Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

CONNER COMPLEX NEW LABORATORY FACILITY

Open
SOQ DOA 26 27 63State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Florida Department of Agriculture and Consumer Services is seeking a licensed general contractor to provide Construction Management (CM) at-risk services for Project 1175, the construction of a new approximately 156,000 square foot modernized laboratory facility at the Conner Complex in Tallahassee, Florida. The facility will support five scientific divisions, including Food Safety, Aquaculture, and Animal Industry, and will feature BSL-2 and BSL-3 capable laboratories, offices, and utility services. The selected contractor will be responsible for both the preconstruction design phase, including value engineering and the development of a Guaranteed Maximum Price (GMP), and the full construction phase. Qualified firms must submit a Statement of Qualifications by November 9, 2026, including a letter of interest, detailed financial information, a history of ten recent completed contracts, and evidence of Florida licensure. Evaluation is based on a preliminary ranking followed by interviews to determine the most highly qualified firm. The contract requires a five percent retainage on construction payments, monthly progress reporting, and compliance with Florida Department of Law Enforcement Level 1 background checks for workers. Performance and payment obligations are contingent upon annual appropriations by the Florida Legislature, and contractors must provide 100 percent performance and labor and material payment bonds for projects exceeding 100,000 dollars.

General Info

General contractor needed for a 156,000 square foot laboratory facility in Tallahassee, Florida.

Documents

5
PDF, High priority: read this first6 pages · past-performance
High
PDF, High priority: read this first64 pages · rfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this first64 pages · rfp
High
PDF, Low priorityother
Low

Read all 5 documents

Due in 3 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 3 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

Response deadline changed from Nov 9, 2026 to Nov 20, 2026. The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Department of Agriculture and Consumer Services
Contacts1 person available
OfficeN/A

Full Description

Show more
Project 1175: Conner Complex New Laboratory Facility - 3125 Conner Boulevard, Tallahassee, Florida 32311 PRELIMINARY EVALUATION RESULTS

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a firm fixed price contract. The scope of work involves a comprehensive interior modernization, including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new vanities and plumbing fixtures, and the installation of a low-profile raised flooring system with integrated electrical circuits for classrooms. Additionally, the project requires updating doors and life-safety components, repainting interior surfaces, installing new signage compliant with ADA and ABA standards, and upgrading HVAC systems by replacing variable air volume (VAV) systems using Automated Logic Corporation components. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Proposals are due by December 2, 2026, and will be evaluated based on price, past performance, and corporate relevant experience, all of which are of equal importance. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security protocols, including background checks and non-disclosure agreements for personnel. All work must comply with the FLETC Hazardous Waste Management Plan and applicable Georgia wage determinations.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. With an estimated project magnitude between $10 million and $25 million, the scope includes demolition, the replacement of deteriorated components, and the construction of a 400 square foot addition for forklift battery charging. The project is structured in two critical phases to ensure the facility remains operational and mission-capable, requiring the contractor to manage multiple mobilization and demobilization cycles. Phase 1 encompasses all initial design for both phases and general renovation work, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract requires strict adherence to NAVFAC, UFC, and IBC standards, as well as cybersecurity compliance under DFARS 252.204-7012 and CMMC Level 1. Key performance milestones include a base bid completion within 360 calendar days of award and an optional seismic upgrade completion within 1082 days. Award is based on price and MACC past performance, with invoicing processed through the Wide Area WorkFlow system. The contractor must provide a quality control system compliant with FAR 52.246-12 and employ an independent third-party Special Inspector of Record. Proposals must be submitted via the PIEE portal, with a final deadline of December 7, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This subcontracting opportunity, managed by Atterbury Job Corps Center and Adams & Associates Inc., is for the full replacement of the roof on Building #1963 LBJ Dorm in Edinburgh, Indiana. The project is necessitated by extensive storm and wind damage, including multiple leaks and a damaged roof ridge cap. The selected contractor must be licensed in the State of Indiana and adhere to EPA, OSHA, and national building codes, as well as the latest Davis Bacon Act wage rate decisions. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. The award will be based on Best Value rather than lowest price, with evaluation criteria weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion and a 90-day bid guarantee. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM; attendance is required for bid consideration. Insurance requirements include automobile liability coverage and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 25 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses all site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms, bathrooms, and common areas, as well as the restoration of walls and ceilings in mechanical rooms. The scope includes the installation of drywall, the temporary removal and re-installation of HVAC equipment, and the implementation of safety measures to protect occupied spaces from dust and debris. The contractor is responsible for providing all labor, materials, and supervision to return the affected areas to safe residential use, with a required minimum one-year workmanship warranty upon completion. Proposals must include detailed relevant experience, a comprehensive work plan covering project phasing and service interruptions, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act, adhering to wage determination OR20260100. Award requirements include providing payment and performance bonds for the full project value, as well as general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate, within ten days of the award. Additionally, a detailed project schedule and personnel resumes must be submitted within thirty days of the award.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 236220
New
SLED
Old Saybrook Public Works Garage Addition and Renovation
Solicitation # 39994
The Town of Old Saybrook is soliciting proposals for the Public Works Garage Addition and Renovation, a single-prime contract based on a stipulated sum. The project scope encompasses comprehensive site preparation, earthwork, field engineering, and landscaping, including the installation of temporary fencing and adherence to CTDOT 2024 standard specifications. The contractor is responsible for providing all labor, equipment, and materials, with a required substantial completion date of November 30, 2027. Key deliverables include site readiness, survey records, and material submittals, with a strong emphasis on strict packaging, labeling, and storage requirements for materials such as safety glazing and foam plastic. Proposals must be hand-delivered to the First Selectman’s Office by 3:00 P.M. on December 17, 2026, following a mandatory pre-bid meeting on December 1, 2026. Award evaluations will consider unit prices and bidder qualifications, including licensure, financial capability, and performance history. The contract requires 100 percent performance and payment bonds, compliance with the Connecticut Prevailing Wage Law, and adherence to the Immigration Reform and Control Act. Payment is processed via an Application for Payment reviewed by the Architect, who issues a Certificate for Payment to the Owner within ten days.
DAS Procurement

POSTED

about 18 hours ago

DEADLINE

in 29 days
View Details

More opportunities from Florida → Department of Agriculture and Consumer Services

Same awarding agency

NAICS: 541620
SLED
Sustainable Forestry Initiative Forest Management Standard
Solicitation # ITB FFS 26 27 71
The Florida Department of Agriculture and Consumer Services is seeking competitive bids for audit services to maintain the Florida Forest Service certification under the Sustainable Forestry Initiative (SFI) 2022 Forest Management Standard. The scope of work involves conducting one certification audit and four surveillance audits from 2027 through 2031 for 505,348 acres across the Blackwater River, Four Creeks, Jennings, John M. Bethea, and Tate’s Hell state forests. These audits must be performed by certification bodies accredited by the ANSI National Accreditation Board (ANAB) and adhere to SFI 2022 Standards and Rules as well as ISO/IEC 17021-1 and ISO/IEC TS 17021-2. The initial term of the contract is five years, with a possible renewal for an additional five years, not to exceed a total of ten years. The contract will be awarded to the responsive and responsible vendor offering the lowest Initial Term Total Price. Bidders must submit sealed responses by December 3, 2026, including a signed acknowledgement form and price sheet. Required certifications include E-Verify registration, lobbying and debarment disclosures, and proof of general liability, automobile, and worker's compensation insurance. Final reports and invoices are due by May 15th of each year, and payments are subject to annual legislative appropriation and a 1.0% transaction fee. Preference in the event of tie-breaking may be given to certified business enterprises, veteran-owned businesses, or Florida-based producers.
Environmental Consulting Services

POSTED

8 days ago

DEADLINE

in 15 days
View Details
NAICS: 115310
SLED
2026-2027 Hand-Planting Containerized Longleaf Pine Seedlings at Withlacoochee State Forest
Solicitation # ITB FFS 26 27 65
The Florida Department of Agriculture and Consumer Services, Florida Forest Service, is soliciting competitive bids for the hand-planting of approximately 527 acres of containerized longleaf pine seedlings across five separate areas within the Withlacoochee State Forest in Citrus and Hernando Counties. The project period is scheduled from December 15, 2026, to February 28, 2027. While the Florida Forest Service provides the seedlings, the contractor is responsible for all labor, equipment, tools, transportation, and supervision. Planting specifications vary by location, with the Citrus Tract requiring approximately 726 trees per acre and the Two-Mile Prairie and Croom Tracts requiring approximately 400 trees per acre. Strict quality standards apply to the planting process, including requirements that seedlings be kept moist, planted upright within 10 degrees of vertical, and positioned with the bud no more than one-half inch above the soil surface. An FFS representative must be on-site during all active operations, and the Forester-in-Charge will conduct inspections to ensure compliance. The contract will be awarded to the responsive and responsible vendor offering the lowest grand total price. Bids must be submitted in a sealed envelope by November 20, 2026, and must include required certifications regarding lobbying, debarment, and suspension.
Support Activities for Forestry

POSTED

12 days ago

DEADLINE

in 2 days
View Details
NAICS: 561710
SLED
Herbicide Application Services - Peace River State Forest
Solicitation # ITB FFS 26 27 55
The Florida Department of Agriculture and Consumer Services is soliciting competitive bids for herbicide application services to treat invasive exotic plants across approximately 107 acres within the Peace River State Forest in DeSoto County, Florida. The contractor is responsible for providing all labor, materials, equipment, and personal protective equipment to treat Category 1 non-native plants as listed on the FISC 2023 List of Invasive Plant Species. All work must be completed by June 10, 2027, and the on-site crew supervisor must hold a valid FDACS pesticide applicator license in the Natural Areas Weed Management category. The award will be granted to the responsive and responsible vendor offering the lowest Initial Term Grand Total Price, with preferences given to certified Business Enterprises, drug-free workplace programs, and specific foreign manufacturers. Contractors must adhere to strict operational requirements, including full compliance with herbicide label directions and the off-site disposal of all herbicide containers and debris. Mandatory insurance coverage includes a minimum of $500,000 in chemical drift control liability insurance per occurrence and workers' compensation insurance per Chapter 440, F.S. Bids must be submitted in sealed envelopes to the department in Tallahassee by December 1, 2026, and must include several required certifications and a signed price sheet. The contract includes a 1.0% MyFloridaMarketPlace transaction fee and requires the use of the E-Verify system for all employees. Payment is issued via state government warrant upon satisfactory completion of services.
Exterminating and Pest Control Services

POSTED

12 days ago

DEADLINE

in 13 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS