Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Ohio was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Contractor

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, to install emergency shut-off switches in the Facility Maintenance Shop in Edinburgh, Indiana. The project requires the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, FNC guidelines, and applicable state, local, and national building codes. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Prospective bidders must have attended a mandatory site visit on November 10, 2026, and must submit a single lump sum proposal by November 20, 2026. Proposals must include a detailed cost breakdown, a timeline for substantial completion, a W9, a completed vendor questionnaire, and proof of a valid Indiana Contractor's License. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The selected contractor must provide proof of automobile liability, general liability, and workers compensation insurance, and must adhere to Davis Bacon Act wage rate decisions. Performance requirements include providing a sequenced construction schedule within 10 days of the Notice to Proceed and correcting any punch list items within 14 days of substantial completion. The contract includes a one-year workmanship guarantee and operates on Net 30 payment terms. Final payment is contingent upon the delivery of a completed SF 1413, certified payroll records, and a release of liens from all subcontractors and suppliers.
Atterbury Job Corps. – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting within the mechanical and electrical rooms of the Quentin N. Burdick Job Corps Center in Minot, North Dakota. The project requires the contractor to provide all labor, materials, and equipment to correct specific deficiencies identified in the 2026 Facility Survey, specifically Deficiency IDs 170324 and 170326. The scope includes the installation of combination LED emergency/exit light fixtures and all necessary electrical components, such as conduit, boxes, and wiring. All work must adhere to the National Electrical Code (NFPA 70) and the Life Safety Code (NFPA 101), and the contractor must comply with the Davis-Bacon Act and federal prevailing wage requirements. Proposals must be submitted on the provided bid sheet by December 4, 2026, at 4:00pm CST, and sent to Leana Leavitt. Required submission documents include a current insurance certificate, a trade license as required by the state of North Dakota, and the identification of any subcontractors. A bond is required if the proposal value exceeds $150,000. Payment terms are Net 30 following service completion verification and receipt of invoice. Final project acceptance is contingent upon the successful demonstration of equipment operation, including battery charging and emergency illumination, and the submission of certified payroll records (WH347). A project walk-through is scheduled for November 23, 2026.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing comprehensive oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure and prevent oil oxidation, provide on-site training for up to 20 agency staff members, and develop standard operating procedures. All work must adhere to strict technical and safety standards, including NETA MTS, IEEE, NFPA 70E, and ASTM D923, with infrared inspections performed by ASNT Level 1 certified technicians or higher. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion statements and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Administrative requirements include electronic invoicing via ACH and strict compliance with California Labor Code provisions for public works contractors.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE and DBE certified firms for the Eastern Municipal Water District Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted via email to Ryan Falk by 2:00 PM on November 18th, with a final deadline of November 19th. Non-certified firms are encouraged to provide information regarding lower-tier SBE or DBE participation for evaluation. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and agree to the terms of the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Strict insurance requirements are mandatory, including 1 million dollars for Auto Liability and Workers Compensation, 5 million dollars for Excess Liability, and General Liability coverage of 1 million dollars per occurrence, 2 million dollars aggregate, and 2 million dollars for completed operations. All proposers are bound by the prime contract terms and conditions, including all payment provisions.
Axia Electric

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project objective is to engage a qualified electrical contractor to inspect, test, repair, and certify the facility's emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the documentation of all fixtures within the operator's Computerized Maintenance Management System (CMMS), the establishment of an automated 30-day functional testing schedule, and the application of durable, uniquely numbered labels to each fixture for future tracking. The estimated contract value ranges between $25,000 and $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a signed attendance roster, and a detailed cost breakout on company letterhead. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and FAR 52.222-4 regarding work hours and safety standards is mandatory. First-tier subcontractors with awards exceeding $45,000 must also disclose their debarment status per FAR 52.209-6.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation (MTC), operating the Joliet Job Corps for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to replace a water-damaged 30 KVA, 480V primary, 120/208V secondary transformer at 1101 Mills Road, Joliet, Illinois. The scope of work includes coordinating electrical outages, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit and hardware per environmental regulations, and installing a new transformer on a structurally adequate elevated support assembly. Key deliverables include two operation and maintenance manuals and a one-year written guarantee for workmanship. The project is a small business set-aside opportunity under NAICS 238210, with a size standard of $19 million. Bids will be awarded based on overall best value. Contractors must provide a detailed cost breakout and a bid bond of 20% for bids exceeding $25,000, with performance and payment bonds required for the awarded contractor. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll reports. Required documentation includes the MTC Supplier Packet, SF 1413, and a Unique Entity Identifier (UEI) for FFATA reporting if the award is $40,000 or more. Proposals are due by November 25, 2026, at 3:00 pm CT.
Joliet Job Corps

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract opportunity is for an electrical contractor to provide specialized wiring and installation services for facility projects at The Ohio State University. The scope of work includes the installation of RMC, EMT, and FMC conduit, pulling copper THHN/THWN building wire, and establishing grounding and bonding systems. All work must be performed using hydraulic compression tools and exothermic-welded connectors in strict accordance with NFPA 70 and NFPA 70E standards to ensure the delivery of completed electrical rough-ins and final power connections to meters. The solicitation was posted on October 8, 2026, with a response deadline of October 30, 2026. Falling under NAICS code 238210, this contract requires the selected subcontractor to coordinate closely with prime contractors to meet the technical specifications of the university's infrastructure projects.

General Info

Electrical subcontract for wiring and installation services at The Ohio State University.

Documents

This scope was carved out of OSU-255480.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OSU-255480, JOC HHW and CHW Meter Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical wiring, conduit installation, and grounding for prime contractors on Ohio State University facility projects. Installs RMC, EMT, and FMC conduit and pulls copper THHN/THWN building wire. Installs grounding and bonding systems using exothermic-welded connectors per NFPA 70 and NFPA 70E. Uses hydraulic compression tools. Delivers completed electrical rough-in and final power connections to meters.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 541330
New
SLED
Ohio Stadium - HVAC Replacement
Solicitation # OSU-270103
The Ohio State University Athletics Department is soliciting professional services for project OSU-270103 to conduct a comprehensive study for the replacement of the HVAC, boiler, and chiller systems at Ohio Stadium. The current systems have reached the end of their useful life, and the selected consultant will be responsible for evaluating optimal equipment locations and delivering a detailed report, written narrative, and cost information. This planning phase, budgeted at 30,000 USD, is intended to transition into a full project; if approved by the Board of Trustees, the contract may be amended to include full AE design services. The period of performance for planning services is scheduled from November 26 through February 27. Qualified firms must demonstrate expertise in sports arena mechanical design, HVAC design capabilities, and familiarity with University Sustainability Standards. The selection process utilizes a weighted scoring matrix evaluating firm size, location, staff qualifications, and past performance. All consultants must utilize the e-Builder project management system and participate in the Encouraging Growth, Diversity & Equity (EDGE) Program, with a participation goal of 5% of the initial total planning fee. Submissions must be delivered as a single PDF not exceeding 25 MB by November 30, 2026, and must include the Statement of Qualifications Form F110-330 along with required EDGE documentation.
Engineering Services

POSTED

about 21 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Schumaker Complex - Nutrition Offices
Solicitation # OSU-270003
Project OSU-270003 involves the renovation of the W1210 locker room suite within the Schumaker Complex at The Ohio State University into a new office area for Nutrition Services staff. The scope includes the complete demolition of existing locker and restroom facilities, reconfiguration of HVAC, electrical, and fire alarm systems, and the installation of a new roll-up door for the W1210B storage room. The final space will feature at least three private offices with acoustic insulation and ACT ceilings to ensure a functional environment for confidential consultations. Because the project is located within an active athletics environment, the contractor must coordinate closely with building occupants to maintain safety and minimize operational disruptions. The project will be delivered via a Construction Manager (CM) at Risk contract with an estimated total project cost of 495,000 dollars, of which 337,350 dollars is allocated for construction. The selection process is a two-stage approach consisting of a qualifications-based RFQ to create a short list of at least three candidates, followed by a best-value RFP process evaluating qualifications and fees. The CM is responsible for both preconstruction services, including the development of a Guaranteed Maximum Price (GMP) and constructability reviews, and construction services using an open-book pricing method for subcontracts. Key requirements include adherence to OSU Sustainability Standards, participation in the EDGE program with a 5.0 percent goal, and the use of the e-Builder project management system for all compatible services and closeout.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS