Copart 26 Acre Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Copart, Inc. has applied to the City of Adelanto for a Development Plan and Conditional Use Permit to establish an approximately 26.73-acre overflow vehicle storage facility. Located at the southeast corner of Koala Road and Holly Road on five parcels in San Bernardino County, the project is designed to provide temporary storage for totaled vehicles to support existing Copart operations. The scope of work includes grading, the installation of a rock ballast parking surface, drainage improvements, and the construction of an eight-foot-tall tube steel perimeter fence for security and visual buffering. Additionally, the project will feature drought-tolerant landscaping along public frontages and a single gated commercial driveway on Koala Road, with internal aisles designed for medium-duty tow trucks and emergency vehicles. No permanent buildings or structures are proposed. The facility is scheduled to operate Monday through Friday from 8:00 a.m. to 5:00 p.m. Construction is anticipated to begin in May 2026 and conclude by May 2027. Environmental reviews, including an Initial Study and Mitigated Negative Declaration, have been conducted to address potential impacts on biological resources, cultural resources, geology, soils, and noise levels. These reviews include specific mitigation measures such as inadvertent finds procedures and specialized surveys to ensure compliance with City of Adelanto and state environmental standards.

General Info

Copart seeks permit for a 26.73-acre overflow vehicle storage facility in Adelanto.

Agency

California → City of Adelanto

Place of Performance

Koala Road and Holly Road, Adelanto, CA, 92301

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Adelanto
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Adelanto
Office AddressN/A
Contacts
Frank CoyleDirector of Planning
Ben StevensProject Manager
Nyeka AllenDevelopment Services Coordinator

Interested Companies (1)

CASC Engineering and ConsultingColton, CA

Full Description

Show more
Copart, Inc. has submitted an application to the City of Adelanto for a Development Plan and Conditional Use Permit to develop an approximately 26.73-acre overflow vehicle storage facility on five parcels (APNs 3128-331-01, -02, -04, -07, and -08) located at the southeast corner of Koala Road and Holly Road. The Project will provide temporary storage for totaled vehicles associated with the existing Copart Adelanto operation. Proposed improvements include grading, installation of a rock ballast parking surface, perimeter security fencing, drainage improvements, landscaping, and one gated commercial access driveway from Koala Road. No buildings or permanent structures are proposed. The facility will operate Monday through Friday between 8:00 a.m. and 5:00 p.m.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS