Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Oregon was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Surface Preparation and Repair

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves subcontracting work focused on the inspection, cleaning, crack repair, spall patching, and surface profiling of existing concrete to ensure proper coating adhesion. This preparation includes methods such as shot blasting and grinding to create suitable conditions for applying protective coatings. The work is essential to maintain the integrity and durability of concrete surfaces by addressing defects and preparing them adequately for subsequent treatments. Issued by Clackamas County in Oregon, the contract does not specify a solicitation number or exact performance location but is classified under NAICS code 238110, which relates to concrete contractors. Interested parties must respond by June 29, 2026, and further details are accessible through the provided online bid platform. The project specifically supports the application of polyaspartic coatings at the North Clackamas Aquatic Park, highlighting its role in facility maintenance and longevity.

General Info

Subcontract for concrete surface prep, repair, and coating adhesion at North Clackamas Aquatic Park.

Documents

This scope was carved out of 2026-47.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026-47-Polyaspartic Coating Application – North Clackamas Aquatic Park Concrete Surfaces

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Clackamas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → Clackamas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Inspection, cleaning, crack repair, spall patching, and surface profiling (e.g., shot blasting, grinding) of existing concrete to ensure proper coating adhesion.

More opportunities from Oregon → Clackamas County

Same awarding agency

NAICS: 238990
New
SLED
RFQ 2026-85 Mill Park Playground Improvements
Solicitation # S-C01010-00018407
Clackamas County is soliciting quotes for the Mill Park Playground Improvements project, located at 6201 SE Overland St. in Milwaukie, Oregon. The scope of work involves the demolition of existing structures and the installation of District-provided playground equipment and synthetic turf surfacing. All equipment must be installed according to manufacturer specifications, and the synthetic surfacing must meet established fall-height safety standards. The project has an estimated value of 80,000 dollars, with a final completion deadline of June 30, 2027. The contract will be awarded to the lowest responsive and responsible quoter who substantially complies with all requirements and can demonstrate reliable performance. Preferred contractors should possess at least three years of experience in commercial playground demolition and installation. Because the project value exceeds 50,000 dollars, the selected contractor and all subcontractors must comply with Oregon prevailing wage rates and provide a public works bond. Additionally, performance and payment bonds are required for the final contract, and a bid bond is necessary if quotes exceed 100,000 dollars. Submission must be handled electronically via Bid Locker, with all pricing quoted as F.O.B. Destination. Applicants must provide a signed Quote Certification Form confirming compliance with Oregon tax laws, non-discrimination practices, and the absence of conflicts of interest. Evaluation may consider delivery timelines and past performance references. Payment terms are generally set at 30 days after receipt of invoice or delivery of goods.
All Other Specialty Trade Contractors

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
BID 2026-83 Cherryville-Welches Area Chip Seal Project
Solicitation # 2026-83
Clackamas County is soliciting bids for the Cherryville-Welches Area Chip Seal Project, a public improvement contract focused on resurfacing 25 miles of roadway across 54 rural roads. The scope of work involves placing approximately 330,000 square yards of chip seal using County-furnished aggregate, removing thermoplastic pavement markings, and managing temporary work zone traffic control. The project is governed by the 2024 Oregon Standard Specifications for Construction and requires the delivery of as-built drawings as a condition for final payment. On-site work is scheduled to begin no earlier than July 1, 2027, with substantial completion due by September 3, 2027, and final completion by December 31, 2027. The procurement process is managed via the Bid Locker portal, with a response deadline of December 9, 2026. Bidders must comply with Oregon prevailing wage rates and provide a First-Tier Subcontractor Disclosure Form. To be considered responsive, bidders must submit specific reporting forms within two hours of the closing date and demonstrate a good faith effort to engage historically underrepresented business subcontractors. The contract requires performance and payment bonds, as well as certification of compliance with Oregon Worker's Compensation Law. Jon Sparks is designated as the Owner's Authorized Representative, and the contract explicitly prohibits steel material price escalation or de-escalation.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS