El Dorado 2R Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado 2R Rehabilitation project involves the comprehensive reconstruction of a 11-mile segment of Interstate 5 in Fresno County, California, specifically from post mile 10.0 to 21.0 near Coalinga. The scope includes cold planing the existing pavement and replacing it with a multi-layered asphalt system: a 0.15-foot leveling course of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, followed by a 0.25-foot layer of standard Hot-Mix Asphalt, and topped with a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Severely damaged Portland cement concrete panels will be removed and substituted with Hot-Mix Asphalt. Additional work encompasses the installation of inside and outside shoulder rumble strips, placement of shoulder backing, and the upgrading or replacement of guardrail systems, drainage structures, dikes, roadside signs, and Traffic Management System components to ensure safety and functionality. The project is estimated to cost $45 million and is funded through the 2024 State Highway Operation and Protection Program with potential federal aid eligibility. All work must comply with Caltrans Standard Specifications and Special Provisions, including Sections 13-1, 7-1.02K, 14-7.03, and 14-11.08, which govern soil disturbance, lead-contaminated earth handling, paleontological resource protection, and aerial lead management. Environmental compliance is central to the project, requiring preconstruction surveys by qualified biologists to identify and protect special-status species such as burrowing owls, Crotch’s bumblebee, and blunt-nosed leopard lizard. All personnel must undergo environmental awareness training before site access, and staging areas must be clearly marked with stakes or flagging approved by a biologist. Immediate notification of cultural or paleontological resource discoveries is mandatory, and work stoppages may be required. The project is subject to CEQA and NEPA review processes, and final inspection and acceptance are conducted by Caltrans personnel, including the Senior Environmental Scientist, Judith Lopez, who also serves as the point of contact, alongside the Project Manager Haisam S. Soliman. The solicitation was posted on June 10, 2026, with proposals due by July 9, 2026, and construction is scheduled for the 2027/2028 fiscal year.

General Info

Reconstruct El Dorado 2R pavement with layered asphalt, replace concrete panels, add rumble strips, upgrade guardrails and drainage in Coalinga, CA.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

El Dorado Avenue and Interstate 5, Coalinga, CA, 93210

Set-Aside

NONE

Documents

(4)

El Dorado 2R Rehabilitation Environmental Summary

PDFenvironmental-summary

El Dorado 2R Rehabilitation Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

Notice of Intent to Adopt a Negative Declaration for El Dorado 2R Rehabilitation

PDFspecial-notice

El Dorado 2R Rehabilitation Project Initial Study with Proposed Negative Declaration

PDFinitial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Judith LopezSenior Environmental Scientist

Full Description

Show more
The project would cold plane the existing pavement and replace it with a leveling course consisting of 0.15 foot of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, 0.25 foot of Hot-Mix Asphalt, and a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Other project work would include installing inside and outside shoulder rumble strips and placing shoulder backing. Any severely distressed underlying Portland cement concrete panels will be replaced with Hot-Mix Asphalt. Additionally, guardrail systems, existing drainage systems, dikes, roadside signs, and Traffic Management System elements will be upgraded or replaced as needed.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details