Elevator Replacement at San Diego Convention Center Parking Garage
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → San Diego Unified Port District
NAICS
N/A
Place of Performance
San Diego, CA, 92101Set-Aside
NONE
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Full Description
Show more
The proposed project would involve the replacement of existing passenger elevators at the San Diego Convention Center Parking Garage in the city of San Diego, California. The purpose of the proposed project is for the modernization of the existing elevators which require replacement due to their age and condition in order to maintain their operation. The proposed work would include the replacement of three (3) existing elevators, A, C, and F. Work to complete the proposed project would consist of the following:
Interior Improvements: Replacement of existing car operating panels, key switches, control buttons, and elevator equipment including cab finishes, rails, call buttons, cab door and door operators, lanterns, control systems, hall signals, floor indicators, and associated machine room equipment.
Exterior Improvements: Replacement of existing elevator glass panels with solid, durable infill panel materials. Replacement of existing call buttons and signage. Replacement of existing elevator doors with stainless steel doors.
The proposed work is anticipated to begin in Fall 2026 and would be carried out in two (2) phases over the course of approximately six (6) months, followed by a twelve (12) month maintenance phase, with ongoing maintenance as needed. The proposed project would require the utilization of approximately four (4) parking spaces for a staging area on the second floor of the parking garage. The proposed project would include phasing to comply with the Americans with Disabilities Act of 1990 to ensure the parking garage has at least one operational elevator on the floor over the course of the project. Phase 1 would consist of the replacement of elevator C, and is anticipated to take approximately three (3) months to complete. Phase 2 would consist of the replacement of elevators A and F, and is anticipated to take approximately three (3) months to complete. Interim preventative maintenance of all elevators would occur concurrently throughout the project.
Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. The District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.
