Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Earthwork and Excavation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses earthwork and excavation activities for grade control structures numbered one through three, requiring precise cut and fill operations along with embankment grading to ensure proper water flow and structural stability. Heavy earthmoving equipment will be utilized to execute these tasks, demanding skilled labor and adherence to engineering specifications for accurate grading and compaction. Work is to be performed at a location with a zip code of 38851, corresponding to Houston, with all operations subject to the requirements of a subcontract under the North American Industry Classification System code 237310 for water and waste remediation construction. The solicitation was posted on July 2, 2026, with a response deadline set for July 9, 2026, at 5:00 PM, indicating a tight turnaround for interested parties to submit proposals. The contracting entity is the Department of Defense through its W07V Endist Vicksburg office, and while no specific set-aside designation is provided, the nature of the work suggests involvement from qualified subcontractors with demonstrated experience in heavy earthmoving and civil infrastructure projects. The place of performance and federal oversight imply compliance with Department of Defense standards and potentially strict environmental and safety protocols during execution.

General Info

Earthwork and excavation for grade structures 1–3 at 38851 under DoD subcontract, requiring heavy equipment and precise grading.

Agency

Department Of Defense → W07V Endist VicksburgView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Houston, MS, 38851, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Vicksburg
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W07V Endist Vicksburg
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, cut/fill operations, and embankment grading for grade control structures 1–3 using heavy earthmoving equipment.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details