Dam Removal

Awarded
AG-63A9-S-15-0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 18 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The USDA Forest Service, Superior National Forest, issued solicitation AG-63A9-S-15-0008 for a fixed-price contract to remove the Icon Dam from the St. Louis River in Hoyt Lakes, Minnesota. The project aims to restore the area to a natural condition and involves excavating the dam and spillway material, stockpiling and shaping that material in an onsite disposal pile, and rehabbing disturbed areas. Additional scope includes the construction of 0.5 miles of temporary access road, building a temporary crossing, and performing two miles of roadbed reconditioning and spot filling. The estimated project value is between 80,000 and 130,000 dollars, with a performance period scheduled from June 1, 2015, to October 30, 2015. This opportunity is a total small business set-aside, requiring the successful offeror to be a certified 100 percent small business registered in the System for Award Management. The contract incorporates specific technical requirements for roadbed reconditioning, adherence to Department of Labor Wage Determination No. 2005-2285 for labor rates in Minnesota and Wisconsin, and compliance with FAR clause 52.223-2 regarding the affirmative procurement of biobased products. Proposals were due by May 8, 2015, and were managed by the Department of Agriculture office in Duluth, Minnesota.

General Info

USDA contract for Icon Dam removal and restoration in Minnesota, June-October 2015.

Contract Value

$80,598

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

The project is located in Lake County Minnesota. Take CR 110 southeast from Hoyt Lakes approximately 4 miles and then turn sout, HOYT LAKES, MN, 55705, USA

Set-Aside

SBA

Award Issued Date

Documents

5

Icon Dam Removal - Drawings and Technical Notes

PDF, High priority: read this firstspecifications
High

Road Reconditioning Amendment

PDF, High priority: read this firstamendment
High

Solicitation AG-63A9-S-15-0008: Icon Dam Removal

PDF, High priority: read this firstifb
High

Wage Determination No. 2005-2285 (Rev. 14)

PDF, High priority: read this firstwage-determination
High

FAR 52.223-2 Affirmative Procurement of Biobased Products

PDF, Low priorityclause
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Superior National Forest
Contacts1 person available
OfficeDULUTH, MN, 55808, USA
Office AddressDULUTH, MN, 55808, USA
Contacts
Paul G. NephewContract Specialist

Full Description

Show more
Amendment #2 (a) Replace 303.05 Roadbed Reconditioning (See Attachement) (b) Update FAR Clause 52.223-2 (See Attachement) Amendment #1 Add Solicitation, Wage Rates, and Maps as attachments. The USDA Forest Service, Superior National Forest contemplates issuing a solicitation (request for proposals) for the removal of Icon Dam. The project involves removing the Dam from the St. Louis River to restore the area to a more natural condition and includes 2 miles of road reconditioning and spot filling of the access road, 0.5 miles temp road construction to access the dam, building a temporary crossing, excavating the dam and spillway material, stockpiling and shaping that material in an onsite disposal pile, and rehabbing the disturbed areas. The solicitation and related documents will ONLY be available for download at https://www.fbo.gov/ on or about April 8, 2015. The pre-bid meeting is scheduled for April 15, 2015 @ 10:00 AM at the MnDNR boat ramp on the St. Louis River at the end of FR1060. No hard copies of the solicitation will be mailed out. Interested vendors should register to receive notifications through this site. This project is estimated to be between $80,000 and $130,000. In order to receive award under this RFP the successful offeror shall be registered in the System for Award Management (SAM) https://sam.gov, and be a certified 100% Small Business. All responsible sources may submit a proposal which shall be considered by the Forest Service. This is a synopsis, the full solicitation documents including specifications will be issued on or about April 8, 2015.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS