Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction and Repair of Substation A, JMTC, Rock Island, IL

Closed
W912QR25RA052Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 17 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Louisville District has issued a solicitation for the design and construction of a new Substation A at the Joint Manufacturing & Technology Center in Rock Island Arsenal, Illinois. The project involves replacing the existing 13.8kV substation, known as Switching Station A, with a larger facility capable of housing up to 27 breakers to support current and future electrical demands. The contract is a firm-fixed-price type, with an anticipated value between $10 million and $25 million, and a completion timeframe of 650 calendar days from the Notice to Proceed. The procurement process will utilize a Best Value Tradeoff evaluation, and the solicitation is open and competitive, with a pre-proposal conference encouraged for interested bidders. The project documentation includes multiple amendments updating proposal deadlines, site visit instructions, and solicitation details, with the latest posted on September 18, 2025. Offerors must be registered in the System for Award Management (SAM) to be eligible for award. The solicitation details, including the official posting and further instructions, are available on SAM.gov. The primary contact for inquiries is Contract Specialist Jacob S. Pridemore, reachable via email or phone. The project aims to enhance electrical infrastructure at the site through comprehensive design, analysis, and construction efforts, ensuring future capacity and reliability.

General Info

U.S. Army Corps offers $10-$25M fixed-price contract to replace 13.8kV substation, 650 days.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Rock Island, IL, USA

Set-Aside

NONE

Documents

13

RIA Substation A Modernization - Allen-Bradley SCADA J&A

PDF, High priority: read this firstjustification-and-authorization
High

W912QR25RA052-0002 - Amendment 0002

PDF, High priority: read this firstamendment
High

W912QR25RA052 Amendment 0001 - Substation A Construction

PDF, High priority: read this firstamendment
High

W912QR25RA052 Amendment 0003 - Substation A Construction

PDF, High priority: read this firstamendment
High

W912QR25RA052 Amendment 0004

PDF, High priority: read this firstamendment
High

W912QR25RA052 - JTMC Substation A Repair Specifications Vol 2

PDF, High priority: read this firstspecifications
High

W912QR25RA052 Plans - Electrical Specifications

PDF, High priority: read this firstspecifications
High

W912QR25RA052 Plans - Switching Station A

PDF, High priority: read this firstspecifications
High

W912QR25RA052 - Substation A Repair Rock Island Arsenal

PDF, High priority: read this firstifb
High

J&A for Schneider Electric Meters - Substation A Modernization (RIA)

PDF, Low priorityjustification-and-authorization
Low

Rock Island Arsenal Visitor Access Request Form June 2022

PDF, Low priority2 pages · other
Low

Simplex 4006 Fire Alarm Panel J&A - Substation A Modernization

PDF, Low priorityjustification-and-authorization
Low

W912QR25RA052 Site Visit Sign-in Sheet

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more

***AMENDMENT 0004: Refer to the attached amendment documentation related to updated proposal due date.


***AMENDMENT 0003: Refer to the attached amendment documentation related to changes to the solicitation.


***AMENDMENT 0002: Refer to the attached amendment documentation related to updated proposal due date and wage rate determination.


***AMENDMENT 0001: Refer to the attached amendment documentation related to updated site visit instruction and incorporation of three Justification and Approvals. 


***Site visit sign-in sheet dated 21 August 2025 posted to attachments section. 


DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District has issued Request for Proposal (RFP) Solicitation W912QR-25-R-A052 for the Design-Bid-Build construction and repairs of a Substation A at Joint Manufacturing & Technology Center (JMTC), Rock Island Arsenal (RIA), Illinois. The project includes the replacement of the primary 13.8kV substation at Rock Island Arsenal referred to as Switching Station A and/or Substation A. The package will include drawings, specifications, design analysis, calculations, and construction schedules. The project consists of an existing switchgear building, Switching Station A, that has 14 total breakers modular construction, with a concrete vault under the switchgear room. The new Switching Station A building will be larger and will have capacity for 27 breakers to accommodate the existing electrical needs with spare breakers and additional growth for the future.


The Contract Duration is at six hundred and fifty (650) calendar days from administrative Notice to Proceed.

TYPE OF CONTRACT AND NAICS: This RFP is for one (1) Firm-Fixed-Price (FFP) contract.  The North American Industrial Classification System Code (NAICS) for this effort is 237130 - Power and Communication Line and Related Structures Construction.



TYPE OF SET-ASIDE: This acquisition will be a Full & Open competitive procurement. 



SELECTION PROCESS: The proposals will be evaluated using a Best Value Tradeoff Source Selection process.



CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $10,000,000 and $25,000,000 in accordance with DFARS 236.204.


PRE-PROPOSAL CONFERENCE:  A pre-proposal conference will be held, and attendance is encouraged.  Refer to FAR 52.236-27 Alt I and file titled "Vistor_Access_Form_June2022."



SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist, Jacob S. Pridemore, at contact@example.gov or +1 (555) 000-0000

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS