Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Controls and Building Automation System (BAS) Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Board Of(university System of Georgia) RegentsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-47200-RFQ-2027-000000150.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GSOU J-474-DP Campuswide HVAC Renewal, Swainsboro Campus

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
ContactsNo contacts available
OfficeN/A
Organization / Agency
Board Of(university System of Georgia) Regents
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design integration of HVAC with building automation systems for centralized control, monitoring, and energy optimization.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District, is a professional services engagement focused on the design and construction of a new municipal groundwater production well and the abandonment of the existing Corydon Well in California. The project is divided into two primary phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management for the drilling and abandonment process; Phase 2 involves architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for the equipping, testing, and commissioning of the new well. The total estimated project cost is 2,260,788 dollars, with a significant portion allocated to contractual and construction costs. The project is partially funded by the Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, requiring strict adherence to federal grant requirements, including 2 CFR Part 200 procurement standards, the Build America, Buy America Act, and specific reporting cycles. Qualified firms, particularly certified DBE and small businesses, are encouraged to apply. Requirements for the selected consultant include providing performance and payment bonds for 100 percent of the contract price, maintaining comprehensive general and automobile liability insurance, and complying with California prevailing wage laws and Cal/OSHA standards. Proposals must be submitted via the PlanetBids Vendor Portal, and the award will be based on the most advantageous proposal, considering qualifications and price.
GEI Consultants, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

NAICS: 238210
New
SLED
Minority Business Enterprise (MBE) Participation and SubcontractingThe contract seeks to engage certified Minority Business Enterprises (MBEs) in electrical, civil, or supply roles to fulfill the University System of Georgia Board of Regents' policy on diversity and inclusion while ensuring eligibility for state tax credits under O.C.G.A. §48-7-38. Participation is mandatory for contractors to meet set goals, and MBEs must be properly certified to qualify for inclusion in the project workforce or supply chain. This subcontract opportunity is tied to a specific project under NAICS code 238210, indicating an emphasis on electrical contracting services, though civil and supply roles are also included to broaden MBE involvement. The solicitation is open for responses until September 11, 2026, and is posted under the Georgia state procurement system with an active digital portal for access and submissions. The engagement is not a direct government procurement but rather a subcontracting requirement imposed by the agency, meaning prime contractors must demonstrate how they will integrate certified MBEs into their project execution plan. Failure to meet MBE participation targets may jeopardize tax credit eligibility and could result in contract noncompliance penalties. There is no specified location for performance, but the oversight and compliance responsibilities fall under the Georgia state agency, requiring all participants to align with state regulations and reporting standards. This contract is designed to drive economic equity by channeling project opportunities to historically underrepresented business owners within Georgia’s construction and supply sectors.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541611
New
SLED
Project Documentation and Compliance ManagementThe contract entitled Project Documentation and Compliance Management requires the successful vendor to oversee the complete administration of bonding, insurance compliance, and subcontractor documentation, with strict adherence to A.M. Best-rated insurance standards and public works regulations. This includes ensuring all parties meet the required financial and legal thresholds for surety bonds, liability coverage, and worker protections dictated by state and federal public construction mandates. The vendor must maintain accurate, auditable records and coordinate with subcontractors to verify their compliance before work commences and throughout project execution. Managed under the Board of Regents of the University System of Georgia, this subcontract is tied to infrastructure or construction initiatives within the state and demands a thorough understanding of Georgia’s public works laws and insurance requirements. The solicitation was posted on August 7, 2026, with responses due by September 11, 2026, and is classified under NAICS code 541611 for management consulting services, indicating the role focuses on administrative oversight rather than direct construction. The place of performance and exact project location are not specified, suggesting the scope may span multiple sites under the university system’s jurisdiction, and all work must align with the state’s procurement and contracting protocols.
Administrative Management and General Management Consulting Services

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 423610
New
SLED
Supply of Pad-Mounted Transformers and Electrical EquipmentThe contract entails the supply of six 25kV pad-mounted transformers labeled ST-1 through ST-6, along with all necessary associated electrical components such as switches, terminations, and grounding kits required for full operational integration. These components must meet specified technical and safety standards to ensure reliable performance in utility or campus electrical distribution networks. The equipment is intended for delivery and installation at an unspecified location under the jurisdiction of the Board of Regents of the University System of Georgia, with performance expected to align with the functional and operational demands of the Georgia public university infrastructure. The solicitation, issued under the NAICS code 423610 for Electric and Other Utilities Distribution, is structured as a subcontract and was posted on August 7, 2026, with a firm response deadline of September 11, 2026, at 7:00 PM. While no set-aside classification or point of contact is provided, the procurement is managed through the Georgia state procurement system via the designated UI link. Suppliers must ensure compliance with all technical specifications, delivery timelines, and installation readiness requirements without detailed performance location information provided, implying that final site details may be coordinated directly after award.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

5 days ago

DEADLINE

in about 1 month
View Details