Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Elevator Replacement at San Diego Convention Center Parking Garage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Unified Port District is preparing to replace three aging passenger elevators—A, C, and F—at the San Diego Convention Center Parking Garage to ensure continued safe and compliant operation. The project, anticipated to begin in Fall 2026, will be executed in two distinct phases over approximately six months, with Elevator C replaced first, followed by Elevators A and F. Throughout the work, at least one elevator per floor will remain operational to satisfy ADA requirements, and interim preventative maintenance will be conducted on all units. Interior upgrades include new control panels, door operators, cab finishes, lighting, call buttons, and machine room equipment, while exterior improvements involve replacing glass panels with solid infill, installing stainless steel doors, and updating signage. A dedicated staging area requiring four parking spaces on the second floor will be used during construction, and the work is not expected to generate significant traffic, emissions, or environmental impact due to its limited scope. Following active construction, a twelve-month maintenance phase will begin, with additional ongoing maintenance as needed. The project is governed by compliance with the Americans with Disabilities Act of 1990 and California Environmental Quality Act categorical exemptions under Sections 15301 and 15302, which classify the replacement as an existing facility upgrade. All hazardous material handling, demolition debris, and stormwater management will adhere to federal, state, and local regulations. While no formal contract clauses, pricing, evaluation factors, or federal acquisition regulations are present in the documentation, the scope is clearly defined and supported by environmental filing records and administrative contacts at the San Diego Unified Port District. The engineering lead and planner serve as the primary points of contact, and inspection and acceptance will occur on-site at the parking garage. No subcontracting, security clearances, or special clauses are indicated, and the procurement is presented as a forecast rather than a formal solicitation, suggesting a streamlined municipal project approach without the complexity of federal procurement structures.

General Info

Replace elevators A, C, F at San Diego Convention Center garage starting Fall 2026, ensuring ADA compliance and minimal disruption.

Agency

California → San Diego Unified Port District

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

San Diego, CA, 92101

Set-Aside

NONE

Documents

(1)

2024-095 Elevator Replacement at San Diego Convention Center Parking Garage NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts

Full Description

Show more
The proposed project would involve the replacement of existing passenger elevators at the San Diego Convention Center Parking Garage in the city of San Diego, California. The purpose of the proposed project is for the modernization of the existing elevators which require replacement due to their age and condition in order to maintain their operation. The proposed work would include the replacement of three (3) existing elevators, ‘A’, ‘C’, and ‘F’. Work to complete the proposed project would consist of the following: • Interior Improvements: Replacement of existing car operating panels, key switches, control buttons, and elevator equipment including cab finishes, rails, call buttons, cab door and door operators, lanterns, control systems, hall signals, floor indicators, and associated machine room equipment. • Exterior Improvements: Replacement of existing elevator glass panels with solid, durable infill panel materials. Replacement of existing call buttons and signage. Replacement of existing elevator doors with stainless steel doors. The proposed work is anticipated to begin in Fall 2026 and would be carried out in two (2) phases over the course of approximately six (6) months, followed by a twelve (12) month maintenance phase, with ongoing maintenance as needed. The proposed project would require the utilization of approximately four (4) parking spaces for a staging area on the second floor of the parking garage. The proposed project would include phasing to comply with the Americans with Disabilities Act of 1990 to ensure the parking garage has at least one operational elevator on the floor over the course of the project. Phase 1 would consist of the replacement of elevator ‘C’, and is anticipated to take approximately three (3) months to complete. Phase 2 would consist of the replacement of elevators ‘A’ and ‘F’, and is anticipated to take approximately three (3) months to complete. Interim preventative maintenance of all elevators would occur concurrently throughout the project. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. The District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code