This Government Contract opportunity from Arizona was posted on September 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Energy Supply – 25 MW Firm Delivery (West Wing 500 kV)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221111
SLED
Relicensing of Helms Pumped Storage Project
Solicitation # 2025110960
The State Water Resources Control Board is overseeing the FERC relicensing of the 1,212-megawatt Helms Pumped Storage Project, operated by Pacific Gas and Electric Company (PG&E) in Fresno and Madera Counties, California. The project scope includes the continued operation of the facility, the rehabilitation and replacement of existing recreation facilities, and the formal designation of approximately 36 miles of roads and one mile of trails as project infrastructure. Additionally, the project involves modifying the FERC Project boundary to accurately define lands necessary for operation and maintenance and implementing new protection, mitigation, and enhancement plans. Environmental compliance has been managed through the California Environmental Quality Act (CEQA) process, resulting in a Final Mitigated Negative Declaration in July 2026. This determination concluded that the project would not significantly affect the environment, and no further mitigation conditions or monitoring plans were required. Key regulatory requirements include obtaining a water quality certification under section 401 of the federal Clean Water Act and adhering to CalGEM guidelines regarding the safety and abandonment of oil, gas, or geothermal wells within the project area. The project is supported by Stantec Consulting Services, Inc., and involves coordination with trustee agencies such as the California Department of Fish and Wildlife.
State Water Resources Control Board

POSTED

3 months ago

DEADLINE

N/A
NAICS: 221111
SLED
Bucks Creek Hydroelectric Project (FERC Project No. 619)
Solicitation # 2019069104
Pacific Gas and Electric Company is seeking water quality certification for the Bucks and Grizzly Creek Gravel Augmentation Project in Plumas County, California. This initiative implements the Gravel Augmentation Plan required by Condition 14 of the Bucks Creek Hydroelectric Project certification to enhance trout spawning habitats and populations. The project involves placing gravel at two specific sites: one on Bucks Creek approximately 0.3 miles downstream of the Lower Bucks Dam Spillway, and another on Grizzly Creek about 400 feet downstream of the gaging weir. To facilitate these activities, the company is pursuing Clean Water Act Section 404 permitting under the United States Army Corps of Engineers Regional General Permit 16 for aquatic habitat restoration and enhancement. The project is governed by the California Environmental Quality Act, with a CEQA Supplement prepared to ensure environmental compliance. Notices of Determination filed by the State Water Resources Control Board confirm that the project will not have a significant environmental effect, and no mitigation measures or monitoring plans were adopted. Administrative oversight involves the State Water Resources Control Board Division of Water Rights, with the project identified under solicitation number 2019069104. Performance is centered in Plumas County, specifically near Quincy, California.
City of Santa Clara

POSTED

5 months ago

DEADLINE

N/A
NAICS: 221111
SBIR / STTR
Energy Technologies
Solicitation # NSF 26-510
The National Science Foundation issued solicitation NSF 26-510 on May 22, 2026, for the Small Business Innovation Research and Small Business Technology Transfer Phase I, Phase II, and Fast-Track programs. This initiative focuses on developing deep technologies to enhance U.S. competitiveness and security, with a specific emphasis on Energy Technologies. Targeted areas include new energy sources, power generation, energy storage, electronic systems for mobile and off-grid applications, carbon conversion, and disruptive technologies in natural gas exploration. The program also encourages proposals integrating energy technologies with data, nature-inspired sustainable solutions, and methods to reduce the resource intensity of hydrocarbon extraction. The total anticipated funding for the program is 210 million dollars, with individual award limits ranging from 305,000 dollars for Phase I to 1,250,000 dollars for Phase II and 1,555,555 dollars for Fast-Track proposals. Strategic Breakthrough proposals may request up to 30 million dollars. Proposals are evaluated based on intellectual merit, broader impacts, and commercial potential, with a preference for institutions with lower indirect cost rates if merit reviews are equal. Submission deadlines occur multiple times between July 2026 and July 2027, and applicants must comply with the Proposal and Award Policies and Procedures Guide. Eligible participants are limited to one proposal per organization and one per Principal Investigator. The Principal Investigator must be employed by the small business at least 51 percent of the time and maintain a legal right to work in the United States. Minimum effort requirements for the Principal Investigator vary by phase, ranging from one calendar month per six months for Phase I and II to three calendar months per six months for Fast-Track. The submission process begins with a Project Pitch, with a limit of two pitches per company per year and a maximum of three pitches for any single technology.
National Science Foundation

POSTED

5 months ago

DEADLINE

in 8 months

AI Contract Overview

Show more

The City of Mesa in Arizona is seeking a subcontractor for the delivery of 25 MW of firm energy to be supplied at the West Wing 500 kV substation. This project is designed to ensure grid stability and provide a reliable transmission-level supply over a multi-year term. The procurement falls under NAICS code 221111, focusing on hydroelectric power generation. Interested parties must submit their responses by the deadline of October 7, 2024. Further information and submission details can be accessed through the official vendor portal for the City of Mesa.

General Info

City of Mesa seeks hydroelectric subcontractor for 25 MW energy delivery by October 7.

Agency

Arizona → City of Mesa

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of EPRFP – 2025047.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Electric Power Supply Products

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Mesa
ContactsNo contacts available
OfficeN/A
Organization / Agency
Arizona → City of Mesa
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Deliver 25 MW of firm energy at West Wing 500 kV substation for grid stability and transmission-level supply over a multi-year term.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS