Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on September 11, 2002. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

D -- Route Selection and Alignment Optimization Model

Closed
RFI-091102-001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Bechtel SAIC Company, LLC is seeking information from firms that possess a Route Selection and Optimization Model capable of automatically generating digital terrain models for optimized railway and highway alignments. The required tool must process satellite and aerial imagery to evaluate multiple corridor alternatives by balancing engineering design criteria, costs, and various socioeconomic, environmental, and sociopolitical constraints. Key technical capabilities include the ability to identify bridge and tunnel requirements, integrate watershed models for culverts, handle Imperial units, and provide detailed output such as material quantities and greenhouse gas emission estimates. Interested respondents must submit comprehensive documentation by October 4, 2002, including their firm's business structure, financial statements, and a detailed history of similar highway and railroad projects completed over the last five years. The submission must verify the firm's ownership rights to the model and its ability to produce results that can be easily presented to non-technical stakeholders. Work for this engagement will be conducted both at the respondent's offices and on-site at the Bechtel SAIC facilities in Las Vegas, Nevada.

General Info

Bechtel SAIC seeks firms with route optimization models for railway and highway alignments.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Work will be performed both off site at the respondents offices, and on-site at the Bechtel SAIC Company, LLC, facilities in La

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Ronni A KammlerContracts/Purchases Agent

Full Description

Show more
1. INTRODUCTION Bechtel SAIC Company, LLC (BSC) is hereby expressing interest in obtaining information from firms that have a Route Selection and Optimization Model that is capable of fulfilling the requirements described below. Responding firms (Respondents) must submit documentation as specified in Section 4 below that provides detailed information on similar types of work performed and completed in application of their model. Sufficient detail should be included to allow BSC to evaluate the firm??s model, experience with use of the model, ease of use of the model and ability to generate the required results. In addition, other information related to the firm and its financial standing is required. 2. OPTIMIZATION MODEL REQUIREMENTS: Description: A planning tool that processes available satellite and aerial image data using computational techniques to automatically generate digital terrain models of optimized railway and highway alignments taking into account costs and other constraints as described herein. The system must be capable of generating and comparing many alternative alignments which allow planners freedom to balance environmental and socioeconomic factors against costs generated for each alignment. The model must consider factors during the optimization process which include terrain, geotechnical, geological, hydraulic and environmental concerns along with engineering design criteria and the proximity of existing infrastructure. Corridor Alternatives The model must take into consideration socioeconomic, sociopolitical, environmental, engineering, operational and institutional requirements. The program must generate output documents and maps that can be readily displayed to non-technical persons in workshop sessions enabling the evaluation of corridor preferences. Progressive scales of resolution will be necessary. Alignment Selection The program must evaluate a wide range of alignments within a given route or corridor and provide an optimized alignment which takes into consideration engineering, design, man made and natural obstacles, environmental issues, sociopolitical and socioeconomic issues, quantities and costs. Output should include defined alignments with material quantities and cost parameters. The model must have the capability to generate and optimize multiple horizontal and vertical alignments along with the locations and sizes of highway overpasses, bridges, major culverts, retaining walls, cut and fill sections, tunnels, and at-grade road crossings. The model should include the following features: A. General Capability: 1. Automated alignment optimization and refinement. 2. Able to display singular and multiple alignments. 3. Enable screening evaluation of a broad range of potential alignment and profile options. 4. Be user-friendly for easy use in applications. 5. Able to incorporate professional judgement. 6. Find the optimum alignment with minimum cost taking into consideration; topography, geotechnical and geological conditions, hydrological and hydraulic conditions, environmental impact, socioeconomic, sociopolitical, and socioeconomic factors, and engineering and operational criteria. 7. Able to handle a wide range of corridor and alignment related capital and operating costs. 8. Able to export to and incorporate highway and railway performance models. 9. Able to identify bridge and tunnel requirements. 10. Ability to expand plotting for reports, alignment maps, profiles, cross-sections and other pertinent information. 11. Adaptability to use remotely sensed data. 12. Incorporate a watershed model to locate culverts. 13. Ability to function in Imperial units. 14. Automated interface with other programs that compute volumes (Inroads/Intergraph). 15. Ease of conversion and handling available USGS and GIS data. 16. Able to consider rail operational constraints. 17. Able to take into account land use. 18. The system must incorporate audit trails so that alignments can always be linked to the conditions under which they were created. B. Environmental Considerations: 1. The system must be able to locate transport infrastructure horizontally and vertically to meet specified social, environmental and engineering constraints. 2. Once the specified social, environmental and engineering constraints are met the optimization should be cost driven. 3. The environment constraints should include ?h areas from which the alignment can be banned, ?h behavior modifying areas which can be entered subject to constraints on the form of construction and/or elevation, ?h linear features that specify the type of construction and height restrictions for any crossing. 4. Display fuel consumption and greenhouse gas emission estimates for each alignment. 5. Enable comprehensive investigation of alignment options to demonstrate to the stakeholders and local community that alternatives have been investigated. 6. Enable fast, 48 hour, determination of new alignments as and when new environmental or community zones are identified during the consultation process. 7. Because of the multidimensional nature of environmental impacts the system must produce a range of alignments to allow planners and community groups a choice when balancing progress towards different qualitative goals. C. Engineering Considerations 1. The alignments should be accurately located so that final adjustments to meet requirements that are a matter of local judgement and preferences will not require the location of the alignment to be shifted by more than a few feet horizontally and less vertically. 2. The costing component of the system should include ability to set unit rates for extraction, transport and placement of material, and construction of structures. 3. The system should balance cut and fill where appropriate. 4. The system must cater for varied geological conditions within corridors including multiple geological zones with multiple strata, and automatic generation of cross section templates, with costs and batter slopes that are a function of strata. 5. The system must produce alignments that meet geometric requirements appropriate to the type of infrastructure. 6. Limiting grades at points or over sustained distances, 7. Limiting radii of curvature on horizontal curves, crests and sags, 8. Coordination of horizontal and vertical curvature to maintain safe sight distances. 9. Display alignments and properties in plan and profile. 10. Display multiple alignments in plan view. 11. Employ ortho-rectified photographic images as an alternative background when displaying alternative alignments in plan. 3. LOCATION OF THE WORK Work will be performed both off site at the respondents offices, and on-site at the Bechtel SAIC Company, LLC, facilities in Las Vegas, Nevada. 4. INFORMATION DOCUMENTATION REQUIREMENTS A. General Provide name of respondent??s firm, home office address, phone number, fax and e-mail. Identify the business structure of the respondent??s firm. Provide the address, phone, fax and e-mail of the respondent??s firm office nearest to Las Vegas, Nevada. B. Model Development Provide a summary description of the route selection and alignment optimization models development process and current status. Does the respondent have full ownership and use rights for the model? C. Model Application Experience Provide a description on a project by project basis of the significant highway and railroad applications of the model over the last five years. For each project, at a minimum the following must be provided: ?h Client Name, Address, Contact Name and Telephone Number ?h Description of the work performed ?h Key results achieved ?h Value of contract at the time of award ?h Value of contract at completion ?h Start and completion date of work D. Financial Information Respondent must provide the most current annual report or CPA-certified financial statement to demonstrate financial responsibility. CPA certification is preferred. Offeror shall also submit a current Dun & Bradstreet Report of Condition. 5. RESPONSE SUBMITTAL Written responses are required no later than the close of business on or before October 4, 2002, 1:00 p.m PST. Include the name, title, address, telephone number, facsimile telephone number, and E-mail address of the responsible person to whom future communications regarding the pre-qualification and the RFP should be addressed. Address information documentation and all questions concerning this RFI to: Bechtel SAIC Company, LLC 1180 Town Center Drive Las Vegas, Nevada 89144 Attention: Gerald Piscitelli RFI No. : RFI-091102-001 E-mail: contact@example.gov Fax: +1 (555) 000-0000

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS