Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Distribution Pipeline Upsizing and Interconnects

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Davis involves the upsizing of water distribution pipelines, specifically replacing approximately 5,800 linear feet of 10-inch diameter pipe with 16-inch diameter pipes. The scope of work includes the installation of interconnects to a new tank using pipe fusion or jointing tools, with all activities requiring strict compliance with City of Davis water distribution standards and Stormwater Pollution Prevention Plan requirements. The project is categorized under NAICS code 237110 and is located in Davis, California. Interested parties must submit their responses by the deadline of October 5, 2026, to fulfill the delivery of the installed 16-inch pipeline infrastructure.

General Info

City of Davis subcontract for installing 5,800 feet of 16-inch water pipelines.

Agency

California → City of DavisView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Davis, CA, 95616, USA

Set-Aside

NONE

Documents

This scope was carved out of ET 8290.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fifth Street Elevated Water Tank Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Davis
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Davis
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs upsizing of water distribution pipelines for prime contractors on City of Davis water division projects. Excavates and replaces approximately 5,800 linear feet of pipeline, upsizing pipes from 10-inch to 16-inch diameter and installing interconnects to the new tank. Uses 16-inch diameter water pipes and pipe fusion or jointing tools. Complies with City of Davis water distribution standards and SWPP. Delivers 5,800 LF of installed 16-inch pipeline.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
This project involves a Firm-Fixed-Price task order issued under an 8(a) MACC IDIQ for the U.S. Immigration and Customs Enforcement at the Port Isabel Detention Center in Los Fresnos, Texas. With an estimated magnitude between 1.5 million and 2 million dollars, the scope of work focuses on critical infrastructure repairs and upgrades across several systems. Key requirements include the replacement of domestic water and sanitary sewer systems in Multipurpose Building 3 using PEX and PVC piping, the installation of energy-efficient boilers in the Admin, Processing, Medical, and Dining areas, and the replacement of the dining facility fire alarm system. Additionally, the project includes painting 11 facilities and upgrading the wastewater treatment plant by replacing worn valves, repairing aeration ditch piping, and installing sewage grinders to ensure the system is durable and coastal weather resistant. The contract has a performance period of 365 days from the date of award. Award decisions are based solely on the lowest total evaluated price, provided the offeror meets technical, safety, and quality control requirements. Contractors must provide a Project Manager with at least five years of federal contracting experience and submit a comprehensive Quality Control Plan and safety plan. All work must adhere to Davis-Bacon Act wage determinations for Cameron County, Texas, and requires performance and payment bonds. Personnel must undergo background checks for facility access, and specific installations for the fire alarm and wastewater systems require manufacturer certification. Payment is processed electronically via the Invoice Processing Platform with the requirement of certified payroll.
Bristol Alliance of Companies

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additionally, the project encompasses site improvements, flow control facility components, pavement removal and restoration, traffic control, utility coordination, and the final commissioning, disinfection, and startup of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and materials testing. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes and bids are due by September 18, 2026, at 2:00 PM PT. The project is designated for various set-asides, including Small Business, Small Disadvantaged Business, and Women-Owned Small Business entities.
Garney Pacific, Inc.

POSTED

about 18 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include the installation of six native trees and approximately 345 native plants, as well as necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. The project also encompasses limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization, cleanup, and restoration. This opportunity specifically seeks subcontractors and suppliers from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business categories including HUBZone and Veteran-Owned Small Businesses. Interested parties are encouraged to form consortiums if individual bid items are too large for a single small business to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for the solicitation include Jennifer Wilson and Jonah Leith.
Harbel, Inc.

POSTED

about 18 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 18 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California → City of Davis

Same awarding agency

NAICS: 237110
SLED
Fifth Street Elevated Water Tank Project
Solicitation # ET 8290
The City of Davis is seeking qualified design-builders for the Fifth Street Elevated Water Tank Project (CIP # ET 8290) in Davis, California, using a progressive design-build (PDB) delivery method. The project has an established budget of 18.5 million dollars and is divided into two stages: Stage 1 involves preconstruction services to reach a 60 to 70 percent design level and develop a guaranteed maximum price or lump sum proposal, while Stage 2 covers final design, construction, and post-construction tasks. The physical scope of work includes the construction of an elevated water tank, support facilities such as a control room and offices, and the upsizing of approximately 5,800 linear feet of distribution pipeline to 16-inch diameter pipes. Statements of Qualifications must be submitted by October 5, 2026, at 2:00 PM. Evaluation is based on design and construction experience, team structure, collaboration with owners, and safety records. Selected design-builders will assume all design risk and must provide payment and performance bonds equal to 100 percent of Stage 2 services. The project requires compliance with CEQA and the use of a skilled and trained workforce. Compensation is handled via monthly invoices, with a 5 percent retention for construction work performed during Stage 2. The project is managed by Brian Wiese, Senior Civil Engineer, with Melissa Marshall serving as the official Owner's Representative.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS