Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CONSTRUCTION MANAGEMENT& CONSTRUCTION INSPECTION SERVICES FOR RUDELOFF ROAD FROM HUBER ROAD TO SH123

Closed
State & Local
Submission Closed
Solicitation #
AF-2026-047

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is seeking engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses seven primary tasks, including project initiation, data gathering, a 30 percent design level basis of design report, detailed design (60, 90, and 100 percent), and engineering support during the procurement and bid phases for injection and monitoring wells. The project is set as a Small Business set-aside, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Performance is located in California, with key construction milestones targeted for May 2028 and July 2029. The contract is a not-to-exceed agreement with a warranty period of at least one year following acceptance. Selection is based on a multi-stage process involving team qualifications, experience, and potential interviews, with final approval required by the IEUA Board of Directors. Deliverables must adhere to specific technical standards, including AutoCAD for designs, Bluebeam for reviews, and Class 1 AACE standards for cost estimates. The project must comply with various federal and state funding requirements, including the Davis-Bacon Act, the Endangered Species Act, and Buy America preferences for infrastructure materials. Invoicing is handled electronically via ACH on a monthly basis.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work includes project initiation, utility research, field investigations, and the development of a basis of design across multiple disciplines. The selected consultant will be responsible for creating detailed design drawings and reports at 30, 60, 90, and final design levels, as well as providing engineering support during the bid award process for the construction package. Key deliverables include construction schedules and Opinion of Probable Construction Cost estimates. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. The contract is structured on a time and material basis with a not-to-exceed total amount, featuring a 50,000 dollar allowance for mitigation measures. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on project success factors, communication, regulatory requirements, and implementation plans. The project must adhere to specific engineering design guidelines and federal and state grant funding requirements, including compliance with the Davis-Bacon Act and Build America Buy America standards.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The Sacramento County Sheriff's Office (SSO) is seeking a qualified consulting firm to evaluate the existing walk-in evidence freezer room at the Property Warehouse. The primary objective is to assess current conditions, identify deficiencies, and provide a comprehensive report recommending whether to repair or replace the equipment and related systems. The project is divided into two phases: Phase 1 involves a thorough assessment including photographs, measurements, and an improvement plan, while an optional Phase 2 covers the production of bid-ready construction documents. All work must be led by a California-licensed engineer, and any design documents must be signed and sealed by one. This is a consulting services contract only; the selected firm will not be responsible for the actual furnishing or installation of the freezer. The project must adhere to California Penal Code Section 1417.5, California Department of Justice standards, IAPE guidelines, and NIST recommendations. Funding is provided by the County, though equipment may be purchased via the Edward Byrne Memorial Justice Assistance Grant (JAG), which subjects equipment purchases to the Buy American Act and NEPA rules. Proposals must be submitted via the SacCountyE bids portal by December 18, 2026. There is no specific set-aside status for this solicitation. Payment for the assessment and design phases is contingent upon County acceptance of the completed deliverables.
DGS: CAPSD - Procurement

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Solicitation # 20261127006
The City of Emeryville is seeking professional design services for the Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project. The scope of work involves the full replacement of the gravity sewer main from MH 21.100.27 to MH 21.000.00, with a focus on mitigating differential settlement caused by bay fill soil and increasing pipe slope by lowering the final invert elevation at MH 21.000. The selected engineering team will be responsible for delivering Plans, Specifications, and Estimates (PS&E), developing public outreach plans, and coordinating connections with the EBMUD North Interceptor pipeline, as well as collaborating with Caltrans and other agencies. Proposals are due by January 6, 2027, and will be evaluated based on technical experience with sewer main design in soft soil conditions, project approach, experience coordinating with EBMUD, and methods for maintaining budget and schedule. The selection process may include shortlisting and interviews before negotiating a not-to-exceed price contract. The project requires adherence to the City's standard professional services contract, including insurance requirements and compliance with Emeryville Municipal Code regarding minimum wage and living wage ordinances. Design submittals are required at 30%, 60%, 90%, and final design phases. There is no set-aside status for this solicitation.
City of Emeryville

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Seguin is soliciting statements of qualifications for professional Construction Management and Construction Inspection (CMCI) services for the Rudeloff Road project, extending from Huber Road to SH123. The project involves widening 1.62 miles of roadway to four lanes, including the installation of drainage, bicycle and pedestrian facilities, and approximately 7,000 linear feet of water main, with an estimated construction cost of 19.3 million dollars. The selected firm must possess at least five years of relevant experience and demonstrate extensive familiarity with Texas Department of Transportation (TxDOT) Local Government Project Procedures (LGPP) for federally funded projects. Responsibilities include performing a high-level peer review of final construction documents, providing Engineer Led Inspection Teams (ELIT) for quality assurance, managing contractor activities, and overseeing project close-out. The contract requires strict adherence to federal and state regulations, including the Davis-Bacon Act for prevailing wages, Buy America certifications, and DBE/HUB compliance. Evaluation of respondents is based on a 100-point scale focusing on firm and staff qualifications, past experience with locally let projects, and the ability to meet the project schedule. The construction phase is expected to be completed within 480 consecutive calendar days. Selected consultants will be compensated on an hourly basis, with payments issued 30 days after the receipt of accurate invoices. Proposals are due by September 22, 2026, and must include specific certifications, such as the Conflict of Interest Questionnaire and evidence of professional liability insurance.

General Info

City of Seguin seeks CMCI services for Rudeloff Road project by September 22, 2026.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstrfq
High
PDF

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

79 mandatory

80 requirements in 9 areas

  • Compliance15 · 15 must
    034

    Proposal Bond Requirement

  • Submission12 · 11 must
    001

    Proposal Validity Period

  • Evaluation11 · 11 must
    023

    Proposal Scoring and Selection Process

  • 77 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 80 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 59 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Seguin
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City of Seguin
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
The City of Seguin (City) is soliciting statements of qualifications (SOQ) from qualified firms for professional services who can adequately demonstrate they have five (5) years of relevant experience, the resources, and qualifications to fulfill the role of Construction Manager/Construction Inspector (CM/CI) for our Rudeloff Road Project – Huber Road to SH123, an Alamo Area MPO STBG funded project. All consultants submitting a response to this RFQ and seeking to provide services for the City of Seguin should be extremely familiar with Local Government Project Procedures (LGPP or “Local Let”) projects receiving federal funding through the Texas Department of Transportation (TxDOT). The selected firm will be responsible for providing comprehensive construction management services for all phases of construction, quality control and quality assurance, and project close-out through the LGPP TxDOT process. The city will select one respondent to provide these services for the Rudeloff Road Extension Project. The respondent should select a team of professionals capable of providing the required services in an efficient manner in the best interest of the City of Seguin that are familiar with the City’s processes and procedures and will provide successful, on-time, and on-budget project delivery. Information on all proposed subconsultants should be included in the response. As used throughout this document, “ensure” means to make certain that something has happened or will happen, and includes an obligation to deploy the appropriate level of engineering or other technical expertise, consistent with the complexity, cost, and level of risk associated with a task. Ensure does not require or guarantee the completion of any task assigned to a separate entity under any other agreement. The work to be performed by the Engineer shall consist of managing the construction contract, which includes monitoring during and verifying after, that construction of specific operations are in accordance with the plans, and providing Engineer Led Inspection Teams (ELIT) to perform various CEI services, that include the services described in Exhibit G CMCI Consultant Contract Scope of Work.

More opportunities from Texas → City of Seguin

Same awarding agency

NAICS: 811310
SLED
ELEVATOR PREVENTATIVE MAINTENANCE & EMERGENCY REPAIR SERVICES
Solicitation # AF-2027-08
The City of Seguin is seeking a primary contractor to provide comprehensive elevator preventative maintenance and emergency repair services for all city-owned facilities. The initial contract term runs from December 1, 2026, through September 30, 2027, with five optional one-year renewal periods. The scope of work includes a minimum of 12 scheduled monthly maintenance visits per unit per year, 24/7/365 emergency response for outages and entrapments, and the coordination of annual load testing and safety inspections. All services must comply with ASME A17.1/CSA B44, ASME A17.3, ASME QEI-1, NFPA 70, the Texas Elevator Safety Act, and 2010 ADA Standards. Award decisions will be based on best value, utilizing a weighted evaluation criteria that prioritizes cost and price proposals (30%), firm qualifications and experience (20%), technician certifications and staffing (15%), and emergency response capability (15%), with additional weight given to maintenance methodology (10%), safety records (5%), and public-sector references (5%). Bidders must provide a cost proposal including base monthly PM rates, incremental inspection fees, standard and emergency hourly labor rates, and a parts markup percentage. Required documentation for submission includes a Conflict of Interest Questionnaire, Form 1295, and an insurance certificate covering workers' compensation, general liability, automobile liability, and errors and omissions. There is no set-aside status for this solicitation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

20 days ago

DEADLINE

in 4 days
View Details
NAICS: 325180
SLED
Annual Contract for Chemical Sulfur Dioxide
Solicitation # LF-2027-09
The City of Seguin is soliciting bids for an annual contract for the purchase and delivery of Sulfur Dioxide for water and wastewater treatment. The contract is scheduled to begin in January 2027 for an initial one-year term, with options for three additional one-year renewals. The estimated annual quantity is 35 one-ton cylinders, with prices quoted as F.O.B. Destination, freight included. Bids must be submitted electronically via the Beacon Bid system by December 8, 2026, at 3:00 P.M. The City reserves the right to award the contract based on the best value, considering factors such as purchase price, bidder reputation, quality of goods, and the bidder's past relationship with the municipality. Contractors are responsible for ensuring all chemicals are properly labeled and packed in accordance with Texas, DOT, and OSHA regulations. Deliveries must be accompanied by a packing list and a Material Safety Data Sheet (MSDS). The City requires bidders to provide a specific delivery timeline, as vague terms may lead to disqualification. Required documentation includes a Conflict of Interest Questionnaire, a Certificate of Authority to Submit Proposal, and an Addendum Form certifying compliance with Texas laws regarding boycotts of Israel, energy companies, and firearm entities. Payments are processed within 30 days of receiving an itemized invoice that references a City of Seguin Purchase Order number.
Other Basic Inorganic Chemical Manufacturing

POSTED

24 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS