Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Critchfield Road Three Phase Power Extension, City of Port Angeles, WA #CON-2026-04

Closed
CON-2026-04State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and transformer structures. Additional requirements encompass the installation of grounding systems, above-ground conduits, and comprehensive site work including excavation, structural fill, grading, and site restoration. The project must adhere to strict technical standards, including NESC, NEC, IEEE, and ANSI, and requires compliance with Ohio State Prevailing Wage laws and the Americans with Disabilities Act. Bids are due by October 29, 2026, and must be submitted in duplicate. Award selection will be based on a comparison of relative merits and the lowest and best bid. Successful bidders must provide a bid bond of no less than 10%, as well as performance and payment bonds equal to the contract price. The contract also mandates a Drug Free Workplace Compliance Affidavit and requires contractors to assist the owner during the start-up and commissioning of all systems. Performance is subject to a penalty of $500 per calendar day for deliveries exceeding the designated completion date. All equipment must be delivered F.O.B. to the job site in undamaged condition with detailed packing lists.
City of Piqua

POSTED

about 9 hours ago

DEADLINE

in 1 day
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 16 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Critchfield Road Three Phase Power Extension project, solicitation number CON-2026-04, involves the installation of a three-phase 12.5kV underground distribution system in Port Angeles, Washington. The scope of work includes the installation of vaults, cabling, terminations, conduits, transformers, and secondary pedestals, as well as the demolition of an existing single-phase 7.2kV overhead distribution line. Additionally, the contractor is responsible for tying existing services into the new line, replacing specific poles and overhead conductors, and installing a new single-phase underground tap and transformer for a customer. The City of Port Angeles will supply major components including sectionalizing cabinets, transformers, hardware, vaults, and cable. The contractor is responsible for providing all labor, equipment, and materials not supplied by the city, such as conduit, fittings, trenching, bedding, backfill, and site restoration. Furthermore, the contractor must manage all traffic control plans, flagging, personal protective equipment, and the disposal of all removed materials to ensure the project adheres to the contract plans and standard specifications.

General Info

Installation of three-phase underground power distribution system in Port Angeles, Washington.

Place of Performance

Port Angeles, WA, 98362, USA

Set-Aside

NONE

Documents

148

Advertisement for Bids - Page 1.jpg

JPG

Advertisement for Bids - Page 2.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Specs & Plans - Page 100.jpg

JPG

Specs & Plans - Page 101.jpg

JPG

Specs & Plans - Page 102.jpg

JPG

Specs & Plans - Page 103.jpg

JPG

Specs & Plans - Page 104.jpg

JPG

Specs & Plans - Page 105.jpg

JPG

Specs & Plans - Page 106.jpg

JPG

Specs & Plans - Page 107.jpg

JPG

Specs & Plans - Page 108.jpg

JPG

Specs & Plans - Page 109.jpg

JPG

Specs & Plans - Page 10.jpg

JPG

Specs & Plans - Page 110.jpg

JPG

Specs & Plans - Page 111.jpg

JPG

Specs & Plans - Page 112.jpg

JPG

Specs & Plans - Page 113.jpg

JPG

Specs & Plans - Page 114.jpg

JPG

Specs & Plans - Page 115.jpg

JPG

Specs & Plans - Page 116.jpg

JPG

Specs & Plans - Page 117.jpg

JPG

Specs & Plans - Page 118.jpg

JPG

Specs & Plans - Page 119.jpg

JPG

Specs & Plans - Page 11.jpg

JPG

Specs & Plans - Page 120.jpg

JPG

Specs & Plans - Page 121.jpg

JPG

Specs & Plans - Page 122.jpg

JPG

Specs & Plans - Page 123.jpg

JPG

Specs & Plans - Page 124.jpg

JPG

Specs & Plans - Page 125.jpg

JPG

Specs & Plans - Page 126.jpg

JPG

Specs & Plans - Page 127.jpg

JPG

Specs & Plans - Page 128.jpg

JPG

Specs & Plans - Page 129.jpg

JPG

Specs & Plans - Page 12.jpg

JPG

Specs & Plans - Page 130.jpg

JPG

Specs & Plans - Page 131.jpg

JPG

Specs & Plans - Page 132.jpg

JPG

Specs & Plans - Page 133.jpg

JPG

Specs & Plans - Page 134.jpg

JPG

Specs & Plans - Page 135.jpg

JPG

Specs & Plans - Page 136.jpg

JPG

Specs & Plans - Page 137.jpg

JPG

Specs & Plans - Page 138.jpg

JPG

Specs & Plans - Page 139.jpg

JPG

Specs & Plans - Page 13.jpg

JPG

Specs & Plans - Page 140.jpg

JPG

Specs & Plans - Page 141.jpg

JPG

Specs & Plans - Page 142.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Port Angeles
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jack Nieborsky

Interested Companies (7)

Northwest BarricadeEverett, WA
Fence SpecialistsTacoma, WA
Magnum PowerToledo, WA

See All 7 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This Contract shall generally consist of installation of a three-phase 12.5kV underground distribution line, vaults, cabling, terminations, conduits, transformers and secondary pedestals, demolition of a single-phase 7.2kV overhead distribution line, and tying in existing services to the new distribution line. Work will be along Critchfield Rd in the City of Port Angeles all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
City will provide:
Sectionalizing cabinets, transformers, pole and framing hardware, riser assembly, marker ball(s), vaults, cable and cable ID tags.
Contractor to provide:
All conduit, sweeps and fittings, incidental hardware and material such as glue and tape, protection bollards, trenching, bedding, backfill, restoration, and labor and equipment, PPE, traffic control/flagging, and traffic control plans, to install an underground three-phase power system, and demolition of the existing overhead single-phase power system on Critchfield Rd, City of Port Angeles, disposal of all removed items, and site restoration.
Contractor to install:
New single-phase underground tap and transformer to feed existing customer. Replace single phase pole(s) and overhead conductor to support existing single-phase overhead tap to feed existing customer. Pull in 4/0 or 1/0 primary conductor as specified in the Plans, install city-provided cable ID tags, ground equipment, terminate and connect, according to the work requirements described below.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS