Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

EV Charging Infrastructure Engineering & Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for EV Charging Infrastructure Engineering and Design involves providing technical engineering and site planning services for municipal and school facility projects within the City of Hartford. The selected provider will work under prime consultants to develop conceptual site plans, technical specifications, and design criteria, while specifically evaluating load impacts and demand charge management for both Level 2 and DC Fast Chargers. Key requirements for this engagement include a valid Professional Engineer license and strict compliance with Connecticut NEVI requirements. The scope of work culminates in the delivery of comprehensive site plans and detailed design reviews. This opportunity is managed by the Procurement Services Unit of the City of Hartford, with a response deadline set for November 19, 2026.

General Info

Engineering and design subcontract for Hartford EV charging infrastructure due November 19, 2026.

Documents

This scope was carved out of 6304.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On Call Electric Vehicle (EV) Consultant Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Procurement Services Unit Department of City of Hartford
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical engineering design and site planning for EV charging stations for prime consultants on City of Hartford municipal and school facility projects. Develops conceptual site plans, technical specifications, and design criteria. Evaluates load impacts and demand charge management for Level 2 and DC Fast Chargers. Requires Professional Engineer (PE) license and compliance with CT NEVI requirements. Delivers site plans and design reviews.

Similar Contracts

Same NAICS industry code

More opportunities from Connecticut → Procurement Services Unit Department of City of Hartford

Same awarding agency

New
SLED
Graffiti Removal Services
Solicitation # 6313
The City of Hartford, through its Procurement Services Unit, is soliciting graffiti removal services under solicitation number 6313. The contractor is responsible for providing all labor, equipment, and materials to remove unauthorized drawings, markings, and adhesive stickers from City property using high-pressure washing, chemicals, solvents, and paint. Performance is restricted to City property and excludes the Hartford Business Improvement District, State of Connecticut property, Hartford Public Schools property, and MDC boxes. Work orders from the 311 Call Center must be completed within 48 hours, with a reduced 24-hour window for designated hot spots or hate crime and inflammatory graffiti. The contractor must utilize the City of Hartford Graffiti Tracker web-based system, provide date and time stamped before-and-after digital images for every order, and submit quarterly summary reports. The selection process is not based solely on price and may favor the lowest responsible candidate, with a specific preference for City-based SC/MWBE Certified Small Businesses whose bids are within 15 percent of the low bid. Awardees must adhere to State of Connecticut, Federal, and City of Hartford living wage rates and implement an operations and maintenance safety plan within 60 days of contract execution. Payment is issued within 30 days of receiving an acceptable invoice. For construction or infrastructure components, a 15 percent minority business utilization set-aside is required. All responses must be submitted via the designated procurement portal by the deadline of November 18, 2026.

POSTED

1 day ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS