Elk River Hatchery New Rearing Ponds

Closed
S-63500-00010567State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Elk River Hatchery New Rearing Ponds project involves constructing two new concrete rearing ponds along with a pump station equipped with electrical and mechanical systems to support hatchery operations. The contract also includes bid alternates for the addition of two more concrete ponds and paving of the surrounding area, providing potential scope expansions. The project is managed by the Oregon Department of Fish and Wildlife and is set within Oregon, with a contract value estimated between $500,000 and $1,500,000. Bidders are invited to respond by July 30, 2024, with inquiries directed to the designated contact email and phone number. The solicitation aims to enhance hatchery capacity and infrastructure, supporting fish rearing activities in the region.

Documents

1
PDF, High priority: read this firstitb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon Department of Fish and Wildlife
Contacts1 person available
OfficeN/A

Full Description

Show more
The purpose of this ITB is to establish a contract for the Elk River Hatchery New Rearing Ponds to include the construction of two new concrete rearing ponds, and pump station with electrical and mechanical equipment. Bid Alternates of two additional concrete ponds and area paving include in ITB.

More opportunities from Oregon Department of Fish and Wildlife

Same awarding agency

NAICS: 238210
New
SLED
Umatilla Hatchery Generator Replacements
Solicitation # S-63500-00017967
The Oregon Department of Fish and Wildlife is soliciting bids for the replacement and installation of two generators at the Umatilla Fish Hatchery located in Irrigon, Oregon. The scope of work includes the delivery and installation of replacement generators at the pump station and mechanical building, the disposal of two existing units, and ensuring that new equipment is comparable to existing units and compatible with current transfer switches. All installations must be completed by July 30, 2027. The contract also includes an optional bid alternate for annual maintenance of the new generators. The agency will award the contract to the lowest responsive and responsible bidder based on a total price evaluation that includes base bids and bid alternates. Bidders must submit a comprehensive package via OregonBuys by December 29, 2026, including a bid cover sheet, pricing form, responsibility inquiry, and three references from similar projects completed within the last five years. The project is subject to the Oregon Prevailing Wage Rate Law and requires compliance with Build America, Buy America provisions. Final acceptance of the deliverables will be determined by ODFW facility staff based on whether the generators meet operational needs, with a review period of 15 business days following delivery.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 481211
New
SLED
North Willamette Watershed District Aerial Elk Surveys
Solicitation # S-63500-00018305
The Oregon Department of Fish and Wildlife is soliciting a proposer to provide a helicopter, a highly experienced pilot, and support services, including a fuel truck and licensed driver, to conduct aerial elk surveys. The scope of work involves transporting up to three observers to count and photograph elk herds across the East slope of the Coast Range Mountains and the West slope of the Cascade Mountains in Northwest Oregon. Operations will cover forested, clear-cut, and agricultural lands from sea level up to 4,500 feet elevation. The required equipment must be a Bell 206BIII JetRanger or an equivalent aircraft with at least 340 horsepower. Both the pilot and the aircraft must be FAR Part 135 certified, and all repairs must adhere to these standards. Additionally, flights conducted after March 1st must be performed in a manner that avoids disturbing spotted owls. The first period of performance is scheduled from January 15, 2027, to March 15, 2027, with the understanding that flight schedules may be adjusted due to weather or elk distribution. This contract is funded by federal funds, and the award will be granted to the highest-ranking responsible proposer based on a specific scoring methodology. Proposers must submit their proposals electronically via OregonBuys by December 9, 2026. Required submission documents include a separate price proposal, a certification sheet, a reference check form, and a disadvantaged business outreach plan. The agency will determine the acceptance of deliverables within 15 business days of receipt.
Nonscheduled Chartered Passenger Air Transportation

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS