Electrical Hook-ups and Conduit Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Department of Defense involves electrical wiring and hook-up services for new front desk and storage areas at the Buckley SFB facility in Aurora, Colorado. The scope of work includes running electrical conduits from a single power box and connecting them to existing locations to support new cabinetry and countertops. All work must be performed by licensed electricians who are compliant with local electrical codes to ensure functional power delivery at the specified locations. The opportunity is designated as a total Small Business Set Aside under NAICS code 238210. It was posted on August 18, 2026, with a response deadline of September 16, 2026. The project is managed by the FA2543 460 Cons agency.

General Info

Electrical wiring services for Buckley SFB, Colorado, small business set aside subcontract.

Agency

Department Of Defense → FA2543 460 ConsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Aurora, CO, 80011, USA

Set-Aside

SBA

Documents

This scope was carved out of FA254326Q0035.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ODR Countertop & Cabinets Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2543 460 Cons
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2543 460 Cons
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical wiring and hook-ups for the new front desk and storage area for prime contractors on NAFI Buckley SFB facility projects. Runs electrical conduits from a single power box and performs hook-ups to existing locations to support new cabinetry and countertops. Requires licensed electricians compliant with local electrical codes. Delivers functional electrical power at the new front desk and storage locations.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is soliciting proposals for a Firm-Fixed-Price task order under an 8(a) MACC IDIQ to replace two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures for protection against salt air and moisture. The scope includes integrating the generators with the existing fuel and electrical systems, installing two new NEMA 3R automatic transfer switches with rust-resistant enclosures, and securing the units to the existing concrete slab using Grade 5 or higher galvanized anchor bolts. A generator load bank test is required for both new units. The estimated project magnitude is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The award will be based solely on the lowest total evaluated price. Offerors must submit proposals by September 29, 2026, using a detailed pricing template broken down by CSI division. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and the provision of performance and payment bonds. Personnel must undergo security background checks, sign non-disclosure agreements, and obtain PIV cards for system access. The contractor is responsible for providing a project schedule within 15 days of the Notice to Proceed and must perform work during regular business hours, Monday through Friday, 7:30 am to 4:00 pm. Final acceptance is contingent upon preliminary and final inspections coordinated with the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
This project involves a firm-fixed-price task order under a MACC multiple-award IDIQ contract to upgrade the LED lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The scope of work includes providing all engineering, labor, supervision, equipment, and materials to replace existing fluorescent fixtures, lamps, and ballasts with energy-efficient LED lighting and occupancy sensors. The contractor is responsible for the removal and proper disposal or recycling of all replaced materials. The estimated magnitude of the project is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. Technical requirements include a minimum two-hour training session for facility maintenance personnel and a commissioning report verifying 100 percent fixture and control operation. The project must comply with the Davis-Bacon Act for prevailing wages and adhere to standards from OSHA, ADA, NFPA, the International Building Code, and the American Correctional Association. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to provide high-security, environmentally controlled space for forensic science technicians. The scope of work includes the installation of two 42ft by 10ft reinforced concrete slabs, connection to the nearest electrical circuit via PVC conduit, and the equipping of each unit with split-system A/C, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each office must also include four security windows and a 5-pound ABC fire extinguisher. The project is governed by NFPA 70 and International Building Code standards, with a requirement that all materials comply with the Buy America Act. The contract is a Firm-Fixed-Price task order issued under a MACC multiple-award IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with work conducted during standard business hours from Monday to Friday. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. Contractors must adhere to Davis-Bacon prevailing wage rates and meet strict security requirements, including the signing of DHS Non-Disclosure Agreements and the acquisition of ICE-provisioned PIV cards for personnel. Payment requests are to be submitted electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and disposal of seven existing electrical switchgear stations in Buildings 137 and 138 and the installation of new switchgear. This scope includes reworking existing conduits and conductors, reconnecting six stations to existing unit substation style transformers, and installing one new 480V dry type transformer to replace an existing 15kV switch and transformer. Additionally, a 5-way 15kV SF6 switch in Building 138 Vault 1 will be replaced with a new 6-way SF6 switch. The estimated cost for this work ranges from 1,000,000 to 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract is awarded based on the lowest price, with proposals due by 13:00 local time on September 10, 2026. Due to the critical nature of the electrical systems, power outages must be limited to 72 hours and scheduled over three-day holiday weekends. Technical requirements specify the use of factory-engineered switchboards with specific voltage ratings and a short-circuit current rating of 65,000 rms symmetrical amperes, adhering to NEMA PB 2 and UL 891 standards. Safety compliance is mandatory under EM 385-1-1 (2024), and specific restrictions apply to hazardous areas in Building 137. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Final acceptance is contingent upon a series of punch-out and pre-final inspections, with the contractor providing a certified QC Manager to oversee the project.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work involves removing six existing fire alarm bells and replacing them with six Cooper Wheelock HSW horn/strobe notification appliances, ensuring all new devices are integrated into the existing fire alarm system according to code and field conditions. Bids are due by September 16, 2026, and will be evaluated based on overall best value. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. The project is subject to Construction Wage Rate Requirements for federal facilities, requiring compliance with California prevailing wage determinations for San Bernardino County and weekly certified payroll submissions. For bids of $25,000 or more, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Required submission documents include the MTC Supplier Packet (W-9, Supplier Self-Certification, and Acceptance of Terms & Conditions), a detailed cost breakout covering materials, labor, and equipment, and a Unique Entity ID (UEI) for first-tier subcontractor reporting. Contract administration includes a two-stage inspection process consisting of a substantial completion inspection to develop a punch list, followed by a final inspection upon completion of all remaining items. Payment is processed via pay applications using ALA G702 G703 forms, supported by a previously submitted Schedule of Values. The contractor must begin work within five business days of the agreed-upon start date following the issuance of a Notice to Proceed. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and SDVOSB certifications.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Defense → FA2543 460 Cons

Same awarding agency

NAICS: 238330
New
Federal
FA2543 Chapel Carpet Replacement
Solicitation # FA2543ChapelCarpetReplacement
Solicitation FA254326Q0035 is a combined synopsis and request for quotes for the removal and replacement of carpet and baseboards at Buckley Space Force Base Chapel Building 316. This acquisition is a 100% small business set-aside under NAICS 238330 and will be awarded on a lowest-price-technically-acceptable basis. The scope of work includes the demolition and disposal of existing broadloom carpet, carpet tiles, and cove base in hallways, foyers, offices, the cry room, and the Fellowship Hall, as well as the permanent removal of folding wall dividers in the Fellowship Hall. Excluded areas include all restrooms, non-carpeted rooms, and the entire sanctuary area. The project must be completed within 60 calendar days after award, with all work performed during chapel duty hours. The contractor is required to provide all labor, materials, and equipment, including subfloor preparation and the installation of new owner-approved carpet. Key deliverables include a detailed phasing plan and a critical path method schedule to ensure the facility remains operational. Compliance requirements include adherence to OSHA provisions, AFMAN32-7002 Section 3 for hazardous materials, and AFI 10-701 for operations security. Bidders must submit documented evidence of qualifications, technical approaches, and warranty details with their quotes. Following an amendment to the solicitation close date, quotes are due to the contracting officer by 12:30 PM MDT on September 11, 2026.
Flooring Contractors

POSTED

about 15 hours ago

DEADLINE

in 1 day
View Details
NAICS: 238220
New
Federal
Buckley SFB - BDOC Chiller Replacement
Solicitation # FA254326Q0027
Solicitation FA254326Q0027 is a total small business set-aside for the replacement of the chilled water system and two computer room air handlers at Building 1028 (BDOC) at Buckley SFB, Colorado. The project requires the decommissioning and removal of existing equipment and the installation of a new Trane-series chiller system, adhering to Air Force Civil Engineering standardization guidance and specific technical standards including UFC 3-410-01, UFC 3-501-01, and 2026 EMCS standards. The contractor must provide temporary cooling to maintain server room temperatures during the transition and ensure the new system does not exceed the existing concrete pad load capacity of 12,000 lbs. All work must be completed within 30 calendar days after receipt of order. The government intends to award a fixed-price contract using the Lowest Price Technically Acceptable (LPTA) evaluation method. To be considered responsive, offerors must provide a price quote, a technical description of the work, warranty details, and two past performance citations from the last five years specifically involving the installation of Trane chiller equipment on government installations. A formal site visit is scheduled for September 1, 2026, and quotes are due by 10:00 AM MDT on September 9, 2026, although Amendment 1 notes a placeholder extension to September 15, 2026. Payments will be processed electronically via the Wide Area WorkFlow (WAWF) system.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 236220
Federal
ODR Countertop & Cabinets Replacement
Solicitation # FA254326Q0035
Solicitation FA254326Q0035 is a total small business set-aside for the renovation of the reception area at the Buckley Space Force Base Outdoor Recreation facility in Building 1022. The project requires the demolition and disposal of existing front counters, cabinetry, and flooring, followed by the installation of a new L-shaped front counter and a three-tiered back-wall storage system. The new counter must be ADA-compliant, featuring a 30-inch high section between two 42-inch high reception caps, and constructed from a seamless, one-piece 100% acrylic solid surface capable of supporting a 300-pound static load. The back-wall system will include lockable base cabinets, a center whiteboard, and open overhead shelving anchored to wall studs. Additionally, the contractor must install two ski desks and complete all necessary electrical conduit and plumbing hookups. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) evaluation method, with a proposed period of performance not to exceed 60 calendar days from the Notice to Proceed. All materials must be Buy America Act compliant, and labor must adhere to Davis-Bacon Act wage determinations for Arapahoe County, Colorado. Key requirements include a mandatory site visit on September 1, 2026, and the submission of BSFB Access Form 128 for base entry. Final acceptance is contingent upon a physical walkthrough and the resolution of all punch list items to the satisfaction of the ODR Manager. Proposals must include a technical narrative and a comprehensive cost proposal covering demolition, front-counter installation, and back-wall storage procurement.
Commercial and Institutional Building Construction

POSTED

23 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS