Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Utah was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion, Dust, and Sediment Control

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of all visible and exposed interior components, as well as the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the April 11, 2024, Micro Air Inc. Mold Testing report, with Indiana state laws prevailing where more stringent than federal requirements. Key deliverables include the provision of a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough, a detailed remediation plan featuring HEPA filtration and negative air pressure, and the submission of all required permits and licenses. This is a small business set-aside opportunity requiring a single lump sum bid. Award decisions are based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Successful offerors must provide proof of a valid Indiana Contractor's License, Davis-Bacon Act wage rate compliance, and specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must commence work within 14 days of the Notice to Proceed and provide a sequenced construction schedule within 10 days of that notice. Payment terms are Net 30. Proposals must include a detailed cost breakdown, a timeline for substantial completion, a W9, and a completed vendor questionnaire.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 562910
New
SLED
Environmental Clean-Up Services
Solicitation # IFB-080-3112101-EL
The County of Orange OC Public Works is soliciting bids under IFB-080-3112101-EL for emergency and non-emergency environmental clean-up services. The scope of work involves investigating and addressing pollution incidents, including accidental spills, illegal discharges, and abandoned materials, across unincorporated communities, County roadways, facilities, harbors, parks, beaches, and Flood Control District channels. Key deliverables include containment and recovery, high-pressure washing, waste management, and specialized remediation such as trauma scene and blood-borne pathogen decontamination. The contract has a not-to-exceed ceiling of 1,500,000.00 dollars, with payments made net thirty days in arrears based on quoted unit rates for labor, equipment, and materials. Qualified contractors must hold California State Contractor License Board Class A and HAZ certifications, maintain a valid U.S. EPA Identification Number, and ensure staff are HAZWOPER certified. Emergency response requirements are stringent, requiring resource confirmation within 10 minutes, a field supervisor on-scene within 30 minutes, and full mobilization within 90 minutes. Bids will be awarded to the lowest responsive and responsible bidder, with preference percentages applied to certified OCLSB and DVBE businesses. Submissions must be made electronically via the OpenGov portal by November 4, 2026, at 2:00 PM PT. Awardees are required to provide a Faithful Performance Bond and a Labor and Material Payment Bond, and must comply with California prevailing wage laws and OSHA safety standards.
OC Public Works

POSTED

about 23 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract focuses on the implementation of environmental protection measures during construction activities, specifically addressing erosion control, dust suppression, and sediment management. It requires the installation and maintenance of erosion control devices such as silt fences, wattles, and seeding to prevent soil displacement. Additionally, the contract mandates the use of water trucks and chemical binders to manage dust levels, as well as sediment control practices during excavation and dewatering processes to minimize environmental impact. This subcontract, titled "Erosion, Dust, and Sediment Control," is associated with NAICS code 562910, which pertains to waste treatment and disposal services. The contract was posted on June 11, 2026, with a response deadline set for June 26, 2026. It is issued by the state of Utah, although specific location details and contact information are not provided. The contract aims to ensure compliance with environmental regulations and enhance site safety and sustainability throughout the project duration.

General Info

Implementation of erosion control, dust suppression, and sediment management during construction activities.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of D001.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

The Deseret Public Infrastructure District - Wastewater Extension Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implementation of erosion control measures (silt fences, wattles, seeding), dust suppression (water trucks, chemical binders), and sediment control during excavation and dewatering.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

about 24 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS