Control Gorge Camp Bank Stabilization Biowall (Notification of Lake or Streambed Alteration, No. EPIMS-INY-60537-R6)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-INY-60537-R6 with the Los Angeles Department of Water and Power. This agreement, executed under Section 1602 of the Fish and Game Code, authorizes the construction of a bioengineered retaining wall approximately 120 feet long and 16 feet wide to stabilize and reconstruct a section of the Owens Riverbank. The project will utilize a combination of construction materials and native, locally sourced elements, including Bishop tuff, soil, and coyote willow pole cuttings, supported by granular filters and dead man anchors. Following the completion of the bio-retaining wall, the road located atop the reconstructed bank will be repaired.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
