 2026, at 2:00 PM Central Time. Bids must be submitted electronically via MissouriBUYS or as sealed hard copies via mail, UPS, or FedEx, with the exterior clearly labeled with the solicitation number and deadline. Each bid must include a bid guaranty equal to five percent of the bid amount in the form of a bid bond, certified check, cashier’s check, or bank money order payable to the Director of Revenue - Credit State Road Fund. The award will be made to the lowest and best responsible bidder based on price, vendor responsibility, and compliance with all mandatory specifications and Missouri statutes. Contract bonding is required at 100 percent of the contract value upon award, with insurance minimums including general liability coverage of at least $600,000, all policies issued by Missouri-licensed carriers. The contractor must comply with prevailing wage requirements under Chapter 290 RSMo, the Buy American Act, nondiscrimination provisions under Chapter 213 RSMo and Title VI and VII of the Civil Rights Act, and the Americans with Disabilities Act. Submission of signed exhibits including Annual Worker Eligibility Verification, Affidavit of Lawful Presence for sole proprietorships or partnerships, and Anti-Discrimination Against Israel Act Certification is mandatory. All materials must be delivered in manufacturer’s original packaging with full labeling, and
MODOT TRANSPORTATION

POSTED

5 days ago

DEADLINE

in about 18 hours
View Details