Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

El Dorado 2R Rehabilitation

Forecast
06-0Y370State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado 2R Rehabilitation project involves the comprehensive reconstruction of a 11-mile segment of Interstate 5 in Fresno County, California, specifically from post mile 10.0 to 21.0 near Coalinga. The scope includes cold planing the existing pavement and replacing it with a multi-layered asphalt system: a 0.15-foot leveling course of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, followed by a 0.25-foot layer of standard Hot-Mix Asphalt, and topped with a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Severely damaged Portland cement concrete panels will be removed and substituted with Hot-Mix Asphalt. Additional work encompasses the installation of inside and outside shoulder rumble strips, placement of shoulder backing, and the upgrading or replacement of guardrail systems, drainage structures, dikes, roadside signs, and Traffic Management System components to ensure safety and functionality. The project is estimated to cost $45 million and is funded through the 2024 State Highway Operation and Protection Program with potential federal aid eligibility. All work must comply with Caltrans Standard Specifications and Special Provisions, including Sections 13-1, 7-1.02K, 14-7.03, and 14-11.08, which govern soil disturbance, lead-contaminated earth handling, paleontological resource protection, and aerial lead management. Environmental compliance is central to the project, requiring preconstruction surveys by qualified biologists to identify and protect special-status species such as burrowing owls, Crotch’s bumblebee, and blunt-nosed leopard lizard. All personnel must undergo environmental awareness training before site access, and staging areas must be clearly marked with stakes or flagging approved by a biologist. Immediate notification of cultural or paleontological resource discoveries is mandatory, and work stoppages may be required. The project is subject to CEQA and NEPA review processes, and final inspection and acceptance are conducted by Caltrans personnel, including the Senior Environmental Scientist, Judith Lopez, who also serves as the point of contact, alongside the Project Manager Haisam S. Soliman. The solicitation was posted on June 10, 2026, with proposals due by July 9, 2026, and construction is scheduled for the 2027/2028 fiscal year.

General Info

Reconstruct El Dorado 2R pavement with layered asphalt, replace concrete panels, add rumble strips, upgrade guardrails and drainage in Coalinga, CA.

Place of Performance

El Dorado Avenue and Interstate 5, Coalinga, CA, 93210

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Judith LopezSenior Environmental Scientist

Full Description

Show more
The project would cold plane the existing pavement and replace it with a leveling course consisting of 0.15 foot of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, 0.25 foot of Hot-Mix Asphalt, and a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Other project work would include installing inside and outside shoulder rumble strips and placing shoulder backing. Any severely distressed underlying Portland cement concrete panels will be replaced with Hot-Mix Asphalt. Additionally, guardrail systems, existing drainage systems, dikes, roadside signs, and Traffic Management System elements will be upgraded or replaced as needed.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure works. Key scopes of work include underground construction such as tunneling, boring, jacking, and micro tunneling; site preparation including land surveying, site clearing, shoring, and subgrade roadbed work; and environmental and support services including storm water pollution prevention (SWPPP), traffic control, and quality control. Required materials and services also include precast concrete, ready mix supply, cathodic protection, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for ADA Improvements at Cannonsburgh Village under solicitation number ITB-10-2027. The project scope involves establishing an accessible path from adjacent buildings to the visitors center toilets, which includes ramp modifications, hardscape improvements from the street to new accessible parking spaces, and minor interior toilet facility upgrades such as the installation of ADA grab bars and adjustments to fixtures and countertops. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Bids must be submitted via the OpenGov portal by November 19, 2026, at 8:00 PM CST. Key contractual requirements include a 5% bid security, with performance and payment bonds required for 100% of the contract sum from a Tennessee-licensed bonding company. The contractor must submit an initial construction schedule within 21 days of the award and a quality-control plan within 10 days of the Notice to Proceed. Liquidated damages for failure to achieve substantial completion are set at 500 dollars per calendar day. Bidders must provide a lump sum base bid, a 5% contingency allowance, and unit pricing for the demolition and repouring of exposed aggregate concrete sidewalk. Required submission documents include a bid bond, a contractor responsibility questionnaire, and various certifications regarding Tennessee licensing, drug-free workplaces, and international divestment acts.
Parks and Recreation

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237310
New
SLED
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Solicitation # ITB2025-172CE
The City of Palm Beach Gardens, Florida, is soliciting sealed bids for the LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes (ITB2025-172CE). Funded through the Florida Department of Transportation's Local Agency Program, the project aims to enhance pedestrian and cyclist safety by constructing five-foot bicycle lanes on both the north and south sides of Gardens Parkway between Alternate A1A and Prosperity Farms Road, as well as an eight-foot-wide sidewalk on the south side between Fairchild Gardens Avenue and Prosperity Farms Road. The estimated contract value is 4,600,000 dollars, with a required completion timeframe of 410 calendar days. The contract will be awarded to the responsive and responsible bidder offering the lowest total aggregate price. The selected contractor must provide all labor, materials, and supervision in accordance with FDOT Division 1 specifications and OSHA safety standards. Key requirements include compliance with the Davis-Bacon Act for prevailing wages, Buy America sourcing preferences for steel and iron, and ADA accessibility standards. Bidders must submit a bid bond via surety bond, certified check, or cashier's check. Administrative requirements include invoicing via AIA G702 forms and payment through electronic methods per the Florida Prompt Payment Act. Bids are due by December 18, 2026, and must be submitted through the City's eProcurement Portal.
City Engineer

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Caltrans, District 6 - Fresno/Bakersfield

Same awarding agency

NAICS: 237310
SLED
State Route 41 Capital Maintenance Project
Solicitation # 06-1E960
The State Route 41 Capital Maintenance Project, solicitation number 06-1E960, is a Caltrans District 6 initiative located in Madera County near Coarsegold, California. The project scope encompasses comprehensive pavement resurfacing to extend service life, which includes cold planing and the application of Hot Mix Asphalt and Rubberized Hot Mix Asphalt. Additionally, the project focuses on enhancing pedestrian infrastructure and safety through the construction of new sidewalks, ADA-compliant curb ramps, curb and gutter systems, and the installation of streetlights and flashing beacons to improve crosswalk visibility. Other safety and drainage improvements include replacing drainage inlets, culverts, asphalt concrete dikes, and upgrading guardrails to current standards. A critical component of the work involves utility potholing to locate underground telephone lines owned by Sierra Telephone at two specific locations: Post Mile 28.03 and Post Mile 32.05. This work will utilize compressed air and vacuum excavation to create 1 by 1 foot holes reaching depths of up to 10 feet. All activities will be performed within the Caltrans right-of-way. The project is categorized as a forecast under NAICS code 237310 and is associated with Federal-Aid Project Number 0622000123. It has been determined to be categorically exempt under CEQA Class 2(c) and NEPA 23 CFR 771.117, with environmental commitments including worker awareness training and pre-construction surveys to protect special-status species.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS