This Solicitation opportunity from District of Columbia was posted on October 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The District of Columbia Department of General Services is seeking design-build services for the modernization of Hendley Elementary School, located at 425 Chesapeake Street SE, Washington, DC. The project is divided into a design and preconstruction phase followed by a construction phase, with a substantial completion target of July 15, 2030. The scope involves addressing site and traffic safety concerns, providing a fully accessible school entrance, and creating separate parking and loading areas to eliminate pedestrian conflicts. While the Department anticipates the demolition of a two-story classroom volume and its single-story connector, the Design-Builder is tasked with recommending the most advantageous design. The project must adhere to strict educational specifications, DGS building systems standards, and sustainability goals, including net zero energy reporting and specific waste and recycling guidelines.
The procurement process, under solicitation DCAM-26-CS-RFP-0011, utilizes a scoring system of up to 112 points, heavily weighting the project management plan and schedule. Award criteria emphasize past performance, key personnel availability, and Certified Business Enterprise preference. The contract mandates strict compliance with the Davis-Bacon Act, the DC Living Wage Act, and First Source employment agreements. Technical requirements include adherence to ADA accessibility standards, DGS configuration management policies for IT infrastructure, and comprehensive quality assurance for waterproofing and finish carpentry. The selected contractor must provide full performance and payment bonds and is subject to a $25,000 fee for the replacement of designated key personnel.
General Info
Design-build services for Hendley Elementary School modernization in DC, completing by July 2030.
PDF, High priority: read this first12 pages · wage-determination
HighAI Summary for 29 CFR 5.5 Davis-Bacon Contract Provisions: Excerpt from 29 CFR 5.5, current as of 8/10/2026, containing Davis-Bacon and related labor standards contract provisions for federally financed or assisted construction. It describes required contract clauses, minimum wage and fringe benefit payment rules, wage determinations, worker classification requirements, and conformance procedures. The document includes key compliance obligations and references to posting and payroll requirements.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Asbestos Management Plan and Inspection Report: Asbestos Management Plan and Asbestos Inspection Report for Hendley Elementary School (School No. 249), prepared for DC Public Schools and updated by the District of Columbia Department of General Services. The document includes background on AHERA asbestos inspections, management planner information, designated person details, executive summary, and a table of asbestos-containing building materials with quantities and asbestos status. Dated August 2000 with a DGS transmittal letter dated February 9, 2017.
PDF
PDF, High priority: read this first7 pages · sow
HighAI Summary for Concept, Schematic & Design Development Milestone Requirements: Milestone requirements document for Concept Design, Schematic Design, and Design Development phases, referenced in Section 2. It lists required deliverables for the Design-Builder, including concept and schematic design checklists, site and floor plans, renderings, zoning analysis, code analysis, cost estimates, value engineering, net zero energy report, quality control plan, and agency review/approval coordination. The file appears to be an attachment labeled A1 and includes detailed design submission requirements and consultant narrative expectations.
PDF
PDF, High priority: read this first14 pages · wage-determination
HighAI Summary for Davis-Bacon Wage Determination DC20260002: SAM.gov wage determination for Davis-Bacon Act WD # DC20260002, modification 3, last revised May 18, 2026. Covers construction building work in the District of Columbia (Washington, D.C.) and lists prevailing wage classifications/rates and related labor provisions, including holidays and notes referencing applicable federal labor requirements.
PDF
PDF, High priority: read this first5 pages · sow
HighAI Summary for DCPS Operations & Maintenance Manual Requirements: DCPS Operations & Maintenance Manual requirements for design-build teams. It defines mandatory content, organization, deliverables, formatting, version control, and timeline for a searchable PDF and printed binder. The manual covers school operations topics including sustainability/net zero, doors and security, PA systems, mechanical, lighting/electrical, plumbing, technology, monument sign, cleaning/specialty care, kitchen equipment, and exterior landscape/garden. It also specifies instructions, diagrams, manuals, floor plans, safety guidance, and work-order reporting procedures.
PDF
PDF, High priority: read this first127 pages · contract-document
HighAI Summary for Design-Build Agreement for Hendley ES Modernization: Design-build agreement for the Hendley Elementary School Modernization project under DCAM-26-CS-RFP-0011, between the District of Columbia Department of General Services and the contractor. Includes project information, contract structure, budget and allowance details, milestone dates, liquidated damages, and terms describing design, preconstruction, and construction services. Dated to reference an RFP issued in 2026 and a project substantial completion date of July 15, 2030.
PDF
PDF, High priority: read this first80 pages · specifications
HighAI Summary for DGS Building Systems Standards Manual 2026: Revision 1 (October 19, 2026) of the District of Columbia Department of General Services (DGS) Building Systems Standards Manual. This document establishes the Owner's Requirements, Design Standards, and Operational Requirements for Mechanical, Electrical, Plumbing, and Enterprise Building Automation systems. It applies to new construction, modernization, and various project delivery methods (Design-Build, CMAR, etc.), with a focus on building electrification, indoor air quality, and sustainability.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for DGS Configuration Management Policy IT-CM-001.0: Effective July 7, 2026, this policy from the DC Department of General Services (DGS) establishes mandatory baseline configuration and system hardening requirements for all vendor-provided networking and infrastructure devices. It mandates alignment with CIS Benchmarks, prohibits default configurations, and requires vendors to provide compliance documentation and certification of vulnerability-free configurations prior to connection to District networks.
PDF
PDF, High priority: read this first238 pages · specifications
HighAI Summary for DGS Standard Specifications - Section 06 2000 Finish Carpentry: Technical specifications for Finish Carpentry (Section 06 2000) dated August 3, 2026. The document details requirements for cabinets, solid surfacing, shelving, and trim, including material standards (AWI, NEMA), submittal requirements, quality assurance, and specific hardware requirements for hinges and drawer slides.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for DGS Supplemental Design Guidelines: This document provides supplemental design guidelines and technical specifications for procurement projects. It includes detailed requirements for materials, installation standards, and quality control, specifically addressing items such as flooring, wall coverings, and architectural finishes. The document outlines compliance standards and specific technical criteria that must be met during the design and implementation phases.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for DGS Supplemental Design Guidelines (Version 2023.12.21): Supplemental Design Guidelines for the District of Columbia Department of General Services (DGS) Capital Construction Services, version 2023.12.21. This document provides technical specifications and owner's project requirements across multiple disciplines, including mechanical systems, electronic lockdown hardware, doors/frames, security, athletic equipment, and fire alarm systems. It also defines minimum warranty requirements for various equipment and specifies requirements for emergency evacuation maps and standby generators.
PDF
PDF, High priority: read this first5 pages · eeo-policy-commitment
HighAI Summary for EEO Policy Statement and Employer Information Report: Revised 10.18.2024 District of Columbia EEO compliance package. Includes a notice of compliance with Mayor’s Order 85-85 and the D.C. Human Rights Act, an equal employment opportunity policy commitment requiring non-discrimination, affirmative action, subcontract flow-downs, and access to records, plus an employer information report with filing instructions and company identification fields.
PDF
PDF, High priority: read this first344 pages · specifications
HighAI Summary for Elementary School Prototype Program – Educational Specifications: Educational specifications document for a District of Columbia Public Schools elementary school prototype program, dated September 2021. It provides the space program and table of contents for academic core, library, visual arts/performing arts, PE, administrative spaces, health services, student dining, and building services. The document includes room names, adjacency diagrams, and capacity-based square footage/quantity assumptions for 325, 400, 500, and 700 student models, with notes about optional and site-specific spaces.
PDF
PDF, High priority: read this first19 pages · agreement
HighAI Summary for First Source Employment Agreement for Hendley ES Modernization: District of Columbia First Source Employment Agreement for the construction project "Design-Build Services for Hendley ES Modernization" (revised February 15, 2018). It captures government-assisted project and employer information, contract/solicitation number DCAM-26-CS-RFP-0011, and workforce participation requirements. The agreement states First Source hiring obligations and, for projects valued at $5 million or more, the required DC resident hour percentages for journey workers, apprentices, skilled laborers, and common laborers.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Hendley Elementary School Educational Specifications: Updated July 2026 educational specifications for Hendley Elementary School, 425 Chesapeake St SE, Washington, DC. The document outlines projected enrollment, school type, staffing, building capacity, and a detailed room-by-room space program with quantities and square foot targets across academic, library, arts, performing arts, PE, admin, health, dining, and building services areas. It also includes subtotal calculations and total building square footage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Hendley Elementary School - Existing Drawings 2013 Modernization: Construction set issued May 2013 for the modernization of Hendley Elementary School in Washington, DC. The document provides material lists, symbol legends, general construction notes, and a detailed project description of the existing three-wing structure, including structural elements, applicable 2006 building codes, and fire protection systems.
PDF
PDF, High priority: read this first6 pages · contract-document
HighAI Summary for Letter Contract / Notice to Proceed for Hendley ES Modernization: Letter Contract and Notice to Proceed for Design-Build Services under RFP No. DCAM-26-CS-RFP-0011 for Hendley Elementary School Modernization. The document indicates award to the contractor and sets interim contract terms, scope of work, deliverables, not-to-exceed amount, compensation framework, insurance, duration, billing, key personnel, and project management software requirements. It references supporting RFP provisions and exhibits, and it is effective upon execution by the contractor and Department.
PDF
PDF, High priority: read this first3 pages · wage-determination
HighAI Summary for Living Wage Act Fact Sheet: District of Columbia Living Wage Act of 2006 fact sheet/notice with effective dates and current wage rates for 2026. Explains applicability to contracts and government assistance over specified thresholds, subcontractor coverage, employee definition, exemptions, recordkeeping, posting obligations, and claim contact information. Includes living wage rates of $17.95 effective Jan. 1, 2026 through June 30, 2026, and $18.40 effective July 1, 2026.
PDF
PDF, High priority: read this first85 pages · rfp
HighAI Summary for RFP for Hendley Elementary School Modernization: Request for Proposals (RFP) DCAM-26-CS-RFP-0011, issued September 28, 2026, by the District of Columbia Department of General Services for design-build services for the Hendley Elementary School modernization. The document includes project background, procurement overview, site and educational specification references, anticipated meetings, public art allowance, submission dates, and a table of contents covering instructions, requirements, evaluation criteria, insurance, bonds, protests, and attachments.
PDF
PDF, High priority: read this first3 pages · rfp
HighAI Summary for RFP Proposal Form for Hendley Elementary School Modernization: Offeror submission form responding to District of Columbia Department of General Services RFP DCAM26 CS-RFP0011 for design-build services for the Hendley Elementary School Modernization project. The document includes the proposal certification language, pricing structure, required allowances, bid bond/insurance references, hold-open period, award acceptance terms, and compliance acknowledgments. It reflects the offeror’s completed response to the solicitation and incorporates key pricing and responsiveness conditions.
PDF
PDF, High priority: read this first8 pages · sow
HighAI Summary for SBE Subcontracting Plan FAQs & Checklist: Revised October 2023 SBE Subcontracting Plan instructions, FAQs, and checklist for government-assisted construction and non-construction projects over $250,000. It explains when an SBE subcontracting plan is required, the 35% subcontracting requirement, use of CBE if SBEs are unavailable, waiver considerations, submission requirements for agency and public-private projects, and credit rules for executed subcontracts.
PDF
PDF, High priority: read this first11 pages · supporting-documents
HighAI Summary for SBE Subcontracting Plan FAQs & Checklist: This document provides guidance, FAQs, and a checklist from the Department of Small and Local Business Development (DSLBD) regarding the submission and requirements of Small Business Enterprise (SBE) Subcontracting Plans. It outlines who must submit a plan, submission timelines, subcontracting value bases, and specific percentage requirements for CBE beneficiaries. It also addresses the process for requesting waivers and the impact of legal advice from the Office of the Attorney General regarding the life of the contract.
PDF
PDF, High priority: read this first24 pages · contract-document
HighAI Summary for Standard Contract Provisions for Construction: District of Columbia Department of General Services Standard Contract Provisions for a construction contract. This document sets out general contract definitions, specification and drawing hierarchy, change order procedures, equitable adjustment requirements, notice deadlines, and cost breakdown rules for change-order work. It appears to be a foundational attachment to the contract and includes binding provisions governing performance and modifications.
PDF
PDF, High priority: read this first10 pages · guidelines
HighAI Summary for Waste and Recycling Design Guidelines for DCPS Modernizations: Waste and recycling design guidelines for DCPS modernizations issued by the D.C. Department of General Services, Sustainability + Energy Division. The document provides recommendations for disposal streams, container types and sizes by student enrollment, dumpster pad and loading dock design considerations, dumpster enclosure requirements, compactor selection, color-coding, and operational planning factors such as flow, accessibility, safety, overhead clearance, and illegal dumping prevention. It includes examples from schools and references specific compactor models and setup considerations.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Waterproofing Systems QA-QC Manual: Waterproofing Systems QA-QC Manual for DGS-DCPS Modernization Projects, prepared for the Department of General Services. This document outlines quality assurance and quality control requirements for waterproofing systems across design and construction phases, including objectives, focus areas, environmental factors, substrate preparation, installation/testing/inspections, protection, and appendices with phase checklists. It functions as a project-specific technical manual guiding contractors and design teams on QA/QC procedures and critical implementation details.
PDF
PDF, Medium priority27 pages · manual
MediumAI Summary for Turnover Protocol Manual 2024.1: Internal DGS Turnover Protocol manual for transferring construction projects from CCS to FMD within the District of Columbia Department of General Services. Includes revision history, purpose, contacts, and step-by-step procedures across design, construction, and post-construction phases. Covers design review opportunities, kickoff and walkthroughs, commissioning and training, substantial completion, final completion documents, and checklist-related turnover forms and appendices.
PDF
PDF, Low priority58 pages · checklist
LowAI Summary for Accessibility Checklist, January 2026 Edition: District of Columbia Office of Disability Rights Accessibility Checklist, January 2026 edition, based on the 2010 ADA Standards for Accessible Design. The document is a survey tool for assessing accessibility of government buildings and other facilities, with table of contents, purpose and use guidance, and instructions for performing an accessibility survey. It includes checklist sections for parking, entrances, interior routes, toilets, retail and dining areas, signage, notes, and building/contact information.
LowAI Summary for Alternate Bid Security Certification Letter: Certification letter for offerors submitting a cashier’s check or irrevocable letter of credit as alternate bid security instead of a bid bond. It requires notarized execution and acknowledges that, if awarded, the offeror must promptly provide payment and performance bonds equal to the full contract value. It also states that failure to post those bonds may result in the Department drawing the security as liquidated damages, terminating the award or contract, and barring alternate bid security for two years. Includes signature and notary blocks.
PDF
PDF, Low priority6 pages · other
LowAI Summary for Bidder/Offeror Certification Form: Bidder/Offeror Certification Form for a procurement submission, used to collect business information, responsibility certifications, licensing details, affiliations, and signature requirements. The form references a solicitation number and includes sections on responsibility, additional required certifications, Buy American Act applicability, Walsh-Healey Act, and District of Columbia FOIA disclosures. Content provided appears incomplete and partially corrupted toward the end of Section III/IV, but the document is clearly a bidder certification attachment rather than a solicitation or award.
PDF
PDF, Low priorityother
LowAI Summary for Certification to Furnish Performance & Payment Bond: District of Columbia Department of General Services form titled "Certification to Furnish Performance & Payment Bond." The undated template certifies that the bidder will furnish required performance and payment bonds in the amount of the submitted bid or a stated maximum if awarded the contract. It includes signature, agent contact, and notarization blocks, and notes the guarantee remains valid and irrevocable for 120 days from bid submission.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Conflict of Interest Disclosure Statement: Conflict of Interest Disclosure Statement for an RFP, requiring the offeror to disclose any organizational conflicts of interest involving the offeror, team members, subconsultants, subcontractors, and related personnel. It cites 27 DCMR §§ 4705 and 4707, asks for disclosures of current, past, present, or planned relationships with the Department and individuals involved in preparing the RFP, and includes a certification, signature, title, company name, and date block.
PDF
PDF, Low priority3 pages · other
LowAI Summary for Contractor Self-Certification Form (V4 09.12.2024): Contractor self-certification form for a District of Columbia Department of General Services procurement. Version V4 dated 09.12.2024. The form collects business identity details, principal and modifier information, and requires responses regarding political contributions, District contracts, and compliance with D.C. Law 22-250 / D.C. Official Code § 1-1163.34a. Includes certification checkboxes and notarization/signature blocks.
PDF
PDF, Low priority5 pages · presolicitation
LowAI Summary for DCAM26 CS-RFP0011 Pre-Proposal Conference Attendance Sheet: Attendance sheet and business card collection form for the Pre-Proposal Conference and Site Visit regarding DB Services for Hendley ES Modernization (Solicitation No. DCAM26 CS-RFP0011), held on October 6, 2026.
PDF
PDF, Low prioritytax-affidavit
LowAI Summary for DC Tax Certification Affidavit: District of Columbia Office of Tax and Revenue Tax Certification Affidavit form. The document is used by entities seeking to enter into a contractual relationship with a D.C. agency to authorize release and verification of tax compliance information. It includes fields for organization details, principal officer, contract number, and account identifiers, along with certification, signature, and penalty language.
LowAI Summary for D.C. Tax Exemption Certificate: Government of the District of Columbia Office of Tax and Revenue Certificate of Exemption issued to the Office of Contracting and Procurement. It identifies the certificate number, effective expiration date of 24-Mar-2020, and states the organization type as an instrumentality of the Federal Government. The document explains that the certificate is non-transferable and may be used only for qualifying purchases of taxable property and services.
PDF
PDF, Low priorityother
LowAI Summary for Existing Drawings / Survey Sheets: A set of scanned existing-drawings and survey imagery with mixed legible annotations, including Chesapeake River/Bulldog references, a survey of existing conditions for Square 6207, and multiple other plan/title fragments. The content appears to be archival drawing sheets and OCR noise rather than a solicitation or contract document. No clear procurement terms, bid instructions, or award language are present.
PDF
PDF, Low priority143 pages · other
LowAI Summary for Facility Condition Assessment Report: Facility Condition Assessment report for Hendley Elementary School in Washington, DC, submitted January 9, 2018 by H. Yat Brown, LLC to the DC Department of General Services. The document summarizes a visual, non-destructive assessment of the facility, including scope of work, definitions, building system inventories, conditions, remaining useful lives, and estimated replacement costs for use in DCPS capital planning.
PDF
PDF, Low priority4 pages · other
LowAI Summary for Final Release of Liens and Claims Form: District of Columbia Department of General Services form for Release of Liens and Final Release of Liens and Claims. The document is a notarized contractor/consultant affidavit used to confirm payment, waive lien and stop-work rights, and release the District from claims related to a project. It includes fields for project name, contract number, task order number, work performed, contract date, contract amount, payment amount, and contractor signature/notary sections.
PDF
PDF, Low priority1 page · other
LowAI Summary for Hendley Elementary School Radon Laboratory Analysis Report: Laboratory analysis report dated February 20, 2023 for radon testing at Hendley Elementary School. The report lists kit numbers, room locations, test start/end times, pCi/L results, and analysis dates for multiple samples, including classroom and cafeteria locations.
PDF
PDF, Low priority18 pages · inspection-report
LowAI Summary for Lead Inspection Report for Hendley Elementary School: Environmental Health and Safety inspection report dated March 6, 2017 for Hendley Elementary School, Washington, DC, covering elevator modernization-related asbestos and lead testing. The report documents XRF lead-based paint testing, bulk asbestos sampling, laboratory analysis, and results. It states no lead-based paint hazards were identified, but several homogeneous materials tested positive for asbestos. Includes sampling methodology, references to appendices, and tabulated results for affected areas.
PDF
PDF, Low priority46 pages · guide
LowAI Summary for National BIM Guide for Owners: National Institute of Building Sciences guide titled "National BIM Guide for Owners" (dated 010317). It outlines BIM requirements, project delivery considerations, intellectual property, team roles and responsibilities, BIM execution planning, quality planning, and infrastructure/standards. The table of contents also highlights file structure, folder and file naming, component naming conventions, submittal packages, file sharing, and data transmittal requirements.
PDF
PDF, Low priority2 pages · past-performance
LowAI Summary for Past Performance Evaluation Form: Attachment L past performance evaluation form for a contractor offeror. This version includes rating categories for quality, timeliness, cost control, business relations, and customer satisfaction, along with evaluator contact information, contract details, remarks sections, and page 2 rating guidelines defining performance levels from unacceptable to excellent. It appears to be a fillable evaluation template, likely used in a solicitation or contract administration file.
PDF
PDF, Low priority4 pages · bond
LowAI Summary for Performance and Payment Bond Form: A District of Columbia construction bond form package containing both a Performance Bond and a Payment Bond. It includes fill-in fields for principal, surety, contract date/number, penal sum, signatures, corporate seals, and instructions for execution and surety authorization. Rev. July 1986 form references are shown, and the document is intended to secure contract performance and payment obligations under the construction contract.
PDF
PDF, Low priorityproposal-bond
LowAI Summary for Proposal Bond Form: District of Columbia proposal bond form for a bid guaranty in connection with construction, alteration, and repair work. The document includes fields for bond execution date, organization type, penal sum, sureties, proposal closing date, and RFP number, plus signature/corporate certificate sections and instructions for completing and executing the bond.
LowAI Summary for Roof Condition Assessment Report - Hendley Elementary School: Roof condition assessment report for Hendley Elementary School (FY24), prepared for DGS DCPEP and inspected on 08/14/2023. The document describes site information, roof sections, material inventory, condition scores, and recommended repairs with estimated costs. It includes section-by-section findings for modified bitumen roofing and a repair plan identifying defects such as boot damage, membrane deterioration, debris, sealant failures, flashing issues, vegetation, spalling, and energy-related defects.
PDF
PDF, Low priority29 pages · contract-document
LowAI Summary for Standard Contract Provisions for Architectural & Engineering Services: District of Columbia Department of General Services Standard Contract Provisions for Architectural & Engineering Services, released October 2018. The document sets general contract definitions, responsibilities, standard of care, progress reporting requirements, schedule updates, and payment conditions for architect-engineer services. It appears to be a boilerplate contract terms attachment rather than a solicitation or amendment.
Hendley ES was designed by Murphy and Locraft Architects and built in 1957. More recently, Hendley ES received a roof replacement in 2007 and a Phase 1 modernization in 2013. The original construction consists of an entrance volume flanked to the east by a two-story big box volume containing the cafeteria beneath the gymnasium and to the southwest a three-story classroom bar. At the south end of the property is an additional two-story classroom bar connected to the remainder of the school at the ground level only. The Department anticipates demolition of this two-story classroom volume and single-story connector, but the Design-Builder shall recommend a design that is most advantageous to the Project. DGS and DCPS have concerns about site safety and traffic safety on the existing site and expect the final design to resolve these concerns and provide a fully accessible and safe school entrance and a separate area for parking and loading which does not cross paths with pedestrian access. Official Notice #1: Pre-Proposal Conference & Site Walk Attendance Sheet - Hendley ES Modernization : This Notice is being issued via the OpenGov portal and is effective upon release. The Request for Proposals (RFP) remains unmodified. Item No. 1: The attendance sheet and Business Cards from the pre‑proposal conference and site walk held on October 6, 2026, at Hendley Elementary School, 425 Chesapeake Street, SE, Washington, DC 20032 , are hereby provided and attached as Exhibit A . Attachments: Preproposal_Conf_&_Site_Walk_Attendance_Sheet_&_Business_Cards.pdf Addendum #1: This Addendum No.1 is effective upon release. Except as modified hereby, the Request for Proposals ("RFP") remains unmodified. Item No. 1 The questions and answers about the RFP have been released via the OpenGov portal. Item No.2 Attachment X (DGS Standard Specifications and Owner's Project Requirements) of the RFP is hereby revised and attached herein as ( Exhibit 1 ). Item No.3 Existing Drawings 2013 Modernization is hereby attached as ( Exhibit 2 ) and incorporated to the RFP. Item No.4 RFP Section 3.5.5. b (iv) is hereby revised to read as, The individual's availability if the Offeror is selected for this proposal. if Key Personnel proposed are fully committed to active Department projects aligning with the same schedule as noted in this RFP, the Offeror will be scored a zero for this role. The Department wants to avoid overcommitted staff or understaffed project teams. Item No.5 RFP Section No. 4.3.1.3 is hereby revised to read as, a prime contractor that is certified by DSLBD as a small, local or disadvantaged business enterprise shall not be required to comply with the provisions of subsections 4.3.1.1 and 4.3.1.2 above. Item No.6 The proposal due date is hereby extended to November 6, 2026, at 2:00 P.M. Attachments: Exhibit_1_-_DGS_Standard_Specifications_and_Owner’s_Project_Requirements.pdf, Exhibit_2-_Existing_Drawings_2013_Modernization.pdf Addendum #2: This Addendum No.2 is effective upon release. Except as modified hereby, the Request for Proposals ("RFP") remains unmodified. Item No. 1 Attachment A5 (DGS Supplemental Design Guidelines) of the RFP is hereby attached as Exhibit 1 and incorporated into the RFP. Item No.2 A newly introduced attachment (DGS Building Systems Standards Manual 2026) is hereby attached as Exhibit 2 and incorporated into the RFP. Item No.3 Attachment I (SBE Subcontracting Plan) of the RFP is hereby revised and attached herein as Exhibit 3 . Attachments: Exhibit_3-SBE_Subcontracting_Plan.pdf, Exhibit_1-DGS_Supplemental_Design_Guidelines.pdf, Exhibit_2-DGS_BUILDING_SYSTEMS_STANDARDS_MANUAL_2026.pdf Addendum #3: This Addendum No.3 is effective upon release. Except as modified hereby, the Request for Proposals ("RFP") remains unmodified. Item No. 1 A new section has been added to the RFP as set forth below and is attached to this Addendum as Exhibit 1 : 2.24 Department of General Services Configuration Management Policy Compliance The Contractor shall fully comply with all mandatory baseline configuration, system hardening, and patch management requirements outlined in Policy Number IT‑CM‑0010.0, Department of General Services Configuration Management Policy (Attachment AB), which is incorporated herein by reference. This section has also been incorporated into the NTP/LC as Section 22, and into the FOC as Section 5.21.C. Attachments: Exhibit_1-_IT_Policy-Eff_07-07-26.pdf
More opportunities from District of Columbia → DCPS (C&P)