The Department of the Treasury is seeking sources for a design-build project involving the demolition and replacement of two Evapco and one BAC cooling tower. The scope of work includes updating associated structural steel platforms, roofing, mechanical and electrical components, pumps, motors, piping, and chemical feed systems. Additionally, the project requires the installation of fire and smoke detector systems and full SCADA integration and control systems. All work must comply with IPC, ASHRAE, ASME, and National Electrical Code standards. Qualified HVAC and mechanical contractors with experience in large-scale condenser water systems must provide equipment submittals, cut sheets, and a demolition and disposal report. Final as-built drawings and schematics must be accepted prior to the start of construction. Interested parties should submit their business size, socio-economic category, and UEI to the primary point of contact by August 20, 2026.
General Info
Agency
NAICS
Place of Performance
DC, 20024, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Seeking Sources ONLY for a design build project. Demolition and replacement of two existing Evapco cooling towers (Model: AT 424-936), replacement of one BAC cooling tower (model number is VXT-800CR from Baltimore air coil company, Serial number is 84-5979) associated structural steel platform, roofing replacement, associated structural components, associated mechanical components, associated electrical components, pump, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems. Contractor should ensure that the project adheres to all guidelines and code, including but not limited to, the International Plumbing Code (IPC), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) standard and guideline, the American Society of Mechanical Engineers (ASME) codes and standards and the National Electrical Code, etc. The contractor shall provide As-built drawings and updated schematics for this project. The contractor shall provide an integration and SCADA commissioning, demolition, and disposal report. The contractor should provide equipment, structural, and all necessary submittals and cut sheets for all replacement components. The work shall be performed by a qualified HVAC/mechanical contractor with demonstrated experience in large-scale condenser water system installations, including the integration of cooling towers with SCADA systems. The As-built drawing needs to be accepted before the start of construction.
Please provide responses of interest to Laqulla.Williams@bep.gov. Include business size, socio-economic category (if applicable) and UEI.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Treasury → Office Of The Chief Procurement Officer
Same awarding agency