Culvert Installation – Corrugated Steel Pipe Supply & Placement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
Solicitation 2026-RFP-0272 is a request for proposals from the City of Pasadena Water and Power Department to provide comprehensive wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves the maintenance and documentation of approximately 11,000 wood poles to ensure system reliability and compliance with CPUC General Orders 95 and 165. Key deliverables include georeferenced UAV reports, the identification of structural defects, and specific maintenance tasks such as the installation of trusses, guy guards, and pole tags. The contract is designed for an initial four-year term with two optional one-year extensions. Proposers must submit separate technical and price proposals via the City's eProcurement Portal by November 5, 2026. Evaluation is based on a points-based scoring system focusing on technical competence, safety practices, and experience, with specific 5-point preferences available for certified California small/micro-businesses or local Pasadena businesses. Mandatory requirements include FAA Part 107 certification for UAV operations, submission of Form AA-1 and AA-2, and a detailed quality assurance plan. Additionally, the contract prohibits the use of City data for training AI or machine learning models and requires strict adherence to ADA accessibility and prevailing wage laws.
Water & Power Department, Power Delivery

POSTED

2 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This subcontract opportunity with the California Department of Transportation involves the supply and installation of 18-inch and 24-inch corrugated steel pipe for culvert replacement projects located on Route 80 in Solano County. The scope of work focuses on the procurement and placement of these specific piping materials to ensure proper drainage and infrastructure stability. The solicitation was posted on March 10, 2025, and requires responses to be submitted by the deadline of March 24, 2025. Classified under NAICS code 237130 for highway, street, and bridge construction, this project is managed through the CalProcure system.

Documents

This scope was carved out of 04A7207.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB Minor B 04A7207 - CULVERT REPLACEMENT - Solano County

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of 18” and 24” corrugated steel pipe for culvert replacement on Route 80 in Solano County.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS