Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Drainage and Erosion Control Contractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Virginia Department of Energy involves the installation of drainage structures and erosion control measures for prime contractors. The scope of work includes replacing 24 inch CMP with 30 inch HDPE pipe, installing Ditch No. 1 and 2, and placing underdrains on mine bench areas. To ensure stabilization, the contractor will deploy Concrete Canvas and Rock Buttress while maintaining silt fences in accordance with the Virginia Erosion and Sediment Control Handbook. The project is located at 9447 Penhollow Road Pound and falls under NAICS code 238910. The solicitation was posted on September 14, 2026, with a response deadline of October 1, 2026. The ultimate goal of the contract is the delivery of a fully completed drainage system and active erosion control.

General Info

Subcontract for Virginia Department of Energy to install drainage and erosion control measures.

Agency

Virginia Department of EnergyView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

9447 Penhollow Road Pound, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27AML05.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pen Hollow Landslide Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
ContactsNo contacts available
OfficeN/A
Organization / Agency
Virginia Department of Energy
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage structures and erosion control for prime contractors on Commonwealth of Virginia Department of Energy projects. Replaces 24” Ø CMP with 30” Ø HDPE pipe, installs Ditch No. 1 and 2, and installs underdrains on mine bench areas. Deploys Concrete Canvas and Rock Buttress for stabilization and maintains silt fences per Virginia Erosion and Sediment Control Handbook. Delivers completed drainage system and active erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Structure, 51 Main Street, Durham - Bid Extended
Solicitation # 39005
The Town of Durham, Connecticut, is soliciting sealed bids from licensed contractors for the complete demolition and removal of a wood-framed structure and its concrete foundation at 51 Main Street. The scope of work includes installing 220 linear feet of 8-foot-high chain-link fencing, demolishing the structure and foundation walls into the existing cellar hole, removing three wooden poles from the rear parking lot, and performing final site cleanup and backfilling. Contractors must implement water-based dust suppression and comply with all OSHA and environmental regulations. The contract will be awarded to the lowest responsible and qualified bidder based on price, past performance, financial responsibility, and experience with similar projects. The final bid deadline has been extended to October 8, 2026, at 2:00 p.m. Required submission materials include a lump-sum project price, a 10 percent bid bond or cashier's check, proof of licenses and insurance, and three professional references. Upon award, the contractor must provide a Labor and Materials Payment bond and a Performance Bond, each for 100 percent of the contract price via AIA Document A312. Payment will be issued within 30 days of invoicing based on the percentage of work completed. Additional requirements include compliance with Connecticut prevailing wage laws for bids exceeding 100,000 dollars, adherence to non-discrimination and ADA standards, and the execution of a nondisclosure agreement. Final payment is contingent upon a site inspection and the submission of disposal records and air quality reports.
DAS Procurement

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237990
New
SLED
Mines Road Portal Project
Solicitation # 27AML01-2
The Mines Road Portal Project, solicitation number 27AML01-2, is a unit price contract issued by the Virginia Department of Energy for the reclamation of one priority 1 portal and one priority 1 vertical opening located at 6196 Mines Road in Pulaski County, Virginia. The scope of work includes the construction of a portal closure using VDOT gabion stone and a bat gate, the installation of HDPE piping for wet seals and bat gates, general clearing of clogged streams, revegetation, and the implementation of erosion and sediment control measures. Due to environmental restrictions, all work must be performed between August 15 and October 15. The project has a strict performance timeline, requiring work to begin within five calendar days of the contract award and reach completion within 16 calendar days. The contract will be awarded to the lowest responsive and responsible bidder, with priority given to DSBSD-certified micro or small businesses. Bidders must submit their proposals via the eVA portal by September 18, 2026, and provide necessary documentation including a small business subcontracting plan and specific performance and payment bonds. The project is subject to the Davis-Bacon Act and the Build America, Buy America Act, requiring adherence to prevailing wage rates and domestic material preferences. Invoicing is based on actual, documented costs, and mobilization costs are capped at 10 percent of the total base bid. Final acceptance is contingent upon inspection and approval by the Agency's Project Inspector.
Other Heavy and Civil Engineering Construction

POSTED

about 14 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
SLED
Pen Hollow Landslide Project
Solicitation # 27AML05
The Pen Hollow Landslide Project, solicitation number 27AML05, is an invitation for bids issued by the Virginia Department of Energy for reclamation and construction work in Wise County, Virginia. The scope of work includes landslide stabilization, the construction of drainage controls, the relocation of a water line according to Wise County Public Service Authority specifications, road upgrades for off-road trucks, the installation of road safety measures, and revegetation. The project is funded via the Virginia Emergency Mitigation grant and must be completed within 240 calendar days following the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder, with award priority given to DSBSD-certified micro or small businesses. Bidders must have attended the mandatory pre-bid conference on September 21, 2026, and submit their electronic bids via eVA.virginia.gov by October 1, 2026. Key requirements include compliance with the Davis-Bacon Act for prevailing wages, the Build America, Buy America Act for water line materials, and the provision of a bid bond for contracts exceeding 100,000 dollars. Performance and payment bonds are also required, with mobilization costs capped at 5 percent of the total bid. Contract administration is governed by the Virginia Public Procurement Act and the Virginia Prompt Payment Act. Invoicing must be based on actual documented costs rather than estimates, and final payment for underdrain work requires a final survey submittal. The contractor is responsible for ensuring all materials, specifically GCCM, are produced in ISO 9001 certified facilities and that all work is performed to the satisfaction of the Commonwealth of Virginia.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS