Drilled Shaft & Concrete Foundation Contractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with the Illinois Tollway involves providing specialized excavation, drilling, and concrete foundation services for highway sign and luminary projects. The selected contractor will be responsible for drilling shafts, installing reinforcement bars, and pouring concrete, while also managing the installation of copper weld ground rods, cabling, and conduit. To ensure structural integrity and water management, the contractor must utilize IDOT CA-7 stone and heavy smooth drum rollers. All work must be performed in strict accordance with IDOT and Tollway Standard Specifications to deliver completed foundations and drilled shafts. Interested parties must submit their responses by November 20, 2026, at 4:30 PM. This project falls under NAICS code 238110 and supports prime contractors operating within the Illinois highway infrastructure network.

General Info

Illinois Tollway subcontract for excavation, drilling, and concrete foundations due November 20, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of I-25-4767.

The full solicitation package (429 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Roadway & Bridge Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois Tollway
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois Tollway
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, drilling, and pouring of concrete foundations for prime contractors on Illinois Tollway/IDOT highway sign and luminary projects. Drills shafts, installs reinforcement bars, and places concrete for foundations. Installs copper weld ground rods with associated cable and conduit. Manages water seepage using IDOT CA-7 stone and heavy smooth drum rollers. Adheres to IDOT and Tollway Standard Specifications. Delivers completed foundations and drilled shafts.

Similar Contracts

Same NAICS industry code

More opportunities from Illinois Tollway

Same awarding agency

NAICS: 541330
SLED
0, Tri-State Tollway (I-294) Interchange Improvements at Irving Park Road, Phase II Engineering Services
Solicitation # I-26-6000
The Illinois Tollway is soliciting Phase II engineering services for interchange improvements on the Tri-State Tollway (I-294) at Irving Park Road in Cook County, Illinois. The scope of work involves the preparation of engineering studies, contract drawings, specifications, and project permits. Key design elements include the construction of new ramps from Mannheim Road to I-294, a northbound flyover ramp to Mannheim Road, the widening of Mannheim Road, and traffic signal modifications at the intersection of Mannheim Road and Seymour Avenue. Additional infrastructure requirements include toll plaza and retaining wall construction, drainage system installations, roadway lighting, signing, pavement markings, and grading and landscaping. The contract also requires comprehensive technical support, including geotechnical services, barrier warrant analysis, and landscape design compliant with the Tollway’s Environmental Studies manual. The selected provider must manage utility coordination for protection or relocation and develop detailed Maintenance of Traffic plans with alternative construction staging concepts. Furthermore, the scope extends to providing Phase III support during the construction phase and handling all other miscellaneous appurtenant items. This solicitation, identified as I-26-6000, was posted on October 8, 2026, with a response deadline of October 30, 2026.
Engineering Services

POSTED

20 days ago

DEADLINE

in 2 days
View Details
NAICS: 237310
SLED
Roadway & Bridge Construction
Solicitation # I-25-4767
Contract I-25-4767 is a solicitation issued by the Illinois State Toll Highway Authority for comprehensive roadway and bridge construction on I-490 between Mile Post 0.9 and 2.8 in DuPage and Cook Counties, Illinois. The scope of work includes earthwork, grading, stockpile and haul road construction, mainline and ramp pavement construction, bridge and retaining wall construction, and the installation of drainage, erosion and sediment control, landscaping, fencing, lighting, traffic signals, and Intelligent Transportation Services infrastructure. Specific focus is placed on improvements to Ramp Z1 and the construction of bridges over that ramp. The project is scheduled to begin on or about March 22, 2027, with a required completion date of July 15, 2030. Bids must be submitted electronically via the BidBuy portal by 10:30 a.m. on November 20, 2026, and must include a bid guaranty of five percent of the total bid amount. Requirements for bidders include IDOT prequalification and registration with the Illinois Department of Human Rights. Due to the project's proximity to O'Hare International Airport, contractors must adhere to strict Chicago Department of Aviation safety standards, including specific certifications for safety representatives and severe penalties for failing to reopen runways or taxiways on time. The contract incorporates IDOT and Tollway Supplemental Specifications and requires compliance with AASHTO, AWS, and ASTM standards. Extensive geotechnical and environmental assessments have been conducted to guide soil management, particularly regarding contaminated materials and subsurface stability for foundations and retaining walls.
Highway, Street, and Bridge Construction

POSTED

26 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS