--Design-Build Construction Contract for the Central Heat and Power Plant (CHPP) Electrical Distribution System Upgrade, Fort Wainwright, Alaska, UPC NO. FTW 333

Active
USA-SNOTE-070411-005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves a forthcoming solicitation for a design-build construction project to upgrade the electrical distribution system at the Central Heat and Power Plant (CHPP) in Fort Wainwright, Alaska. The upgrade focuses on replacing the existing substation, increasing power capacity, and modernizing the entire distribution infrastructure. Key work includes adding and replacing transformers, updating all switchgear and protective devices, enhancing the generator control system with current advanced controls and monitoring technology, and installing standby generation to enable a 'black-start' capability for the CHPP. Additionally, the project will upgrade the power distribution and breaker system by introducing looping capability and replacing select distribution feeders. The power system comprises poles, fixtures, overhead and underground conductors, street lighting components, transformers, and critical electrical equipment such as generator switchgear, controls, and the substation tie with the local utility. This draft solicitation, released to gather industry feedback prior to the final release, is posted on the FEDTEDS website with the solicitation number W911KB-07-R-0005. The government encourages comments and suggestions to be sent to the designated contact, Kevin Maloy, by May 1, 2007. Although the draft serves to inform industry stakeholders and solicit input, it does not commit the government to any contract award nor cover any incurred costs during response preparation. The project falls under NAICS code 237130 and is overseen by the U.S. Army Corps of Engineers, Alaska office based in Anchorage. This design-build contract reflects an essential modernization effort to ensure increased reliability and efficiency of Fort Wainwright's power infrastructure.

General Info

Design-build contract to upgrade Fort Wainwright electrical system with modernized substations and controls.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

AK

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
ContactsNo contacts available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA
ContactsNo contact information available

Full Description

Show more
This is a notice of intent to issue a solicitation in summer 2007 for the Design-Build Construction Contract for the Central Heat and Power Plant (CHPP) Electrical Distribution System Upgrade, Fort Wainwright, Alaska, UPC NO. FTW 333. Project descri ption: Replace substation and upgrade power capacity and distribution. Work will consist of adding and replacing transformers, modernizing and replacing all switchgear and protective devices, modernizing generator control system to incorporate current sta te-of-art controls and monitoring, and installing standby generation to provide the CHPP with a 'black-start' capability. Upgrade the Fort Wainwright power distribution and breaker system by adding looping capability and replacing selected distribution fee ders. The power distribution system consists of poles, fixtures, guys/anchors, overhead and underground conductors, street lighting (poles, circuits, and fixtures); transformers, and the distribution switchgear in the CHPP. The critical electric equipment of the CHPP system consists of the generator switchgear, generator controls, and the substation tie with the local utility. The DRAFT solicitation is posted at the FEDTEDS website, https://www.fedteds.gov/fedteds/start.nsf/frm.vendorlogin?openform?&SolicitationNumber=W911KB-07-R-0005. Please note this is only a working DRAFT. The actual solicitation, when released, may differ significantly from this document. This draft is released to provide industry an opportunity to comment on the agencys requirement before the final solicitation is released. Please send your comments to Kevin Maloy at contact@example.gov no later than close of business May 01, 2007. All industry submissions will be reviewed. Suggestions may or may not be incorporated into the final solicitation, depending on what is in the best interest of the Government. Issuance of this draft solicita tion does not obligate the Government to a contract award nor is the Government liable for any costs incurred in responding to this draft solicitation. POC Email you questions/comments to U.S. Army Corps of Engineers, Alaska at contact@example.gov

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 12 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 18 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 236220
New
Federal
(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities
Solicitation # W911KB27RWP12
The U.S. Army Corps of Engineers, Alaska District, is conducting a Request for Information to gather market intelligence for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station on Shemya Island, Alaska. The project aims to replace outdated and non-compliant systems across approximately 45 buildings to meet current life-safety requirements, specifically targeting a wireless or hybrid wireless architecture to reduce the need for expensive buried fiber optic infrastructure. The scope includes the demolition of existing panels and wiring, the installation of new addressable systems with RF coverage analysis, and the implementation of specialty detection for hazardous fuel system locations. The system must be ruggedized for sub-arctic maritime conditions and must operate without interfering with high-power military radar and telemetric systems. The estimated acquisition magnitude is between $27 million and $33 million, with a planned period of performance spanning fiscal years 2027 through 2030. The government anticipates utilizing a Progressive Design-Build delivery method via Other Transaction Authority (OTA) under 10 U.S.C. section 2808a, though it is also considering FAR-based alternatives. The project will be executed in two phases: an initial collaborative design and pre-construction phase to refine requirements and costs, followed by a final design and construction phase based on a Guaranteed Maximum Price or Firm-Fixed-Price agreement. This effort involves working within secure and classified buildings and requires a phased execution strategy to manage remote-island logistics. Responses to the market research questionnaire are due by November 16, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 18 days
View Details
NAICS: 237990
Federal
Lowell Creek Tunnel Repairs, Seward, Alaska
Solicitation # W911KB27BA005
The Department of Defense, through the Alaska District of the U.S. Army Corps of Engineers, is issuing a presolicitation notice for the Lowell Creek Tunnel Repairs in Seward, Alaska. This project involves repairing worn areas and installing new center rails within a 2,100-foot, horseshoe-shaped tunnel that diverts Lowell Creek through Bear Mountain into Resurrection Bay. The scope of work includes structural repairs to the intake transmission tunnel and outlet, the construction of a concrete channel, and the use of abrasion-resistant concrete featuring silica fume and fly ash or slag for alkali-silica reactivity mitigation. The contractor will be responsible for providing all labor, equipment, materials, and supervision, including managing tunnel dewatering and winter construction challenges and implementing a temporary flood management plan. The project will be awarded as a firm-fixed-price contract under NAICS code 237990, with an estimated construction magnitude between 10 million and 25 million dollars. The solicitation is expected to be available via SAM.gov on or after November 3, 2026, with an anticipated award date in December 2026. The period of performance is estimated at 1,000 calendar days. Bids will be accepted electronically through the PIEE Solicitation Module under solicitation number W911KB27BA005. All offerors must be registered in SAM.gov, and the contract will adhere to Construction Wage Rates.
Other Heavy and Civil Engineering Construction

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska
Solicitation # W911KB27RA002
The Alaska District of the U.S. Army Corps of Engineers is conducting market research to determine an acquisition strategy for the maintenance dredging of Anchorage Harbor, Alaska, anticipated for the years 2027 through 2029. This sources sought notice is informational only and not a solicitation for proposals. The project involves annual dredging of approximately 900,000 cubic yards of fine-grained material, with an option to dredge an additional 350,000 cubic yards of sandy material from the Cook Inlet Navigation Channel. The work includes surveying, dredging using hopper or mechanical dredges (no cutterhead, suction, or pipeline dredges allowed), and disposal of dredged material, ensuring continued access to shipping terminals at the Port of Alaska. The contract is expected to be firm-fixed price with an estimated total value between $25 million and $100 million, applying construction wage determinations. The anticipated award date is January 2027, and options for maintenance in 2028 and 2029 will be included. Interested contractors must be registered in the System for Award Management (SAM) and demonstrate experience and capability in similar dredging projects. The government requires 100% performance and payment bonds. Large firms must comply with subcontracting plan requirements. Firms are invited to submit capability packages by May 19, 2026, including company details, business size and classification, bonding capacity, and relevant project experience, along with their intent to propose and the equipment they plan to use. This effort seeks qualified prime contractors capable of meeting the project’s scope and regulatory requirements, with all submissions to be sent to the Alaska District’s designated contacts via email.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS