Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Energy Conservation Material Supply

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of NTV 25151.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pre-RFP Engagement: Direct Install Program Delivery Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → British Columbia Hydro and Power Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies energy-saving hardware for prime contractors on BC Hydro Power Smart 2.0 projects. Sources and delivers bulk quantities of LED lamps, smart thermostats, and high-efficiency building controllers. Requires products with Energy Star or UL certifications. Delivers specified Energy Conservation Measure (ECM) hardware to Program Delivery Agents or customer sites.

Similar Contracts

Same NAICS industry code

More opportunities from Province of British Columbia → British Columbia Hydro and Power Authority

Same awarding agency

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
Engineering Services

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details
NAICS: 238210
New
International
Pre-RFP Engagement: Direct Install Program Delivery Services
Solicitation # NTV 25151
The British Columbia Hydro and Power Authority is conducting a pre-solicitation engagement under notice NTV 25151 to identify potential Program Delivery Agents for a Direct Install Program supporting the Power Smart 2.0 plan. This initiative aims to remove barriers for residential, commercial, and light industrial customers across British Columbia in adopting Energy Conversation Measures. The scope of work includes program management, start-up, administration, subcontractor management, customer assessments, and installation services. Specific technologies to be implemented include electric vehicle chargers, home batteries, lighting, and smart thermostats for electric baseboard heating, with potential additional requirements for marketing and incentive administration. This current notice is a pre-RFP engagement and does not constitute a formal call for tenders or a legal contractual obligation. Interested parties were invited to a supplier engagement call on November 5, 2026, with registration managed by Robert Asante. Final procurement details, including evaluation factors, weights, and the basis for award, will be provided in the subsequent formal solicitation, RFP 25138, which will be posted on BC Bid. The response deadline for this pre-solicitation phase is November 25, 2026.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement