Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

0, Jane Addams Memorial Tollway (I-90), Bridge Reconstruction, Rockton Road to Rote Road, Phase II Engineering Services.

Active
I-26-5000State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Illinois Tollway is soliciting Phase II engineering services for bridge reconstruction on the Jane Addams Memorial Tollway (I-90) in Winnebago County, Illinois. The project scope covers the segment from Rockton Road to Rote Road, specifically from mile marker 2.7 to 14.5. The anticipated work includes the reconstruction of four key structures: Rockton Road, Harlem Road, Spring Creek Road, and Rote Road, all crossing over I-90. The required services are comprehensive, encompassing roadway and structural design, bridge type studies, and the preparation of type, size, and location plans. Additional responsibilities include maintenance of traffic design, utility coordination, drainage and grading design, geotechnical and environmental services, and the development of signing, pavement marking, and lighting plans. The selected provider will also be responsible for barrier warrant analysis, landscaping, soil erosion control, and providing Phase III support throughout the construction period.

General Info

Phase II engineering for four bridge reconstructions on I-90 in Winnebago County, Illinois.

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois Tollway
ContactsNo contacts available
OfficeIL
Organization / AgencyIllinois Tollway
Office AddressIL
ContactsNo contact information available

Full Description

Show more
Phase II engineering services are required for the preparation of engineering studies, contract drawings, specifications and project related permits for bridge reconstruction on the Jane Addams Memorial Tollway (I-90) from Rockton Road to Rote Road, MP 2.7 to MP 14.5, in Winnebago County, Illinois. The work generally encompasses bridge reconstruction and shall include, but not be limited to, the following items: • Roadway design • Structural design • Bridge Type Studies • Type, Size and Location (TS&L) plan preparation • Maintenance of traffic design including that associated with local roadways • Barrier warrant analysis • Utility coordination for protection and/or relocation of utilities • Drainage design for new system installation or modification of the existing drainage system • Grading and earthwork design • Landscaping and soil erosion/sedimentation control • Roadway lighting design • Signing and pavement marking design • Geotechnical services • Environmental services • Phase III support during construction The following structures are anticipated to be included in this project: • Rockton Road over I-90 • Harlem Road over I-90 • Spring Creek Road over I-90 • Rote Road over I-90

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Illinois Tollway

Same awarding agency

NAICS: 541330
SLED
0, Tri-State Tollway (I-294) Interchange Improvements at Irving Park Road, Phase II Engineering Services
Solicitation # I-26-6000
The Illinois Tollway is soliciting Phase II engineering services for interchange improvements on the Tri-State Tollway (I-294) at Irving Park Road in Cook County, Illinois. The scope of work involves the preparation of engineering studies, contract drawings, specifications, and project permits. Key design elements include the construction of new ramps from Mannheim Road to I-294, a northbound flyover ramp to Mannheim Road, the widening of Mannheim Road, and traffic signal modifications at the intersection of Mannheim Road and Seymour Avenue. Additional infrastructure requirements include toll plaza and retaining wall construction, drainage system installations, roadway lighting, signing, pavement markings, and grading and landscaping. The contract also requires comprehensive technical support, including geotechnical services, barrier warrant analysis, and landscape design compliant with the Tollway’s Environmental Studies manual. The selected provider must manage utility coordination for protection or relocation and develop detailed Maintenance of Traffic plans with alternative construction staging concepts. Furthermore, the scope extends to providing Phase III support during the construction phase and handling all other miscellaneous appurtenant items. This solicitation, identified as I-26-6000, was posted on October 8, 2026, with a response deadline of October 30, 2026.
Engineering Services

POSTED

20 days ago

DEADLINE

in 2 days
View Details
NAICS: 237310
SLED
Roadway & Bridge Construction
Solicitation # I-25-4767
Contract I-25-4767 is a solicitation issued by the Illinois State Toll Highway Authority for comprehensive roadway and bridge construction on I-490 between Mile Post 0.9 and 2.8 in DuPage and Cook Counties, Illinois. The scope of work includes earthwork, grading, stockpile and haul road construction, mainline and ramp pavement construction, bridge and retaining wall construction, and the installation of drainage, erosion and sediment control, landscaping, fencing, lighting, traffic signals, and Intelligent Transportation Services infrastructure. Specific focus is placed on improvements to Ramp Z1 and the construction of bridges over that ramp. The project is scheduled to begin on or about March 22, 2027, with a required completion date of July 15, 2030. Bids must be submitted electronically via the BidBuy portal by 10:30 a.m. on November 20, 2026, and must include a bid guaranty of five percent of the total bid amount. Requirements for bidders include IDOT prequalification and registration with the Illinois Department of Human Rights. Due to the project's proximity to O'Hare International Airport, contractors must adhere to strict Chicago Department of Aviation safety standards, including specific certifications for safety representatives and severe penalties for failing to reopen runways or taxiways on time. The contract incorporates IDOT and Tollway Supplemental Specifications and requires compliance with AASHTO, AWS, and ASTM standards. Extensive geotechnical and environmental assessments have been conducted to guide soil management, particularly regarding contaminated materials and subsurface stability for foundations and retaining walls.
Highway, Street, and Bridge Construction

POSTED

26 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS