Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

Closed
W912WJ24B0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA

Set-Aside

NONE

Documents

10

Amendment 0001 to Solicitation W912WJ24B0011

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 - W912WJ24B0011

PDF, High priority: read this first3 pages · amendment
High

Amendment 0003 - W912WJ24B0011

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 - Scusset Borrow Site Sampling (Existing Environment)

PDF, High priority: read this firstamendment
High

Amendment 0004 - W912WJ24B0011

PDF, High priority: read this first5 pages · amendment
High

Town Neck Beach Nourishment Project - General Plan G-002

PDF, High priority: read this first1 page · specifications
High

401 Water Quality Certification - Cape Cod Canal Section 111 Shore Damage Mitigation Project

PDF, Low prioritydetermination-and-findings
Low

Abstract of Offers - W912WJ24B0011 - Beach Nourishment Project

PDF, Low priority1 page · abstract-of-offers
Low

CZM Federal Consistency Review - USACE Cape Cod Canal Section 111 Shore Damage Mitigation Project

PDF, Low priority1 page · consistency-review
Low

Amendment+0002_eelgrass_combined.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Project, located in Sandwich, Massachusetts. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take approximately 5 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.This project will require hydraulically dredging about 320,300 CY of sand within the established footprint of the nearshore Scussett Beach Borrow Area (SBBA) to a maximum elevation of -18 feet Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of approximately 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW and bottom of pipeline continuously resting on the ocean floor. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach?s required beach berm and dune profile.Under this contract the successful offeror will be required to provide the equipment (i.e., hydraulic pipeline dredge plant, booster pump(s), pipeline weights, and heavy equipment) and materials required for the removal of material from the aforementioned SBBA and for the placement of dredged materials onto Town Neck Beach including both publicly and privately owned properties. The anticipated dredging window for the project is from October 1, 2024 ? March 15, 2025. It is anticipated that a production rate (i.e. dredging and placement of dredged material) of 110,000 cubic yards per month will need to be achieved to complete the work within the designated dredging window.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS