Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from City of Bloomington was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dwan Clubhouse and Course Construction Manager at Risk (CMAR) – Request for Qualifications (RFQ)

Closed
26-50State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. Key requirements include replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades include the installation of raised flooring with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems, and upgrading lighting controls and ceiling fans. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be based on a best suited negotiate methodology, evaluating price reasonableness alongside non-cost factors such as past performance and corporate relevant experience. Offerors must provide two to four past performance questionnaires for projects valued at $1,000,000 or more completed within the last five years. Proposals are due by November 18, 2026, and must be submitted electronically to the Contracting Officer. The contractor is required to provide payment and performance bonds, and personnel must adhere to strict security and safety protocols, including background checks and registration of vehicles on the federal facility.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000, managed by NAVFAC Mid-Atlantic, is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as paving, drainage, and utility repairs. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, bid, payment, and performance bonds may be required, with bid bonds set at 20 percent of the proposal amount. The contract is subject to the Davis-Bacon Act and Buy American requirements. Contractors must adhere to strict quality control frameworks, including a three-phase control system, and provide detailed closeout documentation such as O&M manuals and a 20-year warranty on roofing labor and materials. Invoicing is to be processed monthly via Wide Area WorkFlow with required NAVFAC certifications.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope includes comprehensive site preparations, underground stormwater retention, utilities, landscaping, and parking. An additional option for the P1016 facility involves a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB certifications. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and sitework. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 23 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work encompasses architectural repairs, including drywall replacement, painting, ceiling tile and drywall ceiling repair, and flooring installation, as well as electrical repairs and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing where more stringent. The project has a total period of performance of 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit a single lump sum proposal by November 17, 2026, including a detailed cost breakdown, a project timeline, and a 90-day bid guarantee. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Required certifications include a valid Massachusetts Contractor's License, a Wage Rate Certification, and proof of insurance naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a specific 20-year manufacturer warranty required for LVP flooring.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion, including sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work requires the contractor to provide all labor, materials, and supervision to perform drywall installation, joint finishing, and painting, while managing the temporary removal and re-installation of HVAC equipment, water heaters, and furnaces. All work must be completed in a manner that ensures occupied-building protection and maintains required fire resistance and equipment clearances. The project is subject to the Davis Bacon Act, specifically wage determination OR20260100, Modification 1, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, a detailed project timeline, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value within ten days of award, as well as general liability insurance with a minimum of one million dollars per occurrence and three million dollars general aggregate. Final acceptance by CSD is contingent upon the successful testing of all restored mechanical, plumbing, electrical, and life-safety systems, the removal of debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The City of Bloomington is seeking a Construction Manager at Risk (CMAR) for solicitation 26-50 to lead the demolition and construction of a new clubhouse and the implementation of golf course upgrades at Dwan Golf Course, located at 3301 West 110th Street. The project has an approximate budget of 15 million dollars, conceptually split between 10 million dollars for the clubhouse and 5 million dollars for course improvements. The scope includes the total demolition of the existing facility and the construction of a new clubhouse featuring a pro shop, lobby, staff offices, ADA-accessible restrooms, and dining and event spaces for approximately 120 people, with capacity for 80 golf carts. Course upgrades will focus on bunker drainage, potential bunker redesigns, and tree relocation. The project emphasizes sustainability, incorporating geothermal and solar opportunities, and aims to bring the facility up to 2028 standards. The selection process consists of two stages, beginning with a Request for Qualifications (RFQ) to identify a cohort of firms based on their experience with golf facilities, CMAR delivery, and safety records. Short-listed firms will then be invited to a Request for Proposals (RFP) to determine the final Construction Manager under a Guaranteed Maximum Price (GMP) arrangement. Submissions are due by 11:00 AM on September 24, 2026, via the online Bids and Tenders system. The selected firm must comply with the City of Bloomington’s prevailing wage ordinance and adhere to a modified AIA Document A133-2019 agreement. Construction is anticipated to begin in fall 2027, with the clubhouse build expected to take eight to ten months.

General Info

City of Bloomington seeks CMAR for 15 million dollar Dwan Golf Course upgrades.

Documents

5
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCity of Bloomington
ContactsNo contacts available
OfficeMN, USA
Organization / AgencyCity of Bloomington
Office AddressMN, USA
ContactsNo contact information available

Full Description

Show more
The City of Bloomington (“City”) is seeking qualifications for construction manager at risk (“CMAR”) services for a new clubhouse at Dwan Golf Course (“Project”). The selected CMAR firm will work with the City’s Project team, comprised of City staff and stakeholders, consultants, and the City’s contracted architectural/engineering firm to construct a new golf clubhouse facility located at Dwan Golf Course at 3301 West 110th Street in the City of Bloomington. The City intends to utilize CMAR as its construction delivery process for the Project.

More opportunities from City of Bloomington

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS