Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on June 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Daughtery Road and Green Slope Drive Intersection Improvements

Closed
2026-003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Historic Old Town Parking Lot Improvement Project
Solicitation # 500545
The Historic Old Town Parking Lot Improvement Project, solicitation number 500545, is a construction contract issued by the City of Roseville, California, to develop an at-grade surface parking lot and alleyway aesthetic improvements. The scope of work includes extensive site preparation such as clearing, grubbing, and the off-hauling of 5,000 to 8,000 cubic yards of soil, followed by the installation of hot-mix asphalt pavement, concrete flatwork, and comprehensive underground utilities including water, sewer, storm drain, and electrical systems. Additional requirements involve landscaping, irrigation, decorative steel fencing, and the installation of EV charging stations with associated lighting and electrical equipment. The contract will be awarded to the lowest responsible bidder based on the Grand Total Bid Price. All work must adhere to the City of Roseville Design and Construction Standards, California MUTCD for pavement markings and signage, and ADA compliance for accessible paths of travel. Key deliverables include a Storm Water Pollution Prevention Plan and a Rain Event Action Plan. The successful contractor must provide performance and payment bonds, certificates of insurance, and ensure all labor complies with California prevailing wage rates. Bids must be submitted in a sealed physical format by the deadline of November 10, 2026.
City of Roseville

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 237310
New
SLED
2027 Citywide Concrete Repairs And Intersection Ramps Project
Solicitation # 27-005
The 2027 Citywide Concrete Repairs and Intersection Ramps Project (Bid #PWC 8483-K / Solicitation 27-005) is a City of Fremont, California, initiative focused on the reconstruction of damaged curbs, gutters, sidewalks, and driveway approaches across various citywide locations. The scope of work includes installing pedestrian curb ramps, replacing asphalt pavement, performing tree removal and root pruning, planting new street trees, and applying pavement striping. A critical safety component of the project involves the handling of slag material in the road base, which requires a specific health and safety plan for worker protection. The estimated construction cost for the project is 3,300,000 dollars, with a performance period of 170 working days from the notice to proceed. Work is restricted to Monday through Friday, from 7:30 a.m. to 4:00 p.m. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide bid security equal to 10 percent of the maximum bid amount and, upon award, must provide performance and payment bonds for 100 percent of the contract price. Compliance requirements include adherence to California Labor Code prevailing wage laws, City of Fremont minimum wage ordinances, and CARB certifications. The contractor is responsible for all traffic control and public safety measures. Final acceptance is contingent upon the completion of all punch list items and the issuance of a written notice of acceptance by the City Engineer. Submissions must be delivered in sealed envelopes and include a completed bid schedule in ink, a subcontractor list for any entity performing more than 0.5 percent of the work, and a completed Statement of Responsibility.
City of Fremont

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 237310
New
SLED
BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)
Solicitation # 232713
The Bridge Repair Maintenance Group 2 (Re-bid) project, solicitation number 232713, is a specialized infrastructure effort by the City of Los Angeles Bureau of Engineering, Public Works. The project is designed to restore original functionality and prevent further structural deterioration of three specific locations: the Sunnyslope Avenue Pedestrian Bridge, the Coldwater Canyon and Burbank Blvd Bridge, and the Doman Avenue Pedestrian Bridge. The scope of work includes repairing concrete spalls and cracks, asphalt patching, and restoring bridge railings and timber bridge decks, along with other incidental work necessary for completion. The project is funded by the Bridge Repair and Maintenance Program and the Engineering Special Services Fund, with a city engineer's estimate of 393,300.00 dollars. This is a restricted solicitation open only to five pre-qualified prime contractors: Calex Engineering, Clarke Contracting, Jilk Heavy Construction, Inc., Mike Prlich & Sons, Inc., and Mladen Buntich Construction Company. Bids must be submitted to Los Angeles City Hall by December 9, 2026, at 2:00 p.m. While a bid bond is not required, the successful contractor must provide payment and performance bonds for at least 100 percent of the task bid price. The project complies with the California Environmental Quality Act and is managed by Marilyn Galeano of the Bridge Improvement Division.
Engineering Bureau, Public Works

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Saw Cutting, Asphalt Repair/Replacement And Paving
Solicitation # 2608
The Yucaipa Valley Water District is soliciting bid proposals for asphalt repair and paving services at various locations within the City of Yucaipa and the City of Calimesa. The scope of work includes saw cutting, removal of existing asphalt, installation of hot patches, asphalt grinding and overlay, manhole adjustments, and subsurface subsidence repair. Contractors must adhere to the paving standards of both cities, follow the American Public Works Association Work Area Traffic Control Handbook, and comply with CARB 2022 amendments for In-Use Off-Road Diesel Fueled Fleets. The contractor is responsible for obtaining all necessary permits, including encroachment permits for work within the City of Yucaipa right-of-way, and must ensure the legal disposal of all residues. Repairs are required to begin within one week of notification and must be completed within four weeks. Eligible bidders must possess a valid California State Contractors License and demonstrate a proven record of performing similar work for at least five years. Submissions must include a company profile, a signed non-collusion statement, and up to five professional references. The District will evaluate awards based on the best interest of the agency, focusing on quality, timeliness, and cost-effectiveness. Payment terms are set at Net 30 Days. Compliance with California prevailing wage laws, OSHA standards, and specific insurance requirements—including naming the District as an additional insured and waiving subrogation—is mandatory. Sealed proposals must be submitted to John Wrobel by November 10, 2026, at 10:00 a.m.
Yucaipa Valley Water District

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The solicitation titled "Daughtery Road and Green Slope Drive Intersection Improvements" seeks contractor proposals for roadway enhancements at a key intersection in Florida, specifically involving the construction of a new southbound right-turn lane along Green Slope Drive at Daughtery Road. The project entails widening approximately 220 feet, including taper and transition areas, to improve traffic flow. Additionally, the scope includes upgrading electrical pump equipment located at the northwest corner of the intersection, focusing on replacement and automation to enhance operational reliability. All construction activities must align with detailed plans and specifications prepared by Kimley-Horn as of March 2025, which comprehensively govern the technical and procedural aspects of the work. This solicitation, issued by the Florida Purchasing office under solicitation number 2026-003, is classified under NAICS code 237310, indicating building and heavy construction trades work. The solicitation was publicly posted on June 14, 2026, with proposals due by July 13, 2026. The project is to be performed within the state of Florida, with the city of Zephyrhills identified as the office location overseeing procurement. While the contract documents include thorough construction plans and specifications, other standard contract clauses, evaluation criteria, pricing details, special requirements, and inspection or acceptance procedures were not provided. The designated point of contact for this solicitation is Jessica Carter, Finance Supervisor, reachable via email and phone. The contract documents and associated attachments fully define the work and are the controlling documents for construction and quality standards.

General Info

Roadway improvement at Daughtery Road, adding turn lane and upgrading pump equipment in Florida.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

4

AIA Document G701-2017 Change Order

PDF, High priority: read this firstchange-order
High

City of Zephyrhills ITB 2026-003 Daugherty Road and Green Slope Drive Intersection Improvements

PDF, High priority: read this firstitb
High

Daughtery Rd & Green Slope Dr Electrical Pump Plans

PDF, High priority: read this firstspecifications
High

Daughtery Rd & Green Slope Dr Roadway Plans Work Order 24-158

PDF, High priority: read this firstcontract-plans
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Purchasing
Contacts1 person available
OfficeZephyrhills, FL, 33542, USA
Organization / AgencyFlorida → Purchasing
Office AddressZephyrhills, FL, 33542, USA
Contacts
Jessica CarterFinance Supervisor

Interested Companies (1)

Flores ConstructionTampa, FL

Full Description

Show more
Green Slope Drive is a City-owned collector roadway connecting Kossik Road to the north and Daughtery Road to the south. Improvements are proposed at the intersection of Daughtery Road and Green Slope Drive to construct a southbound right-turn lane along the southbound approach. The total length of widening, including taper and transition, is approximately 220 feet. The work also includes electrical pump upgrades at the northwest corner of the intersection, including replacement and automation of existing equipment as shown in the plans. The work shall be constructed in accordance with the construction plans prepared by Kimley-Horn dated March 2025. The plans, specifications, and details included in the Contract Documents govern the work in its entirety.

More opportunities from Florida → Purchasing

Same awarding agency

NAICS: 236220
New
SLED
CDBG-DR HS020 New Century Community Shelter Project Phase 2 - Building Construction
Solicitation # PD 26-27.003
Escambia County is soliciting bids for the CDBG-DR HS020 New Century Community Shelter Project Phase 2, a federally funded initiative to increase disaster resilience in the Town of Century. The project involves the renovation of an existing gymnasium and the construction of a new community shelter addition at 720 E Hecker Rd, Century, Florida. The facility is designed as a Type II-B, fully sprinkled, nonseparated Group A-3 Assembly occupancy with Group B Business and accessory spaces. The scope of work includes comprehensive building construction, including foundations, a thermoplastic-polyolefin roof, HVAC systems with BACnet controls, electrical and life-safety systems, and specialized interior finishes such as wood athletic flooring. The contract requires substantial completion within 240 consecutive calendar days from the Notice to Proceed, with final completion due within 270 days. Bids are due by November 16, 2026, and will be awarded on an all-or-none total basis. Contractors must provide a bid bond of 5 percent of the total offer and adhere to Building Wage Determinations for pricing. Compliance with HUD regulations is mandatory, specifically regarding Section 3 requirements to provide economic opportunities to low- and very low-income persons. Additionally, contractors must comply with 2 CFR 200 regarding domestic preference for U.S. materials and the procurement of recovered materials for items exceeding 10,000 dollars. Administrative requirements include active registration in the System for Award Management and the submission of a Quality Control Plan within 10 days of the Notice to Proceed. Insurance requirements specify general liability coverage of at least 2 million dollars per occurrence and 4 million dollars annual aggregate, with completed operations coverage maintained for at least three years post-acceptance. Invoicing is managed monthly through the Commerce Subrecipient Enterprise Resource Application system. All work must meet ADA accessibility standards and OSHA safety regulations.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 18 days
View Details
NAICS: 561730
New
SLED
Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF
Solicitation # PD 25-26.118
Solicitation PD 25-26.118 is an Invitation to Bid issued by Escambia County for the Dune Matrix Enhancement project at Pensacola Beach, Florida. Funded by the National Fish and Wildlife Foundation National Coastal Resiliency Fund, the project aims to improve coastal resiliency and biodiversity through the installation of approximately 78,710 units of native vegetation, including sea oats, panic grass, and diversity groundcover. The scope of work also includes the installation of sand fencing, post-and-rope fencing, and signage, as well as the removal of asphalt debris across approximately 24,004 square yards. All planting must utilize a super absorbent polymer pre-hydrating gel and adhere to specific root ball and depth requirements. The contract requires substantial completion within 150 consecutive calendar days from the Notice to Proceed, with total completion due within 180 days, excluding documented weather delays. Bids are evaluated based on responsiveness, responsibility, and price, with the County reserving the right to award on an all-or-none or lot-by-lot basis. Because of the federal funding source, the project must comply with the Davis-Bacon Act for prevailing wages, the Copeland Anti-Kickback Act, and Build America, Buy America requirements for iron, steel, and construction materials. Contractors must provide performance and payment bonds, maintain general liability insurance, and ensure all work complies with OSHA standards and the Americans with Disabilities Act.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS