Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electrical Infrastructure and Backup Power Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Davis involves the installation of electrical infrastructure and backup power systems for water division projects. The scope of work includes installing electrical service panels, wiring for server and control rooms, and the implementation of backup power generators or Uninterruptible Power Supply systems using electrical switchgear. All work must be performed in accordance with the National Electrical Code and local permitting requirements to ensure the delivery of fully energized electrical services. The project is located in Davis, California, under NAICS code 238210. The solicitation was posted on August 28, 2026, with a response deadline of October 5, 2026.

General Info

Electrical infrastructure and backup power installation for City of Davis water division projects.

Agency

California → City of DavisView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Davis, CA, 95616, USA

Set-Aside

NONE

Documents

This scope was carved out of ET 8290.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fifth Street Elevated Water Tank Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Davis
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Davis
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs electrical service and backup power systems for prime contractors on City of Davis water division projects. Installs electrical service panels, wiring for the control and server rooms, and backup power generators or UPS systems. Utilizes electrical switchgear and Uninterruptible Power Supply (UPS) equipment. Adheres to National Electrical Code (NEC) and local electrical permits. Delivers fully energized electrical service with functional backup power.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Federal
Supply and Install Greenhouse Evaporative Cooling System, Stoneville, Mississippi
Solicitation # 1232SA26Q1000
Solicitation 1232SA26Q1000 is a combined synopsis and request for quotation issued by the USDA ARS for the supply and installation of an evaporative cooling system at Building 5, Greenhouse 2 in Stoneville, Mississippi. This firm-fixed price acquisition is a total small business set-aside under NAICS code 238210. The project scope requires the removal and disposal of eight existing cooling pads and four submersible pumps, followed by the installation of eight new Acme Kool-Cel evaporative cellulose cooling pads and eight Munters Aerotech Vortex side wall fans across four plant rooms. The contractor must complete the project within 90 days of the Notice to Proceed and provide a site-specific safety and accident prevention plan within seven days of the award. Award will be based on the lowest price technically acceptable criteria, where the lowest priced offer is evaluated for technical acceptability and past performance. Responsive quotations must include a detailed pricing sheet, a completed self-performance and subcontracting disclosure checklist, and specific representations and certifications. Offerors must hold their pricing firm for 90 calendar days. All submissions are due by September 15, 2026, at 1300 CT. The contract incorporates various FAR and AGAR clauses, including requirements for electronic funds transfer, limitations on subcontracting, and compliance with federal anti-discrimination laws.
USDA Ars Afm Apd

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238210
New
SLED
LED Lighting & Occupancy Sensor Upgrade @ Batavia SPC
Solicitation # 70CMSW25R00000011
The LED Lighting and Occupancy Sensor Upgrade project for the Batavia Service Processing Center involves the removal and disposal of existing fluorescent light fixtures, lamps, and ballasts, and the installation of energy-efficient LED lighting fixtures and occupancy sensors. The scope includes all necessary labor, supervision, equipment, materials, and testing, with a requirement to provide 5% attic stock. The project must be completed within 180 calendar days from the notice to proceed and must comply with the National Electrical Code, the International Building Code, the Americans with Disabilities Act, and American Correctional Association standards. Key deliverables include a Quality Control Plan within 15 days of award, a site survey within 30 days of award, and product submittals within 30 days following the site survey. Acceptance is based on 98% of all fixtures and sensors being fully operational, supported by a detailed spreadsheet verifying 100% testing of all controls. The contractor is responsible for providing a commissioning report within 10 days of testing completion, as well as as-built drawings and warranty documentation at project closeout. This contract is subject to the Davis-Bacon Act for prevailing wage rates in Genesee County, New York, and requires adherence to OSHA safety standards.
Bristol Alliance of Companies

POSTED

about 18 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is seeking a Firm-Fixed-Price task order under an 8(a) MACC IDIQ for the replacement of two emergency generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves removing two existing units and installing one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures and anchored to existing concrete slabs. The scope includes the installation of two new NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of generator load tests. The estimated magnitude of the project is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, a feasible program implementation plan, and a robust quality control and safety program. Contractors must comply with the Buy American Act and adhere to Davis-Bacon prevailing wage rates for building construction in Puerto Rico. Key administrative requirements include the submission of certified payroll with electronic invoicing via the Invoice Processing Platform, the provision of performance and payment bonds, and strict adherence to security protocols, including the signing of non-disclosure agreements and obtaining PIV cards for personnel. Work is scheduled for regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 18 hours ago

DEADLINE

in 18 days
View Details

More opportunities from California → City of Davis

Same awarding agency

NAICS: 237110
SLED
Fifth Street Elevated Water Tank Project
Solicitation # ET 8290
The City of Davis is seeking qualified design-builders for the Fifth Street Elevated Water Tank Project (CIP # ET 8290) in Davis, California, using a progressive design-build (PDB) delivery method. The project has an established budget of 18.5 million dollars and is divided into two stages: Stage 1 involves preconstruction services to reach a 60 to 70 percent design level and develop a guaranteed maximum price or lump sum proposal, while Stage 2 covers final design, construction, and post-construction tasks. The physical scope of work includes the construction of an elevated water tank, support facilities such as a control room and offices, and the upsizing of approximately 5,800 linear feet of distribution pipeline to 16-inch diameter pipes. Statements of Qualifications must be submitted by October 5, 2026, at 2:00 PM. Evaluation is based on design and construction experience, team structure, collaboration with owners, and safety records. Selected design-builders will assume all design risk and must provide payment and performance bonds equal to 100 percent of Stage 2 services. The project requires compliance with CEQA and the use of a skilled and trained workforce. Compensation is handled via monthly invoices, with a 5 percent retention for construction work performed during Stage 2. The project is managed by Brian Wiese, Senior Civil Engineer, with Melissa Marshall serving as the official Owner's Representative.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS