This Solicitation opportunity from Department Of Defense was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cottonwood Pile Dike Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Cottonwood Pile Dike Repairs project, identified by solicitation number W9127N26BA005, is a fixed-price, Total Small Business Set-Aside contract under NAICS code 237990 with a size standard of $45.0 million, aimed at repairing compromised sections of pile dikes along the Lower Columbia River between River Mile 68 and River Mile 72 in Cowlitz County, Washington. The work involves enrockment repair and enhancement at ten pile dikes and the construction of offset pile dikes and shore connections at five locations to mitigate shoreline erosion, with all rock placement designed to avoid disturbance of existing piles. Debris within the rock placement zones must be removed based on pre-construction high-resolution bathymetric surveys and transported to an approved upland facility. Mobilization and demobilization, timber pile installation, rock placement, concrete curb and gutter installation, asphalt paving, storm drain and utility relocation, site grading, guardrail and signage installation, erosion control measures, and inspection and testing services are included in the scope, with a total estimated contract value of $14,060,000. The project is constrained by an annual in-water work window from November 1 to February 28 due to environmental regulations, with performance to commence no earlier than November 1, 2026, and complete by February 28, 2028. Award is contingent upon completion of the NEPA process and a signed Finding of No Significant Impact, expected by the end of May 2026, and will be made to the lowest-priced, responsible, and responsive offeror. The solicitation is administered by the USACE Portland District, with email submissions only accepted by Chris Burroughs and Justin Figueredo at their designated addresses, and all responses must be in PDF format with bookmarks and not exceed 20 MB per email unless split. Bids must include a valid UEI and CAGE code as registered in SAM.gov, and offerors must certify their small business status and compliance with socioeconomic representations. Special requirements include comprehensive insurance coverage—workers’ compensation as required by law, and general and automobile liability insurance with minimum limits of $1 million per person and per occurrence—with policies requiring a non-cancellation endorsement. Contractors must submit a Contractor Quality Control Plan, adhere to ASTM standards for testing, and ensure laboratory work is performed by Corps-approved facilities. The contract includes standard FAR clauses such as
General Info
Agency
NAICS
Place of Performance
WA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
*** 17 June 2026 - W9127N26BA0050003 Cottonwood Pile Dike Repairs***
Upon request, the full bid abstract has been attached to this posting.
*** 30 April 2026 - Amendment W9127N26BA0050003 Cottonwood Pile Dike Repairs***
The purpose of this amendment is to incorporate by full text RFO Clause 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) (DEVIATION APR 2026) into Specification Section 00 70 00 Conditions of the Contract.
*** 21 April 2026 - Amendment W9127N26BA0050002 Cottonwood Pile Dike Repairs***
This amendment effects changes to the Solicitation Plan Set, Drawing C-601 TIMBER PILE AND STEEL MARKER PILE SCHEDULE, Table STEEL MARKER PILE SCHEDULE.
The Solicitation Period is extended by 14 calendar days which changes the Solicitation Closing Date from May 01, 2026, to May 15, 2026. Attached "Solicitation Amendment W9127N26BA0050002 SF 30" provides a summary of changes incorporated by this amendment and attachment "W9127N26BA0050002 Plan Sheet - C-601-TIMBER PILE AND STEEL MARKER PILE SCHEDULE" provides an updated plan containing the changed steel pipe pile data.
*** 21 April 2026 - Amendment W9127N26BA0050001 Cottonwood Pile Dike Repairs***
This amendment effects changes to Specification Section 01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.2.3 Nesting Birds, Subparagraph b.(4)(d). Attachment "Solicitation Amendment W9127N26BA0050001 SF 30" provides a summary of the changes incorporated by this amendment and attachment "AMD0001_technicalsection" provides a revised copy of the entire specification section with the changes incorporated.
W9127N26BA005 Cottonwood Pile Dike Repairs
The project is located between River Mile 68 and River Mile 72 on the Lower Columbia River in Cowlitz County, Washington. The project allows for focused, cost-effective repairs to select sections of individual structures. Repair areas are limited to sections of pile dikes that have experienced loss of all, or the majority of, visible piles to the extent that hydraulic function is assumed to be severely compromised.
The work includes enrockment repair/enhancement areas at ten pile dikes and a shore connection with an offset pile dike at five of the pile dikes. The offset pile dikes and shore connection are in areas where there is visual evidence of shoreline erosion and a lack of sufficient remnant shore connection and the potential for additional erosion exists.
The enrockment repair/enhancement sections in repair areas are offset a sufficient distance from the existing pile line to allow for placement of stone without removal of any pile. All debris within the rock placement areas that would interfere with stone placement shall be removed prior to stone placement. Debris will be removed from the site and disposed of at an approved upland facility. Debris removal requirements will be based on pre-construction high resolution multi-beam bathymetric survey data.
This solicitation is an Invitation for Bid (IFB). Award will be made to the lowest priced, responsible, and responsive offeror. This acquisition will result in a single fixed-price contract. The National Environmental Policy Act (NEPA) process, including the signed Finding of No Significant Impact (FONSI), is anticipated to be completed by the end of May 2026; award will not be made until the NEPA process has completed.
This is a Total Small Business Set-Aside. The North American Industrial Classification Code (NAICS) for this requirement is 237990 – “Other Heavy and Civil Engineering Construction”. The related size standard is $45.0 million. The PSC is Z2QA Repair or Alteration of Restoration of Real Property (Public or Private).
The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Chris Burroughs at christopher.d.burroughs@usace.army.mil, and the alternate POC, Justin Figueredo at justin.f.figueredo@usace.army.mil. E-mail is the only method for receiving bids to this Solicitation.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.
More opportunities from Department Of Defense → W071 Endist Portland
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS