Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on January 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Crane and Hoist Inspection, Maintenance & Repair

Closed
252666MRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Federal
129 CEF - AVB Maintenance Services
Solicitation # PANNGB-27-P-0000042953
The 129th Rescue Wing at Moffett ANGB, California, is conducting market research via a Sources Sought notice to identify potential providers for the maintenance and inspection of two Delta Scientific DSC501 wedge barriers and one hydraulic pumping unit. The required services include monthly, quarterly, and annual preventative maintenance and a mandatory annual inspection to ensure the systems effectively stop threat vehicles while protecting drivers. The scope of work encompasses a wide range of technical tasks, including utility and site verification, excavation, earthwork, the construction of a concrete display pad, aircraft support and anchoring features, static grounding, lightning protection, solar-powered perimeter lighting, and stormwater drainage improvements. This requirement is categorized under NAICS code 811310 for Commercial and Industrial Machinery and Equipment Repair and Maintenance, with a small business size standard of 12.5 million dollars. The government is seeking responses from interested prime contractors, specifically small businesses, to determine if there is adequate competition to justify a set-aside. Interested vendors must submit a written notice of intent not exceeding five pages, including a list of similar projects from the past five years, an outline of resources and key personnel, and proof of socioeconomic status. Technical personnel must possess at least three years of experience in maintaining military safety barrier control systems, and the lead technician must have documented experience in troubleshooting and repairing traffic control systems. All work will be performed at the 129 RQW parking apron at Moffett Federal Airfield and the contractor's place of business, with invoicing handled through the Wide Area Workflow system.
W7MX Uspfo Activity Caang 129

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 811310
New
International
MAINTENANCE DES EXTINCTEURS (VERIFICATION ET RECHARGE) DE TOUS LES BUREAUX POUR LE COMPTE DU HCR AU TCHAD Yaneko Foka Passiri BERAL - [email hidden], Téléphone: +235 66201764
Solicitation # HCR/NDJ/ITB/006/2026
UNHCR is soliciting bids for a framework agreement to provide preventive and corrective maintenance for fire extinguishers across all its offices in Chad. The contract covers a firm period of 24 months with an optional 12-month extension. The scope of work includes annual regulatory verifications, recharging, and repairs for a wide variety of extinguisher types, including CO2, ABC, and water-additive units. All maintenance must be performed on-site, and the provider is required to use a workshop equipped with pressure control and recharging systems. Key deliverables include the application of visible tracking labels on each unit and the submission of electronic reports within five business days of intervention. The contract will be awarded to a single provider based on the lowest evaluated total cost among technically compliant offers. Technical compliance is determined by a Pass/Fail evaluation requiring valid accreditation, at least two relevant references, qualified personnel, and a detailed methodology for the eleven locations. The provider must commit to a maximum 72-hour response time for urgent corrective interventions. Payments will be processed in FCFA via bank transfer within 30 days of receipt of a payment request, following UNHCR's confirmation of the completed works. All spare parts used must strictly adhere to manufacturer specifications and fire safety standards.
UNHCR

POSTED

1 day ago

DEADLINE

N/A

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstifq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Public Utilities
Office AddressN/A

Full Description

Show more
Invitation For QuotesSarasota County will be needing a Contractor that will provide all labor, transportation, material, parts, equipment and resources necessary to perform crane and hoist inspections, maintenance, and repair services .The County anticipates an initial contract term of 3 years.Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements.

More opportunities from Florida → Public Utilities

Same awarding agency

NAICS: 237110
New
SLED
Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Solicitation # IFB-438-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A (Project No. 25-4261 / IFB-438-26-JM), a construction project focused on the repair and replacement of critical facilities at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work comprises six primary elements: lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, replacement of valves for storage tanks 3 and 4, and the replacement of clearwell sample lines. The project budget is estimated to be under 4.5 million dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on price, qualifications, financial capability, and past performance. The contract establishes a total duration of 645 calendar days, with substantial completion required by day 615. Failure to meet these timelines may result in liquidated damages of 2,500 dollars per day. The selected contractor must provide performance and payment bonds equal to the contract price and adhere to federal prevailing wage rates for Broward County. Technical requirements include compliance with OSHA standards for clearwell access, AWWA approved disinfections, and ADA accessibility. Bids must be submitted electronically via the OpenGov portal by December 3, 2026, at 3:00 PM. Payment will be processed through the City's standard application for payment form, subject to a 5 percent retainage.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
SLED
SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)
Solicitation # IFB-442-26-JM
The City of Hollywood, Florida, Department of Public Utilities is soliciting bids for Project No. 25-11070A, the SW-2 Bypass Pumping and Rehabilitation project. Located at South 8th Avenue and North Southlake Drive, this critical flood mitigation effort involves the structural rehabilitation and modernization of Stormwater Pump Station No. 2 to combat harsh coastal conditions. The project is budgeted under 3,000,000 dollars and is divided into three distinct phases: the establishment of a 20,000 GPM automated bypass pumping system with a seven-day operational demonstration period, the structural rehabilitation of the pump well including the casting of a new reinforced concrete top slab and CMU wall repairs, and final site restoration of pavement, sidewalks, and sod. The contract has a total duration of 240 calendar days from the Notice to Proceed, with substantial completion required within 210 days. Liquidated damages for delays are set at 500 dollars per day, and a 5 percent retainage will be held until final acceptance. Bidders must hold an active Florida General Contractor license and provide a bid guarantee of 5 percent of the bid amount. All work must comply with City of Hollywood, FDOT, and Florida Building Code standards, and laborers must be paid according to US Department of Labor prevailing wage rates for Broward County. Bids are due by November 25, 2026, via the OpenGov portal.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
SLED
Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A)
Solicitation # IFB-451-27-JM
The City of Hollywood, Florida, has issued solicitation IFB-451-27-JM for the construction of the Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A). The scope of work encompasses comprehensive site, civil, structural, and electrical services, including the removal of the existing generator and fuel tank and the installation of a new emergency generator designed to withstand a 500-year flood event. Key project requirements include maintaining continuous sanitary service throughout construction and coordinating with agencies such as FEMA, AT&T, and FPL. The project must be completed by November 30, 2026, with all work adhering to strict technical standards from organizations such as ANSI, NEMA, and NECA. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of financial capability, past performance, licensing, and professional references. Bidders must submit their proposals through the OpenGov e-Procurement Portal by the specified deadline, including a bid guaranty of 5 percent and a commitment to provide performance and payment bonds equal to 100 percent of the total bid. Because the project involves federal grant funding via the FDEM, the contractor must comply with various federal regulations, including the Davis-Bacon Act for prevailing wages, the Clean Air Act, and the Federal Water Pollution Control Act for contracts exceeding specific thresholds. Additionally, the contractor is required to follow Generally Accepted Accounting Principles for quarterly invoicing and adhere to non-discrimination mandates under Title VI of the Civil Rights Act and the Americans with Disabilities Act.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Headwork Scrubber Rehabilitation (Project No. 23-9219)
Solicitation # IFB-439-26-JM
The City of Hollywood is soliciting bids for the Headwork Scrubber Rehabilitation project at the South Regional Wastewater Treatment Plant located at 1621 North 14th Avenue, Hollywood, Florida. The project aims to rehabilitate an odor control system designed in 1985 that has reached the end of its useful life. The scope of work includes replacing blowers, motor starters, and two scrubber vessels, while upgrading recirculation pumps, feed systems, ductwork, valves, and pH controls. Additionally, the contractor will perform minor electrical, instrumentation, and yard piping improvements. The project budget is under 8 million dollars, with a contract duration of 430 calendar days and a requirement to commence work within ten days of the contract date. Award will be granted to the lowest responsive and responsible bidder, with a local preference policy allowing Hollywood-based vendors to submit a second bid if their initial quote is within 5 percent of the lowest non-local bid. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the total bid. The project is subject to prevailing wage requirements and federal procurement standards. Technical specifications cover various divisions including demolition, concrete, metal fabrications, and electrical systems, with strict inspection criteria including hydrostatic leak testing for scrubbers and visual weld inspections. Payments will be made via ACH within 30 days of a final accounting statement.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS