Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs, in Pascagoula, Mississippi

Active
1305M4-26-R-0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Commerce, through the National Oceanic and Atmospheric Administration, is seeking a qualified small business for a design-build project to repair and renovate the Gulf Marine Service Facility and its associated wharf in Pascagoula, Mississippi. With a budget of approximately 12.75 million dollars and an estimated performance period of 730 calendar days, this firm-fixed-price contract focuses on restoring the facility to full operational capacity following damage from hurricanes and corrosive environments. The scope of work includes the evaluation and repair of the wharf and seawall, upgrading mooring structures to withstand heavy weather events, implementing corrosion protection, and improving utility infrastructure, including electrical deficiencies and emergency generator ports. A specific challenge involves coordinating with the City of Pascagoula to address a failing seawall beneath a critical mooring bollard. The procurement process follows a two-phase design-build selection procedure under a Total Small Business Set-Aside, utilizing NAICS code 237990. Phase I evaluates offerors based on demonstrated prior experience and key personnel qualifications, including the Project Manager, Design Manager, Superintendent, and Site Safety and Health Officer. A down-select will move the highest-technically rated firms to Phase II, where the technical and management approach—specifically hurricane resiliency and risk mitigation—will be evaluated. The final award will be based on a best-value approach, prioritizing the highest technical rating provided the price is fair, reasonable, and within budgetary constraints. Unsuccessful Phase II offerors who meet specific confidence ratings may be eligible for stipends to offset their proposal costs.

General Info

Design-build repair of hurricane-damaged marine facilities in Pascagoula, $12.75M, 730-day deadline, small business set-aside.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Pascagoula, MS, 39567, USA

Set-Aside

SBA

Documents

2

Pre-Solicitation Notice 1305M4-26-R-0034 for GMSF Repair and Renovation

PDF, High priority: read this firstpresolicitation
High

Request+for+Proposals+%28RFP%29+No.+1305M4-26-R-0034%2C+Pascagoula+Design-Build+Wharf+Repairs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Sources Sought

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts2 people available
OfficeSILVER SPRING, MD, 20910, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressSILVER SPRING, MD, 20910, USA

Full Description

Show more

Project Title: Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs, in Pascagoula, Mississippi


Location: 151 Watts Ave, 


Pascagoula, MS 39567



Classification and General Information:


This requirement will be issued as a Total Small Business Set-Aside.


The North American Industry Classification System (NAICS) code associated with this procurement is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Administration standard of $45.0 million dollars in annual receipts averaged over a business’s latest three (3) complete fiscal years or (except in the Business Loan, Disaster Loan Programs, Surety Bond Guarantee, and SBIC Programs) five (5) complete fiscal years to determine the average annual receipts. If a business hasn’t been in business for five (5) years, multiply its average weekly revenue by 52 to determine its average annual receipts.



This requirement will be a Total Small Business Set-Aside, and the contractor shall be selected using Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 36.101-2 Use of Two-Phase Design-Build Selection Procedures and RFO Part 15.1 Presolicitation and Solicitation procedures. This procurement will be competitive, utilizing the Highest-Technically Rated with a Fair and Reasonable Process approach based on the solicitations’s stated budgetary constraints (affordability) under the Best Value (RFO Part 15.103). The approach prioritizes the best possible performance, provided the price is determined to be fair and reasonable and within the guidelines of the Government’s stated budget. During each phase, all proposals are initially evaluated based solely on the non-price factors specified in the solicitation. Only the price of the highest-ranked technical proposal is then evaluated to ensure it is fair, reasonable and does not exceed our stated budget. All evaluation factors other than cost or price, when combined, are significantly more important than cost or price. This requirement will result in a Firm-Fixed-Price contract for design and construction services.



Background Overview:


The GMSF is a critical NOAA asset located in Pascagoula, Mississippi, and is a shared-use site for both the National Marine Fisheries Service (NMFS) and the Office of Marine and Aviation Operations (OMAO). The facility consists of a berthing wharf and pier, seawall, and upland warehouse buildings essential for supporting NOAA's mission in the Gulf of America Region.


See Figure 1 for the GMSF site plan (See Attachment).


The facility has sustained damage from recent hurricane and storm events, primarily affecting the wharf structure. Additionally, the steel sheet pile wall has sustained damage from exposure to the Pascagoula River, resulting in section loss of the sheets and subsequent loss of fill material behind the seawall. This loss of material has resulted in sink holes in the wharf operational area.


The existing wharf and pier is approximately 540 feet long and 26 feet wide, and was constructed in three sections (referred to as the North, Middle and South sections). The wharf structure is integral with a steel sheet pile seawall. Each wharf section has been repaired in some form over the past several decades, primarily to address the failing seawall. A portion of the wharf overhangs the Pascagoula River.


See Figure 2 for a typical section through the wharf (See Attachment).


As-built drawings for each section of wharf are available and will be provided with the formally issued solicitation documents.


NOAA’s ships homeported at GMSF are operated by two separate line offices - NMFS and OMAO. Mooring configurations at GMSF vary based on the operations of each line office.


Refer to Table 1 (See Attachment) for information regarding the size of the NOAA ships homeported at GMSF, and to Figure 3 (See Attachment) for example mooring arrangements.



Project Description - Generally described as follows but not limited to:


This project is a direct response to the damages sustained from storm events and exposure to corrosive environments, and is intended to restore the facility to its full operational capacity. The project's primary focus will be the evaluation and repair of the wharf, seawall, mooring structures, and utilities.


In addition to repairs, this project will include upgrades to the wharf’s structural and electrical infrastructure, with a specific focus on hardening against future storm events.


The project will also require an assessment of the operational efficiency of the wharf working area, and potential relocation of components (i.e. light poles, etc) to improve efficiency and safety. 


Key elements expected to be addressed include, but are not limited to:


  • Restore the integrity of the deteriorating seawall and mooring structures.
  • Evaluate and renovate the existing wharf sections to allow for NOAA ships to be moored securely during hurricane conditions.
  • Potential addition of in-water mooring structures or dolphins.
  • Corrosion protection of the wharf and pier to protect from long-term corrosive environments.
  • Upgrades of necessary utility infrastructure for ship connections, with specific attention to electrical deficiencies.
  • Assessment of operational areas of the wharf and making revisions to correct any safety and efficiency issues.
  • Site utility upgrades, to include addition of emergency generator ports for the upland warehouses and routing of power to existing parking lot. 


Unique Challenges


Heavy Weather Mooring


The project must accommodate a critical NOAA operational constraint: NOAA vessels remain moored during severe wind (hurricane) and wave events. The contractor shall ensure the wharf design capacity fully supports the maximum mooring line loads anticipated during these storm events.


NOAA will provide a coastal and mooring analysis with the formally issued solicitation to provide initial definition of the ship loading on the wharf. The DB contractor should anticipate the need to validate this analysis and further refine it during the design phase.


South Mooring Bollard


NOAA utilizes a mooring bollard at the south end of GMSF that sits upon a seawall that is not maintained by NOAA. The seawall, which is owned and maintained by the City of Pascagoula, appears to be failing beneath the mooring bollard. It should be anticipated that close coordination with the City will be required to address this bollard. 


Refer to Figure 1 (See Attachment) for location of the South Mooring Bollard, and to Figure 4 (See Attachment) showing the current condition of the bollard and seawall.


On this item in particular, NOAA is looking for innovative solutions from the DB team. Potential solutions include, but are not limited to, repair or reinforcement of the existing seawall to continue supporting this bollard, or relocating the bollard to a new in-water mooring structure.



Site Visit Information:


There is no site visit planned as part of Phase I. Offerors will have the opportunity to visit the site before submission of their technical and price proposals as part of Phase II. The site visit details, to be held at the GMSF & Wharf, will be outlined in the Phase II solicitation package. Currently the site visit is projected to be held on or about January 12, 2027. If applicable, all required site access information as outlined in Section J of the Phase II RFP must be submitted in accordance with the solicitation requirements for site visit entry.



Proposed Evaluation Factors (Phases I & II), Firm Down-Select and Phase II Stipends: 


Proposed Phase I Evaluation Factors (descending order of importance):


  1. Factor 1: Demonstrated Prior Experience
    1. Element 1A: General Contractor Technical Experience
    2. Element 1B: Lead/Designer/A-E Firm Technical Experience
  2. Factor 2: Key Personnel Qualifications & Organizational Chart
    1. Element 2A: Project Manager, Design Manager, Superintendent and Site Safety and Health Officer (SSHO)
    2. Element 2B: Team Organization Quality Control and Safety

Proposed Phase II Evaluation Factor:


  1. Factor 3: Technical and Management Approach
    1. Element 3A: Hurricane Resiliency and Mooring Design Concepts
    2. Element 3B: Design and Construction Schedule
    3. Element 3C: Risk Mitigation and Stakeholder Management (e.g. City of Pascagoula)

During Phase I, the Government intends to evaluate the Offeror’s demonstrated prior experience and key personnel qualifications & organizational chart to ensure that it meets the criteria established in the solicitation. RFO Part 36.101-2(c) will be adhered to when establishing the firm down-select from Phase I to Phase II (the maximum number of Offerors will be stated in the final solicitation), where by the highest-technically rated Offerors that provides a commitment to our stated budgetary constraints (affordability) will be selected to advance to Phase II of the solicitation process.


During Phase II, stipends will be provided exclusively to unsuccessful Offerors from this phase. The final solicitation will specify the stipend amount, which is intended to offset the costs associated with completing tasks outlined in Phase II. Eligibility for stipends is restricted to Offerors who submit compliant and responsive proposals, are evaluated within Phase II, and achieve a minimum rating of "Some Confidence" during the evaluation process for this Phase.



Project Period of Performance and Magnitude:


This project shall be performed by an experienced Design-Builder that has performed similar work. The estimated performance period is 730 calendar days (24 months) from issuance of Notice to Proceed. The budget for this project is approximately $12.75 million.



System for Award Management (SAM):


All contractors interested in this project and doing business with the Federal Government must be registered with the System for Award Management (SAM): https://www.sam.gov



Issuance of Solicitation with Requirements Information:


The solicitation will be available electronically at the SAM website: www.sam.gov. No paper copies, faxes, or emails will be available. Please register as an interested source to be notified of amendments, clarifications, or other changes. Entities (even those registered as a source) are responsible for checking the SAM.gov website frequently to ensure they have all available information. NOAA anticipates abiding by the projected schedule below:



Projected Milestone Schedule (See Attachment)

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 561210
New
Federal
Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services
Solicitation # 1332KP26R0041
Solicitation 1332KP26R0041 is a request for proposal for operations and maintenance services at the Fairbanks Command and Data Acquisition Station in Alaska, a National Critical Asset that requires 24x7x365 operational continuity. The scope of work includes satellite operations, facility maintenance, IT, security guard services, and property logistics. This performance-based service contract is set aside 100 percent for small business concerns. The period of performance consists of a base year from June 1, 2027, through May 31, 2028, with four optional extension periods extending through May 31, 2032. The government will utilize a best value tradeoff process to evaluate proposals based on technical approach, past performance, and price, with non-price factors combined being approximately equal in importance to price. Eligible offerors must hold an active facility clearance with the Defense Counterintelligence and Security Agency. The contract incorporates various firm-fixed-price and time-and-materials line items, with a total estimated procurement value of 1,525,000 dollars. Proposals are due by 2:00 PM ET on November 9, 2026, and must comply with specific labor standards, including the Fairbanks Joint Craft Council and Teamsters Local 959 Collective Bargaining Agreements.
Facilities Support Services

POSTED

about 16 hours ago

DEADLINE

in 23 days
View Details
NAICS: 336611
New
Federal
SONAR GONDOLA DETAILED DESIGN AND FABRICATION
Solicitation # REQUIREMENTS-27-0299
The Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), is conducting market research via a sources sought notice to identify potential providers for the detailed design, fabrication, and engineering of a sonar gondola for the NOAA Ship NANCY FOSTER (R-352). This project, categorized under NAICS 336611, requires the contractor to perform ship checks, conduct preliminary and final design reviews, and fabricate the gondola using ABS certified welders. Key deliverables include installation and modification drawings, a weight report, and an updated ship GHS model. The design must adhere to all applicable Marine Vessel ABS construction standards and NOAA Standard Specification 0000.0. The project timeline includes a preliminary design review approximately 45 days after award and a final design review 60 days after award, with all deliverables due by March 15, 2027. The target completion date for the fabricated gondola is October 10, 2027, with installation planned for the ship's dry docking in Q1 FY28. The completed gondola must be crated and painted using specified Sherwin Williams systems for both interior and exterior surfaces. Interested respondents must submit a capability statement of no more than three pages, including their UEI number and business type, by November 9, 2026.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS