El Dorado 2R Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado 2R Rehabilitation project involves the comprehensive reconstruction of a 11-mile segment of Interstate 5 in Fresno County, California, specifically from post mile 10.0 to 21.0 near Coalinga. The scope includes cold planing the existing pavement and replacing it with a multi-layered asphalt system: a 0.15-foot leveling course of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, followed by a 0.25-foot layer of standard Hot-Mix Asphalt, and topped with a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Severely damaged Portland cement concrete panels will be removed and substituted with Hot-Mix Asphalt. Additional work encompasses the installation of inside and outside shoulder rumble strips, placement of shoulder backing, and the upgrading or replacement of guardrail systems, drainage structures, dikes, roadside signs, and Traffic Management System components to ensure safety and functionality. The project is estimated to cost $45 million and is funded through the 2024 State Highway Operation and Protection Program with potential federal aid eligibility. All work must comply with Caltrans Standard Specifications and Special Provisions, including Sections 13-1, 7-1.02K, 14-7.03, and 14-11.08, which govern soil disturbance, lead-contaminated earth handling, paleontological resource protection, and aerial lead management. Environmental compliance is central to the project, requiring preconstruction surveys by qualified biologists to identify and protect special-status species such as burrowing owls, Crotch’s bumblebee, and blunt-nosed leopard lizard. All personnel must undergo environmental awareness training before site access, and staging areas must be clearly marked with stakes or flagging approved by a biologist. Immediate notification of cultural or paleontological resource discoveries is mandatory, and work stoppages may be required. The project is subject to CEQA and NEPA review processes, and final inspection and acceptance are conducted by Caltrans personnel, including the Senior Environmental Scientist, Judith Lopez, who also serves as the point of contact, alongside the Project Manager Haisam S. Soliman. The solicitation was posted on June 10, 2026, with proposals due by July 9, 2026, and construction is scheduled for the 2027/2028 fiscal year.

General Info

Reconstruct El Dorado 2R pavement with layered asphalt, replace concrete panels, add rumble strips, upgrade guardrails and drainage in Coalinga, CA.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

El Dorado Avenue and Interstate 5, Coalinga, CA, 93210

Set-Aside

NONE

Documents

(4)

El Dorado 2R Rehabilitation Environmental Summary

PDFenvironmental-summary

El Dorado 2R Rehabilitation Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

Notice of Intent to Adopt a Negative Declaration for El Dorado 2R Rehabilitation

PDFspecial-notice

El Dorado 2R Rehabilitation Project Initial Study with Proposed Negative Declaration

PDFinitial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Judith LopezSenior Environmental Scientist

Full Description

Show more
The project would cold plane the existing pavement and replace it with a leveling course consisting of 0.15 foot of Rubberized or Geosynthetic Pavement Interlayer Hot-Mix Asphalt, 0.25 foot of Hot-Mix Asphalt, and a 0.25-foot layer of Rubberized Gap-Graded Hot-Mix Asphalt. Other project work would include installing inside and outside shoulder rumble strips and placing shoulder backing. Any severely distressed underlying Portland cement concrete panels will be replaced with Hot-Mix Asphalt. Additionally, guardrail systems, existing drainage systems, dikes, roadside signs, and Traffic Management System elements will be upgraded or replaced as needed.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS