Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on December 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CUP, QUART , MIXING 32 FL OZ. .947L, | 2097067

Awarded
2097067State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 312130
SLED
Bella Oaks Winery Use Permit Minor Modification (P23-00032-MM) and Administrative Permit (P25-00284-ADMIN)
Solicitation # P23-00032-MM
The Bella Oaks Winery project, located at 1271 Manley Lane in Napa, California, involves a Winery Use Permit Minor Modification (P23-00032-MM) and an Administrative Permit (P25-00284-ADMIN). The primary scope of work is the replacement of an existing 8,177 square foot winery and 3,740 square foot crush pad with a new two-story, 17,192 square foot facility. This new structure will include 12,288 square feet of production space, featuring a 2,750 square foot covered crush pad and 9,538 square feet for fermentation, barrel storage, and a lab, alongside 4,903 square feet for accessory uses such as a tasting room, offices, and employee break rooms. Supporting infrastructure improvements include the installation of new water storage and distribution systems for domestic use and fire protection, the replacement of wastewater treatment systems, and the upgrade of driveways to Napa County Road and Street Standards. Site enhancements involve adding eight parking spaces (six standard and two accessible), 12 valet overflow spaces, two EV charging stations, and bike racks, as well as replacing 14 trees with a refreshed landscape of sycamore trees, grasses, and shrubs. Operationally, the winery will increase its full-time staff from four to ten and extend daily visitation hours to 10:00 a.m. to 6:00 p.m. While maintaining a 25-vehicle daily limit, the winery is permitted an average of 60 visitors per day and a maximum of 75. The project replaces full-sized tour buses with sprinter-van style vehicles and establishes a marketing plan for ten annual events of up to 40 attendees and one annual event for up to 80 attendees. The project is subject to a Mitigated Negative Declaration, with specific compliance requirements for noise and biological resources, and must adhere to ASTM D6299-2007 for construction environmental air quality.
Napa County

POSTED

about 2 months ago

DEADLINE

N/A
NAICS: 312130
SLED
Arrow and Branch Winery, Use Permit Major Modification #P23-00057-MOD
Solicitation # P23-00057-MOD
The Arrow and Branch Winery Use Permit Major Modification (P23-00057-MOD) was approved by the Napa County Board of Supervisors on April 28, 2026. Located on a 10.09-acre site in Napa, California, the project authorizes an increase in annual wine production from 30,000 to 45,000 gallons. The scope of work includes expanding the winery building to create a total of 13,797 square feet of production space and 4,308 square feet of accessory space. Additional site improvements involve the construction of a balcony, a covered terrace for outdoor tasting, the installation of an 81,000-gallon process water storage tank, and the reconfiguration of existing parking to include twelve spaces, one of which is designated for ADA access. Operationally, the modification allows for increased employment, more marketing events, and an increase in daily tours and tastings by appointment only. The project has undergone extensive environmental and technical review, resulting in a Mitigated Negative Declaration under CEQA. Key assessments include a Tier 3 Water Availability Analysis confirming that groundwater pumping will not impact the nearby Dry Creek, and a biological assessment concluding that no suitable habitat for the Northern Spotted Owl exists on-site. The project must adhere to strict lighting requirements to minimize impact on adjacent properties and comply with Napa County General Plan noise standards. Infrastructure requirements include the classification of the onsite water system as a transient noncommunity public water system and the implementation of a Mitigation Monitoring and Reporting program to protect biological and noise resources. Projected annual operational and maintenance expenses for the water system are estimated to range from approximately 22,024 dollars in 2023 to 23,483 dollars by 2027.
Napa County

POSTED

5 months ago

DEADLINE

N/A
NAICS: 312130
SLED
Promise Winery
Solicitation # P22-00384
The Promise Winery project, located at 2000 Sage Canyon Road in St. Helena, California, involves a comprehensive request for a Use Permit, a Variance, and an Exception to Napa County Road and Street Standards. The development is structured in two distinct phases on a 62.56-acre parcel. Phase I focuses on establishing winery operations by converting and expanding an existing barn into a 2,794 sq. ft. production space and repurposing an accessory dwelling unit into a tasting room, with an initial production capacity of 5,000 gallons per year and a staff of five. Phase II expands the facility's capabilities to 30,000 gallons of annual production through the construction of a 5,000 sq. ft. production cave, a 1,235 sq. ft. covered crush pad, a 1,040 sq. ft. mechanical enclosure, and a 900 sq. ft. parking structure with an ADA restroom. Operational activities include daily tours and tastings limited to 15 visitors per day, as well as specific private marketing events. The project requires significant site improvements and mitigation strategies to address environmental and safety concerns. Infrastructure plans include widening the driveway, installing intervisible turnouts for emergency vehicle access, and implementing vegetation management to maintain sightlines. To address environmental impacts, the project includes a Mitigated Negative Declaration addressing biological and tribal cultural resources, alongside a plan to mitigate vegetation loss through a 3:1 acreage ratio. Water and wastewater management are critical components, with studies confirming groundwater availability and a plan for wastewater reuse in vineyard irrigation to comply with state discharge requirements. The development is subject to oversight by various agencies, including Napa County, Caltrans, and the Water Quality Control Board, with public hearings scheduled to address the proposed variances and environmental mitigations.
Napa County

POSTED

10 months ago

DEADLINE

N/A

AI Contract Overview

Show more

Dallas Area Rapid Transit Authority is soliciting bids for the procurement of 32 fl oz mixing cups under solicitation number 2097067. The response deadline is December 18, 2025, with all submissions required electronically via the Bonfire platform. The scope of work involves providing supplies that meet all technical requirements and manufacturer specifications, with a strict emphasis that the time and rate of delivery are of the essence. Failure to meet delivery schedules may result in rejection of the order or termination for default. All bids must reflect FOB Destination shipping terms with freight costs included in the overall price, as FOB Origin and Prepay and Add terms are not accepted. Payment terms are Net 30, with invoices submitted in triplicate to a designated email address. The contract requires sellers to certify that they do not participate in boycotts of Israel and have no affiliations with foreign terrorist organizations. Inspection and acceptance of the goods will occur at the destination in Texas. The agreement is governed by the Authority's standard Purchase Order Terms and Conditions, which include provisions for termination for convenience, dispute resolution, and prohibitions against pecuniary interests involving public officials.

General Info

Contract Value

$702.24

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Purchase Order Terms and Conditions - Dallas Area Rapid Transit Authority

PDF, High priority: read this first4 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
Contacts1 person available
OfficeTX, USA
Office AddressTX, USA

Full Description

Show more
--- ***BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE*** *To access details / BidTable, please initiate the "Prepare Your Submission" process at the bottom of the page -- Thereafter, locate the in-browser BidTable window and scroll right for project details and vendor response fields.*
--- **PURCHASE ORDER TERMS AND CONDITIONS** -- All purchase orders are subject to Dallas Area Rapid Transit Authority's Terms and Conditions. The complete PO Terms and Conditions PDF is available for download in the "Supporting Documentation" section below.
**Freight Terms Notice -** Please ensure that all bids/quotes reflect FOB Destination shipping terms with the freight cost included in the overall price. DART does not typically accept FOB Origin or Prepay and Add terms.
**Delivery Terms Notice -** Time and rate of deliveries are of the essence of this order. Seller's failure to deliver at the time and rate specified shall be the basis for rejection and default termination by the Authority (*Dallas Area Rapid Transit Authority*).
**Payment Terms Notice -** All vendors are advised that DART's payment terms are Net 30. Invoices shall be submitted (APInvoices@dart.org) in triplicate (one copy shall be marked 'Original"), unless otherwise specified, and shall contain the following information: purchase order number; item number; purchase order description of supplies, services, or construction; sizes; quantities; unit prices; and extended totals. Unless otherwise specified, payment will be made on partial deliveries accepted by the Authority when the amount due on such deliveries so warrants. *Invoices will be paid 30 days from receipt of the invoice or 30 days from receipt of the order, whichever is later, unless other payment terms have been agreed upon in writing.*
**Termination for Default Notice -** The Contracting Officer may by written notice terminate this order, in whole or in part, for failure of the Seller to perform any of the provisions hereof within the time periods specified. In such event, the Seller shall be liable for damages, including the excess cost of reprocuring similar supplies or services or completing construction; provided that, if (i) it is determined for any reason that the Seller was not in default, or (ii) the Seller's failure to perform is without his and his subcontractor's control, fault, or negligence, the termination shall be deemed to be a termination for convenience under paragraph 12. As used in this provision, the term "subcontractor" and "subcontractors" means subcontractors, vendors, and suppliers at any level.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS