Filtration System Manufacturer

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Yuma is seeking a qualified subcontractor for the Main Street WTP Filter System Upgrade III project to supply and install core filtration components. The selected manufacturer must be approved by the Engineer and possess a proven track record in filter rehabilitation to deliver a complete, operable plastic block filter underdrain system and associated equipment for four filters. This system is designed to collect filtered water and manage the distribution of backwash air and water. The solicitation was posted on September 16, 2026, with a response deadline of October 20, 2026. Classified under NAICS code 333911, this subcontract requires the provider to furnish all necessary materials and labor to ensure the successful integration of the filtration components for the prime contractor.

General Info

City of Yuma seeks subcontractor to supply and install four filter underdrain systems.

Agency

Arizona → City Of YumaView Agency

NAICS

333911 - Pump and Pumping Equipment ManufacturingView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-27-014.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Main Street WTP, Filter System Upgrade III

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → City Of Yuma
ContactsNo contacts available
OfficeN/A
Organization / Agency
Arizona → City Of Yuma
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs core filtration components for prime contractors on Main Street WTP Filter System Upgrade III projects. Furnishes and installs a plastic block filter underdrain system and equipment to collect filtered water and distribute backwash air and water. Must be a manufacturer approved by the Engineer and regularly engaged in filter rehabilitation. Delivers a complete, operable filter underdrain system for 4 filters.

Similar Contracts

Same NAICS industry code

More opportunities from Arizona → City Of Yuma

Same awarding agency

NAICS: 237110
New
SLED
Main Street WTP, Filter System Upgrade III
Solicitation # RFB-27-014
The City of Yuma is soliciting bids for RFB-27-014, the Main Street Water Treatment Plant Filter System Upgrade III (CIP Project No: 0037-Water10). This Design-Bid-Build project involves the rehabilitation and upgrade of Filters 9, 10, 11, and 12. The scope of work includes the demolition of obsolete conduit, wiring, instrumentation, controls, process valves, flow meters, underdrains, and filter media. The contractor will furnish and install a new underdrain system, specified media, electric process valves with actuators, turbidity meters, and a backwash blower with associated piping and foundations. Additionally, the project requires integrating PLC/HMI/SCADA systems, alarms, and interlocks, while maintaining plant operations through filter-by-filter sequencing and temporary isolation. The contract will be awarded to the lowest responsive and responsible bidder based on a combination of lump sum and unit prices. Substantial completion is required within 270 calendar days of the Notice to Proceed, with final completion within 300 calendar days. Key requirements include providing a minimum one-year warranty on installed equipment, submitting as-built drawings and O&M manuals, and adhering to strict packaging and storage standards for mechanical and electrical equipment. Bidders must provide an Arizona Statutory Bid Bond of 10 percent of the bid amount and a full payment bond upon award. The project is funded by local sources and requires compliance with the ADA, the Drug Free Workplace Act of 1989, and the Immigration Reform and Control Act of 1986.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS