Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Florida was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Supply and Placement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the supply and placement of ready-mix concrete specifically for foundations, slabs, and various structural components, ensuring the materials meet necessary quality standards. It includes responsibilities such as conducting quality control testing and coordinating closely with structural contractors to ensure seamless integration and adherence to project requirements. This subcontract is associated with the NAICS code 327320, which pertains to ready-mix concrete manufacturing. Issued by the LE - Production - MPP agency in Florida, the contract was posted on May 22, 2026, with a response deadline set for June 23, 2026. While specific location details for the performance site are not provided, the contract supports critical structural elements across the project it serves. The procurement opportunity is accessible through the provided online portal, indicating a transparent solicitation process for interested contractors.

General Info

Supply and placement of ready-mix concrete for structural components with quality control and coordination.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-RFQ-050.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction Manager at Risk Services (CMAR) for the McIntosh Power Plant Unit 5 Administration Building Addition

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → LE - Production - MPP
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and place ready-mix concrete for foundations, slabs, and structural elements, including quality control testing and coordination with structural contractors.

More opportunities from Florida → LE - Production - MPP

Same awarding agency

NAICS: 811310
New
SLED
ANNUAL ROTATING EQUIPMENT INSPECTION, TESTING, REPAIR, RECONDITIONING AND STORAGE SERVICES
Solicitation # 2026-RFP-130
Solicitation 2026-RFP-130, issued by the City of Lakeland, seeks qualified contractors to provide annual inspection, testing, repair, reconditioning, and storage services for critical rotating equipment at the McIntosh and Larsen Power Plants. The scope of work covers a wide range of industrial machinery, including low- and medium-voltage AC and DC electric motors, as well as circulating water and condensate pumps. Required services include clean inspect test (CIT) procedures, troubleshooting, motor rewinding, machining, welding, and dynamic field balancing. The contractor is also responsible for the pickup, transportation, and secure indoor storage of equipment, ensuring strict preservation measures such as periodic shaft rotation and moisture control to prevent corrosion and damage. The selection process is based on a points-based criteria to identify the vendor most responsive to the city's needs. Proposers must submit their responses via the OpenGov portal by October 30, 2026, and provide essential documentation including a signed W-9, Sunbiz registration, a notarized indemnification agreement, and a human trafficking affidavit. Contractors must adhere to strict safety standards, including OSHA compliance and specific certification for crane operations and critical lifts. Furthermore, vendors are required to maintain insurance policies with AM Best ratings of no less than A and must undergo a safety audit covering EMR and employee training records to ensure compliance with city risk management standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 332911
SLED
McIntosh Unit 5 – 60-Inch Circulating Water Motor Operated Valve Replacement
Solicitation # 2026-ITB-124
The City of Lakeland has issued solicitation 2026-ITB-124 for the procurement and delivery of one complete replacement 60-inch Motor Operated Valve assembly for the Unit 5 Circulating Water System at the McIntosh Power Plant. The scope of work includes all engineering, design, manufacturing, testing, and transportation of the valve, gearbox, electric motor actuator, and associated mounting hardware. Additionally, the selected bidder must provide critical spare parts for long-term inventory. The replacement equipment must be new, unused, and fully compatible with the existing installation and circulating water service. Award will be granted to the lowest responsive and responsible bidder. Mandatory requirements for eligibility include attendance at a pre-bid meeting on October 8, 2026, and the submission of a notarized Hold Harmless Indemnification Agreement. Bidders must provide comprehensive technical submittals, including actuator torque calculations, factory testing procedures, and three references for comparable large-diameter valve assemblies supplied within the last five years. Compliance certifications are required for drug-free workplace standards, human trafficking laws, and public entity crime statutes. The bidder is responsible for the packaging and transportation of the assembly to the McIntosh Power Plant, ensuring protection against corrosion and damage. All equipment must undergo rigorous factory inspection and testing, including hydrostatic and functional tests, with certified reports provided prior to shipment. Final acceptance is subject to the City of Lakeland's inspection upon delivery to ensure the equipment is free from defects and conforms to all technical specifications. Bids must be submitted electronically via the OpenGov portal by the specified deadline.
Industrial Valve Manufacturing

POSTED

14 days ago

DEADLINE

in about 23 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS