Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on April 16, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Finger Lakes Trough, Hydrant, Culvert Work

Awarded
AG-1681-S-15-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This project involves infrastructure improvements and site restoration within the Hector Ranger District of the Finger Lakes National Forest Service in New York. The scope of work is divided between two primary locations: Backbone Horse Camp and Auble Pond. At Backbone Horse Camp, the contractor is responsible for dredging a 4,500 square foot pond, restoring the dike, installing a frost free water hydrant and waterline, and replacing a 30 inch diameter trail culvert. At the Auble Pond and Backbone Trail site, the project requires dredging a larger 36,000 square foot pond, restoring the dike, replacing a water trough and waterline, and installing another 30 inch diameter trail culvert. All work includes comprehensive site restoration consisting of finish grading and seeding. This contract was managed by the Allegheny National Forest under the Department of Agriculture.

General Info

Contract Value

$59,800

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Finger Lakes NF, NY, USA

Set-Aside

NONE

Award Issued Date

Documents

6

Government Provided Technical Proposal Forms

DOCX, High priority: read this first7 pages · past-performance
High

AG-1681-S-15-0004-000001_Complete.pdf

PDF

AG-1681-S-15-0004-000002_Complete.pdf

PDF

AG-1681-S-15-0004.pdf

PDF

Attch_1_Specs_and_Drawings.pdf

PDF

Attch_2_DBWD_NY150051_010215_NY51_Heavy_Schuyler_Co.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Office AddressWARREN, PA, 16365, USA
Contacts
Alan J. ZeroContracting Officer

Full Description

Show more
This project is to dredge two ponds, install a frost free hydrant and waterline, replace a water trough and waterline, and replace two trail culverts located on the Hector Ranger District on the Finger Lakes National Forest Service. The project includes site restoration, which includes finish grading and seeding. The site locations are broken downs as follows: Backbone Horse Camp: The site location is approximately 0.15 miles North on Forest Trail 608 (Backbone Trail) from the junction of Burnt Hill Road and Picnic Area Road in Hector, NY. See Appendix A for a location map. The work at this site includes (See Appendix B for pictures of items): A. Dredging Backbone Pond and Restoring Dike (Approx. 4,500 Square Foot Pond) B. Installing a Frost Free Water Hydrant and Waterline C. Replacing a Trail Culvert (30 inch diameter) Auble Pond and Backbone Trail: The site location is approximately 0.30 miles West on Forest Trail 608 (Backbone Trail) from the junction of Vesa Road and Bower Road in Hector, NY. See Appendix A for a location map. The work at this site includes (See Appendix B for pictures of items): A. Dredging Auble Pond and Restoring Dike (Approx. 36,000 Square Foot Pond) B. Replace Water Trough and Waterline C. Replacing a Trail Culvert (30 inch diameter) Solicitastion documents are attached and all bids are due no later than 2:00PM 03/27/2015

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS